Title Page

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Area 1 Reception/Foyer-Pictures taken of ALL remedials, add these remedials to site 'Heldpdesk' or Forward Planning logs if no remedials but life cycle renewal project needed.

Monthly Inspections

  • Building fabric: Doors/Fire doors, Ceiling finishes openable windows, Glass/windows seals/fixings,internal wall finishes, floor finishes all Inspections associated to this area as per PFP spec.

  • Full Locker inspection completed

  • Full Cubical inspection completed

  • Sanitary Fittings-showers/buttons, toilet seats, Pans, pan flushing mechanism, sinks, taps, urinals, urinal flushing mechanism, all safe secure free from damage and in working order as per PFP quarterly Spec however due to usage check monthly

  • Vents/Grills/AC Filters cleaned If applicable to this area.

  • Note No Asbestos located within this area, however it is presumed as when survey was completed no access was possible at the time of test If major works are required Asbestos survey will need completing prior to carrying out, however Each lift engineer on attendance needs to be informed of potential asbestos and report back if they are completing any works out of normal service works which could potentially disrupt/expose any asbestos that may be present. Tick yes that you are noting this and managing accordingly

  • Asbestos Item Number 037 - Ground floor
    - Entrance lobby lift shaft -
    Inaccessible - No access to
    internal aspects of lift shaft.

    IMG_8681 (002).JPG
  • Asbestos Item Number 038 - First floor -
    Lift shaft - Inaccessible - No
    access to internal aspects of lift
    shaft.

    IMG_8682 (002).JPG

Monthly Electrical Checks-Emergency lighting and general lighting Monthly, FAT monthly, Fixed Wiring (switches,Sockets,Fixings) RCD’s and PAT items as per PFP guidance Quarterly. All new PAT items to be added to the online List of items. All remedials take picture evidence Make safe/repair where needed with items added to the site ‘Helpdesk’ log.

  • Room lighting inspection/Emergency Lighting inspection visual/flick test completed?

  • Electrical Fixed Wiring Inspections- Due and Inspection Complete? Jan/Apr/Jul/Oct

  • FAT inspection completed if applicable to this area?

  • PAT inspection completed-if due and applicable to this area? Jan/Apr/Jul/Oct

  • RCD inspection completed-if due and applicable to this area? Jan/Apr/Jul/Oct

  • Hair drier replacement carried out this month if applicable to this area? June-Hair driers with loose leads

  • Hair driers serviced if applicable to this area?

Area 2 Admin Office-Pictures taken of ALL remedials, add these remedials to site 'Heldpdesk' or Forward Planning logs if no remedials but life cycle renewal project needed.

Monthly Inspections

  • Building fabric: Doors/Fire doors, Ceiling finishes openable windows, Glass/windows seals/fixings,internal wall finishes, floor finishes all Inspections associated to this area as per PFP spec.

  • Full Locker inspection completed

  • Full Cubical inspection completed

  • Sanitary Fittings-showers/buttons, toilet seats, Pans, pan flushing mechanism, sinks, taps, urinals, urinal flushing mechanism, all safe secure free from damage and in working order.

  • Vents/Grills/AC Filters cleaned If applicable to this area.

Monthly Electrical Checks-Emergency lighting and general lighting Monthly, FAT monthly, Fixed Wiring (switches,Sockets,Fixings) RCD’s and PAT items as per PFP guidance Quarterly. All new PAT items to be added to the online List of items. All remedials take picture evidence Make safe/repair where needed with items added to the site ‘Helpdesk’ log.

  • Room lighting inspection/Emergency Lighting inspection visual/flick test completed?

  • Electrical Fixed Wiring Inspections- Due and Inspection Complete? Jan/Apr/Jul/Oct

  • FAT inspection completed if applicable to this area?

  • PAT inspection completed if applicable to this area and month? Jan/Apr/Jul/Oct

  • RCD inspection completed-if due and applicable to this area? Jan/Apr/Jul/Oct

  • Hair drier replacement carried out this month if applicable to this area? June-Hair driers with loose leads

  • Hair driers serviced if applicable to this area?

Area 3 Sales office-Pictures taken of ALL remedials, add these remedials to site 'Heldpdesk' or Forward Planning logs if no remedials but life cycle renewal project needed.

Monthly Inspections

  • Building fabric: Doors/Fire doors, Ceiling finishes openable windows, Glass/windows seals/fixings,internal wall finishes, floor finishes all Inspections associated to this area as per PFP spec.

  • Full Locker inspection completed

  • Full Cubical inspection completed

  • Sanitary Fittings-showers/buttons, toilet seats, Pans, pan flushing mechanism, sinks, taps, urinals, urinal flushing mechanism, all safe secure free from damage and in working order.

  • Vents/Grills/AC Filters cleaned If applicable to this area.

Monthly Electrical Checks-Emergency lighting and general lighting Monthly, FAT monthly, Fixed Wiring (switches,Sockets,Fixings) RCD’s and PAT items as per PFP guidance Quarterly. All new PAT items to be added to the online List of items. All remedials take picture evidence Make safe/repair where needed with items added to the site ‘Helpdesk’ log.

  • Room lighting inspection/Emergency Lighting inspection visual/flick test completed?

  • Electrical Fixed Wiring Inspections- Due and Inspection Complete? Jan/Apr/Jul/Oct

  • FAT inspection completed if applicable to this area?

  • PAT inspection completed if applicable to this area and month? Jan/Apr/Jul/Oct

  • RCD inspection completed-if due and applicable to this area? Jan/Apr/Jul/Oct

  • Hair drier replacement carried out this month if applicable to this area? June-Hair driers with loose leads

  • Hair driers serviced if applicable to this area?

Area 4 Squash Corridor/Courts-Pictures taken of ALL remedials, add these remedials to site 'Heldpdesk' or Forward Planning logs if no remedials but life cycle renewal project needed.

  • Building fabric: Doors/Fire doors, Ceiling finishes openable windows, Glass/windows seals/fixings,internal wall finishes, floor finishes all Inspections associated to this area as per PFP spec.

  • Full Locker inspection completed

  • Full Cubical inspection completed

  • Sanitary Fittings-showers/buttons, toilet seats, Pans, pan flushing mechanism, sinks, taps, urinals, urinal flushing mechanism, all safe secure free from damage and in working order.

  • Vents/Grills/AC Filters cleaned If applicable to this area.

Monthly Electrical Checks-Emergency lighting and general lighting Monthly, FAT monthly, Fixed Wiring (switches,Sockets,Fixings) RCD’s and PAT items as per PFP guidance Quarterly. All new PAT items to be added to the online List of items. All remedials take picture evidence Make safe/repair where needed with items added to the site ‘Helpdesk’ log.

  • Room lighting inspection/Emergency Lighting inspection visual/flick test completed?

  • Electrical Fixed Wiring Inspections- Due and Inspection Complete? Jan/Apr/Jul/Oct

  • FAT inspection completed if applicable to this area?

  • PAT inspection completed if applicable to this area and month? Jan/Apr/Jul/Oct

  • RCD inspection completed-if due and applicable to this area? Jan/Apr/Jul/Oct

  • Hair drier replacement carried out this month if applicable to this area? June-Hair driers with loose leads

  • Hair driers serviced if applicable to this area?

Area 5 Staff Room-Pictures taken of ALL remedials, add these remedials to site 'Heldpdesk' or Forward Planning logs if no remedials but life cycle renewal project needed.

  • Building fabric: Doors/Fire doors, Ceiling finishes openable windows, Glass/windows seals/fixings,internal wall finishes, floor finishes all Inspections associated to this area as per PFP spec.

  • Full Locker inspection completed

  • Full Cubical inspection completed

  • Sanitary Fittings-showers/buttons, toilet seats, Pans, pan flushing mechanism, sinks, taps, urinals, urinal flushing mechanism, all safe secure free from damage and in working order.

  • Vents/Grills/AC Filters cleaned If applicable to this area.

Monthly Electrical Checks-Emergency lighting and general lighting Monthly, FAT monthly, Fixed Wiring (switches,Sockets,Fixings) RCD’s and PAT items as per PFP guidance Quarterly. All new PAT items to be added to the online List of items. All remedials take picture evidence Make safe/repair where needed with items added to the site ‘Helpdesk’ log.

  • Room lighting inspection/Emergency Lighting inspection visual/flick test completed?

  • Electrical Fixed Wiring Inspections- Due and Inspection Complete? Jan/Apr/Jul/Oct

  • FAT inspection completed if applicable to this area?

  • PAT inspection completed if applicable to this area and month? Jan/Apr/Jul/Oct

  • RCD inspection completed-if due and applicable to this area? Jan/Apr/Jul/Oct

  • Hair drier replacement carried out this month if applicable to this area? June-Hair driers with loose leads

  • Hair driers serviced if applicable to this area?

Area 6 Studio 1-pictures taken of ALL remedials, add these remedials to site 'Heldpdesk' or Forward Planning logs if no remedials but life cycle renewal project needed.

  • Building fabric: Doors/Fire doors, Ceiling finishes openable windows, Glass/windows seals/fixings,internal wall finishes, floor finishes all Inspections associated to this area as per PFP spec.

  • Full Locker inspection completed

  • Full Cubical inspection completed

  • Sanitary Fittings-showers/buttons, toilet seats, Pans, pan flushing mechanism, sinks, taps, urinals, urinal flushing mechanism, all safe secure free from damage and in working order.

  • Vents/Grills/AC Filters cleaned If applicable to this area.

Monthly Electrical Checks-Emergency lighting and general lighting Monthly, FAT monthly, Fixed Wiring (switches,Sockets,Fixings) RCD’s and PAT items as per PFP guidance Quarterly. All new PAT items to be added to the online List of items. All remedials take picture evidence Make safe/repair where needed with items added to the site ‘Helpdesk’ log.

  • Room lighting inspection/Emergency Lighting inspection visual/flick test completed?

  • Electrical Fixed Wiring Inspections- Due and Inspection Complete? Jan/Apr/Jul/Oct

  • FAT inspection completed if applicable to this area?

  • PAT inspection completed if applicable to this area and month? Jan/Apr/Jul/Oct

  • RCD inspection completed-if due and applicable to this area? Jan/Apr/Jul/Oct

  • Hair drier replacement carried out this month if applicable to this area? June-Hair driers with cable leads replaced

  • Hair driers serviced if applicable to this area?

Area 7 Plantroom/Landing outside leading to First floor Area-Pictures taken of ALL remedials, add these remedials to site 'Heldpdesk' or Forward Planning logs if no remedials but life cycle renewal project needed.

  • Building fabric: Doors/Fire doors, Ceiling finishes openable windows, Glass/windows seals/fixings,internal wall finishes, floor finishes all Inspections associated to this area as per PFP spec.

  • Full Locker inspection completed

  • Full Cubical inspection completed

  • Sanitary Fittings-showers/buttons, toilet seats, Pans, pan flushing mechanism, sinks, taps, urinals, urinal flushing mechanism, all safe secure free from damage and in working order.

  • Vents/Grills/AC Filters cleaned If applicable to this area.

  • View Asbestos located in this area for change compared to original survey (below in comments) and since last check, take a picture of its current condition, if change has occurred please report this, make sure label identifying asbestos is in place.

  • Asbestos Item Number 006 - Ground floor
    - Boiler room - Gasket(s) to
    flange joints to steel pipework
    at high level behind calorifiers.

    IMG_8676 (002).JPG

Monthly Electrical Checks-Emergency lighting and general lighting Monthly, FAT monthly, Fixed Wiring (switches,Sockets,Fixings) RCD’s and PAT items as per PFP guidance Quarterly. All new PAT items to be added to the online List of items. All remedials take picture evidence Make safe/repair where needed with items added to the site ‘Helpdesk’ log.

  • Room lighting inspection/Emergency Lighting inspection visual/flick test completed?

  • Electrical Fixed Wiring Inspections- Due and Inspection Complete? Jan/Apr/Jul/Oct

  • FAT inspection completed if applicable to this area?

  • PAT inspection completed if applicable to this area and month? Jan/Apr/Jul/Oct

  • RCD inspection completed-if due and applicable to this area? Jan/Apr/Jul/Oct

  • Hair drier replacement carried out this month if applicable to this area? June-Hair driers with loose leads replaced

  • Hair driers serviced if applicable to this area?

Area 8-First Floor Ladies Change Corridor from door down to bottom of stairs and 2x Store rooms Pictures taken of ALL remedials, add these remedials to site 'Heldpdesk' or Forward Planning logs if no remedials but life cycle renewal project needed.

  • Building fabric: Doors/Fire doors, Ceiling finishes openable windows, Glass/windows seals/fixings,internal wall finishes, floor finishes all Inspections associated to this area as per PFP spec.

  • Full Locker inspection completed

  • Full Cubical inspection completed

  • Sanitary Fittings-showers/buttons, toilet seats, Pans, pan flushing mechanism, sinks, taps, urinals, urinal flushing mechanism, all safe secure free from damage and in working order.

  • Vents/Grills/AC Filters cleaned If applicable to this area.

Monthly Electrical Checks-Emergency lighting and general lighting Monthly, FAT monthly, Fixed Wiring (switches,Sockets,Fixings) RCD’s and PAT items as per PFP guidance Quarterly. All new PAT items to be added to the online List of items. All remedials take picture evidence Make safe/repair where needed with items added to the site ‘Helpdesk’ log.

  • Room lighting inspection/Emergency Lighting inspection visual/flick test completed?

  • Electrical Fixed Wiring Inspections- Due and Inspection Complete? Jan/Apr/Jul/Oct

  • FAT inspection completed if applicable to this area?

  • PAT inspection completed if applicable to this area and month? Jan/Apr/Jul/Oct

  • RCD inspection completed-if due and applicable to this area? Jan/Apr/Jul/Oct

  • Hair drier replacement carried out this month if applicable to this area? June-Hair driers with cable leads replaced

  • Hair driers serviced if applicable to this area?

Area 9 Female Change/Intake Room-Pictures taken of ALL remedials, add these remedials to site 'Heldpdesk' or Forward Planning logs if no remedials but life cycle renewal project needed.

  • Building fabric: Doors/Fire doors, Ceiling finishes openable windows, Glass/windows seals/fixings,internal wall finishes, floor finishes all Inspections associated to this area as per PFP spec.

  • Full Locker inspection completed

  • Full Cubical inspection completed

  • Sanitary Fittings-showers/buttons, toilet seats, Pans, pan flushing mechanism, sinks, taps, urinals, urinal flushing mechanism, all safe secure free from damage and in working order.

  • Vents/Grills/AC Filters cleaned If applicable to this area.

Monthly Electrical Checks-Emergency lighting and general lighting Monthly, FAT monthly, Fixed Wiring (switches,Sockets,Fixings) RCD’s and PAT items as per PFP guidance Quarterly. All new PAT items to be added to the online List of items. All remedials take picture evidence Make safe/repair where needed with items added to the site ‘Helpdesk’ log.

  • Room lighting inspection/Emergency Lighting inspection visual/flick test completed?

  • Electrical Fixed Wiring Inspections- Due and Inspection Complete? Jan/Apr/Jul/Oct

  • FAT inspection completed if applicable to this area?

  • PAT inspection completed if applicable to this area and month? Jan/Apr/Jul/Oct

  • RCD inspection completed-if due and applicable to this area? Jan/Apr/Jul/Oct

  • Hair drier replacement carried out this month if applicable to this area? June-Hair driers with cable leads replaced

  • Hair driers serviced if applicable to this area?

Area 10 Roof Plant-Pictures taken of ALL remedials, add these remedials to site 'Heldpdesk' or Forward Planning logs if no remedials but life cycle renewal project needed.

  • Building fabric: Doors/Fire doors, Ceiling finishes openable windows, Glass/windows seals/fixings,internal wall finishes, floor finishes all Inspections associated to this area as per PFP spec.

  • Full Locker inspection completed

  • Full Cubical inspection completed

  • Sanitary Fittings-showers/buttons, toilet seats, Pans, pan flushing mechanism, sinks, taps, urinals, urinal flushing mechanism, all safe secure free from damage and in working order.

  • Vents/Grills/AC Filters cleaned If applicable to this area.

Monthly Electrical Checks-Emergency lighting and general lighting Monthly, FAT monthly, Fixed Wiring (switches,Sockets,Fixings) RCD’s and PAT items as per PFP guidance Quarterly. All new PAT items to be added to the online List of items. All remedials take picture evidence Make safe/repair where needed with items added to the site ‘Helpdesk’ log.

  • Room lighting inspection/Emergency Lighting inspection visual/flick test completed?

  • FAT inspection completed if applicable to this area?

  • Electrical Fixed Wiring Inspections- Due and Inspection Complete? Jan/Apr/Jul/Oct

  • PAT inspection completed if applicable to this area and month? Jan/Apr/Jul/Oct

  • RCD inspection completed-if due and applicable to this area? Jan/Apr/Jul/Oct

  • Hair drier replacement carried out this month if applicable to this area? June-Hair driers with cable leads replaced

  • Hair driers serviced if applicable to this area?

Area 11 Studio 2-Pictures taken of ALL remedials, add these remedials to site 'Heldpdesk' or Forward Planning logs if no remedials but life cycle renewal project needed.

  • Building fabric: Doors/Fire doors, Ceiling finishes openable windows, Glass/windows seals/fixings,internal wall finishes, floor finishes all Inspections associated to this area as per PFP spec.

  • Full Locker inspection completed

  • Full Cubical inspection completed

  • Sanitary Fittings-showers/buttons, toilet seats, Pans, pan flushing mechanism, sinks, taps, urinals, urinal flushing mechanism, all safe secure free from damage and in working order.

  • Vents/Grills/AC Filters cleaned If applicable to this area.

Monthly Electrical Checks-Emergency lighting and general lighting Monthly, FAT monthly, Fixed Wiring (switches,Sockets,Fixings) RCD’s and PAT items as per PFP guidance Quarterly. All new PAT items to be added to the online List of items. All remedials take picture evidence Make safe/repair where needed with items added to the site ‘Helpdesk’ log.

  • Room lighting inspection/Emergency Lighting inspection visual/flick test completed?

  • FAT inspection completed if applicable to this area?

  • Electrical Fixed Wiring Inspections- Due and Inspection Complete? Jan/Apr/Jul/Oct

  • PAT inspection completed if applicable to this area and month? Jan/Apr/Jul/Oct

  • RCD inspection completed-if due and applicable to this area? Jan/Apr/Jul/Oct

  • Hair drier replacement carried out this month if applicable to this area? June-Hair driers with cable leads replaced

  • Hair driers serviced if applicable to this area?

Area 12 Gym Corridor-Pictures taken of ALL remedials, add these remedials to site 'Heldpdesk' or Forward Planning logs if no remedials but life cycle renewal project needed.

  • Building fabric: Doors/Fire doors, Ceiling finishes openable windows, Glass/windows seals/fixings,internal wall finishes, floor finishes all Inspections associated to this area as per PFP spec.

  • Full Locker inspection completed

  • Full Cubical inspection completed

  • Sanitary Fittings-showers/buttons, toilet seats, Pans, pan flushing mechanism, sinks, taps, urinals, urinal flushing mechanism, all safe secure free from damage and in working order.

  • Vents/Grills/AC Filters cleaned If applicable to this area.

  • Note No Asbestos located within this area, however it is presumed as when survey was completed no access was possible due to the drain handle being damaged, tick yes that you are noting this and that no works are completed in this area on the drain. If works are required Asbestos survey will need completing prior to main being worked on/lifted

  • Asbestos Item Number 029 - Ground floor
    - Gym access corridor sub-floor
    duct - Inaccessible - No
    access to internal aspects of
    service duct.

    IMG_8679.JPG
  • Asbestos Item Number 042 - Ground floor
    - Gym access corridor sub-floor
    duct - Inaccessible - No
    access to internal aspects of
    service duct

    IMG_8684.JPG

Monthly Electrical Checks-Emergency lighting and general lighting Monthly, FAT monthly, Fixed Wiring (switches,Sockets,Fixings) RCD’s and PAT items as per PFP guidance Quarterly. All new PAT items to be added to the online List of items. All remedials take picture evidence Make safe/repair where needed with items added to the site ‘Helpdesk’ log.

  • Room lighting inspection/Emergency Lighting inspection visual/flick test completed?

  • Electrical Fixed Wiring Inspections- Due and Inspection Complete? Jan/Apr/Jul/Oct

  • FAT inspection completed if applicable to this area?

  • PAT inspection completed if applicable to this area and month? Jan/Apr/Jul/Oct

  • RCD inspection completed-if due and applicable to this area? Jan/Apr/Jul/Oct

  • Hair drier replacement carried out this month if applicable to this area? June-Hair driers with cable leads replaced

  • Hair driers serviced if applicable to this area?

Area 13 Back offices And Stores-Pictures taken of ALL remedials, add these remedials to site 'Heldpdesk' or Forward Planning logs if no remedials but life cycle renewal project needed.

  • Building fabric: Doors/Fire doors, Ceiling finishes openable windows, Glass/windows seals/fixings,internal wall finishes, floor finishes all Inspections associated to this area as per PFP spec.

  • Full Locker inspection completed

  • Full Cubical inspection completed

  • Sanitary Fittings-showers/buttons, toilet seats, Pans, pan flushing mechanism, sinks, taps, urinals, urinal flushing mechanism, all safe secure free from damage and in working order.

  • Vents/Grills/AC Filters cleaned If applicable to this area.

Monthly Electrical Checks-Emergency lighting and general lighting Monthly, FAT monthly, Fixed Wiring (switches,Sockets,Fixings) RCD’s and PAT items as per PFP guidance Quarterly. All new PAT items to be added to the online List of items. All remedials take picture evidence Make safe/repair where needed with items added to the site ‘Helpdesk’ log.

  • Room lighting inspection/Emergency Lighting inspection visual/flick test completed?

  • Electrical Fixed Wiring Inspections- Due and Inspection Complete? Jan/Apr/Jul/Oct

  • FAT inspection completed if applicable to this area?

  • PAT inspection completed if applicable to this area and month? Jan/Apr/Jul/Oct

  • RCD inspection completed-if due and applicable to this area? Jan/Apr/Jul/Oct

  • Hair drier replacement carried out this month if applicable to this area? June-Hair driers with cable leads replaced

  • Hair driers serviced if applicable to this area?

Area 14 Freeweights Room-Pictures taken of ALL remedials, add these remedials to site 'Heldpdesk' or Forward Planning logs if no remedials but life cycle renewal project needed.

  • Building fabric: Doors/Fire doors, Ceiling finishes openable windows, Glass/windows seals/fixings,internal wall finishes, floor finishes all Inspections associated to this area as per PFP spec.

  • Full Locker inspection completed

  • Full Cubical inspection completed

  • Sanitary Fittings-showers/buttons, toilet seats, Pans, pan flushing mechanism, sinks, taps, urinals, urinal flushing mechanism, all safe secure free from damage and in working order.

  • Vents/Grills/AC Filters cleaned If applicable to this area.

Monthly Electrical Checks-Emergency lighting and general lighting Monthly, FAT monthly, Fixed Wiring (switches,Sockets,Fixings) RCD’s and PAT items as per PFP guidance Quarterly. All new PAT items to be added to the online List of items. All remedials take picture evidence Make safe/repair where needed with items added to the site ‘Helpdesk’ log.

  • Room lighting inspection/Emergency Lighting inspection visual/flick test completed?

  • Electrical Fixed Wiring Inspections- Due and Inspection Complete? Jan/Apr/Jul/Oct

  • FAT inspection completed if applicable to this area?

  • PAT inspection completed if applicable to this area and month? Jan/Apr/Jul/Oct

  • RCD inspection completed-if due and applicable to this area? Jan/Apr/Jul/Oct

  • Hair drier replacement carried out this month if applicable to this area? June-Hair driers with cable leads replaced

  • Hair driers serviced if applicable to this area?

Area 15 Gym Lower and Upper-Pictures taken of ALL remedials, add these remedials to site 'Heldpdesk' or Forward Planning logs if no remedials but life cycle renewal project needed.

  • Building fabric: Doors/Fire doors, Ceiling finishes openable windows, Glass/windows seals/fixings,internal wall finishes, floor finishes all Inspections associated to this area as per PFP spec.

  • Full Locker inspection completed

  • Full Cubical inspection completed

  • Sanitary Fittings-showers/buttons, toilet seats, Pans, pan flushing mechanism, sinks, taps, urinals, urinal flushing mechanism, all safe secure free from damage and in working order.

  • Vents/Grills/AC Filters cleaned If applicable to this area.

Monthly Electrical Checks-Emergency lighting and general lighting Monthly, FAT monthly, Fixed Wiring (switches,Sockets,Fixings) RCD’s and PAT items as per PFP guidance Quarterly. All new PAT items to be added to the online List of items. All remedials take picture evidence Make safe/repair where needed with items added to the site ‘Helpdesk’ log.

  • Room lighting inspection/Emergency Lighting inspection visual/flick test completed?

  • Electrical Fixed Wiring Inspections- Due and Inspection Complete? Jan/Apr/Jul/Oct

  • FAT inspection completed if applicable to this area?

  • PAT inspection completed if applicable to this area and month? Jan/Apr/Jul/Oct

  • RCD inspection completed-if due and applicable to this area? Jan/Apr/Jul/Oct

  • Hair drier replacement carried out this month if applicable to this area? June-Hair driers with cable leads replaced

  • Hair driers serviced if applicable to this area?

Area 16 Wet Change/Corridor from base of stairs to include Intake room and corridor up the stairs leading to Reception-Pictures taken of ALL remedials, add these remedials to site 'Heldpdesk' or Forward Planning logs if no remedials but life cycle renewal project needed.

  • Building fabric: Doors/Fire doors, Ceiling finishes openable windows, Glass/windows seals/fixings,internal wall finishes, floor finishes all Inspections associated to this area as per PFP spec.

  • Full Locker inspection completed

  • Full Cubical inspection completed

  • Sanitary Fittings-showers/buttons, toilet seats, Pans, pan flushing mechanism, sinks, taps, urinals, urinal flushing mechanism, all safe secure free from damage and in working order.

  • Vents/Grills/AC Filters cleaned If applicable to this area.

Monthly Electrical Checks-Emergency lighting and general lighting Monthly, FAT monthly, Fixed Wiring (switches,Sockets,Fixings) RCD’s and PAT items as per PFP guidance Quarterly. All new PAT items to be added to the online List of items. All remedials take picture evidence Make safe/repair where needed with items added to the site ‘Helpdesk’ log.

  • Room lighting inspection/Emergency Lighting inspection visual/flick test completed?

  • Electrical Fixed Wiring Inspections- Due and Inspection Complete? Jan/Apr/Jul/Oct

  • FAT inspection completed if applicable to this area?

  • PAT inspection completed if applicable to this area and month? Jan/Apr/Jul/Oct

  • RCD inspection completed-if due and applicable to this area? Jan/Apr/Jul/Oct

  • Hair drier replacement carried out this month if applicable to this area? June-Hair driers with cable leads replaced

  • Hair driers serviced if applicable to this area?

Area 17 Pool Side-Pictures taken of ALL remedials, add these remedials to site 'Heldpdesk' or Forward Planning logs if no remedials but life cycle renewal project needed.

  • Building fabric: Doors/Fire doors, Ceiling finishes openable windows, Glass/windows seals/fixings,internal wall finishes, floor finishes all Inspections associated to this area as per PFP spec. This is to include sauna bench/heater protection frame security and condition and steam room tiling.

  • Full Locker inspection completed

  • Full Cubical inspection completed

  • Sanitary Fittings-showers/buttons, toilet seats, Pans, pan flushing mechanism, sinks, taps, urinals, urinal flushing mechanism, all safe secure free from damage and in working order.

  • Sauna/Steam along with fabric finishes either on night shift or via one morning prior to turning on have you completed full internal inspection on both inclusive of, Sauna heaters no rubbish visible, temp stats on both secure with no visible damage, steam outlet secure and in correct position, signage in place, steam generator drum internally inspected and descaled as per manufacturers guidance

  • Vents/Grills/AC Filters cleaned If applicable to this area.

Monthly Electrical Checks-Emergency lighting and general lighting Monthly, FAT monthly, Fixed Wiring (switches,Sockets,Fixings) RCD’s and PAT items as per PFP guidance Quarterly. All new PAT items to be added to the online List of items. All remedials take picture evidence Make safe/repair where needed with items added to the site ‘Helpdesk’ log.

  • Room lighting inspection/Emergency Lighting inspection visual/flick test completed?

  • Electrical Fixed Wiring Inspections- Due and Inspection Complete? Jan/Apr/Jul/Oct

  • FAT inspection completed if applicable to this area?

  • PAT inspection completed if applicable to this area and month? Jan/Apr/Jul/Oct

  • RCD inspection completed-if due and applicable to this area? Jan/Apr/Jul/Oct

  • Hair drier replacement carried out this month if applicable to this area? June-Hair driers with cable leads replaced

  • Hair driers serviced if applicable to this area?

Area 18 Pool Side Toilets-Pictures taken of ALL remedials, add these remedials to site 'Heldpdesk' or Forward Planning logs if no remedials but life cycle renewal project needed.

  • Building fabric: Doors/Fire doors, Ceiling finishes openable windows, Glass/windows seals/fixings,internal wall finishes, floor finishes all Inspections associated to this area as per PFP spec.

  • Full Locker inspection completed

  • Full Cubical inspection completed

  • Sanitary Fittings-showers/buttons, toilet seats, Pans, pan flushing mechanism, sinks, taps, urinals, urinal flushing mechanism, all safe secure free from damage and in working order.

  • Vents/Grills/AC Filters cleaned If applicable to this area.

  • Note No Asbestos located within this area, however it is presumed as when survey was completed no access was possible due to the installation of the cubicals, tick yes that you are noting this and that no works are completed in this area on the drains. If works are required Asbestos survey will need completing prior to main being worked on/lifted

  • Asbestos Item Number 021 - Ground floor


    - Male pool side toilet sub-floor duct - Inaccessible - No
    access to internal aspects of

    service duct.

    IMG_8677 (002).JPG
  • Asbestos Item Number 022 - Ground floor - Female pool side toilet sub-floor duct - Inaccessible - No access to internal aspects of service duct

    IMG_8677 (002).JPG

Monthly Electrical Checks-Emergency lighting and general lighting Monthly, FAT monthly, Fixed Wiring (switches,Sockets,Fixings) RCD’s and PAT items as per PFP guidance Quarterly. All new PAT items to be added to the online List of items. All remedials take picture evidence Make safe/repair where needed with items added to the site ‘Helpdesk’ log.

  • Room lighting inspection/Emergency Lighting inspection visual/flick test completed?

  • Electrical Fixed Wiring Inspections- Due and Inspection Complete? Jan/Apr/Jul/Oct

  • FAT inspection completed if applicable to this area?

  • PAT inspection completed if applicable to this area and month? Jan/Apr/Jul/Oct

  • RCD inspection completed-if due and applicable to this area? Jan/Apr/Jul/Oct

  • Hair drier replacement carried out this month if applicable to this area? June-Hair driers with cable leads replaced

  • Hair driers serviced if applicable to this area?

Area 19 Male Change Corridor from base of both sets of stairs across the landings and down, include the mixer cupboard-Pictures taken of ALL remedials, add these remedials to site 'Heldpdesk' or Forward Planning logs if no remedials but life cycle renewal project needed.

  • Building fabric: Doors/Fire doors, Ceiling finishes openable windows, Glass/windows seals/fixings,internal wall finishes, floor finishes all Inspections associated to this area as per PFP spec.

  • Full Locker inspection completed

  • Full Cubical inspection completed

  • Sanitary Fittings-showers/buttons, toilet seats, Pans, pan flushing mechanism, sinks, taps, urinals, urinal flushing mechanism, all safe secure free from damage and in working order.

  • Vents/Grills/AC Filters cleaned If applicable to this area.

Monthly Electrical Checks-Emergency lighting and general lighting Monthly, FAT monthly, Fixed Wiring (switches,Sockets,Fixings) RCD’s and PAT items as per PFP guidance Quarterly. All new PAT items to be added to the online List of items. All remedials take picture evidence Make safe/repair where needed with items added to the site ‘Helpdesk’ log.

  • Room lighting inspection/Emergency Lighting inspection visual/flick test completed?

  • Electrical Fixed Wiring Inspections- Due and Inspection Complete? Jan/Apr/Jul/Oct

  • FAT inspection completed if applicable to this area?

  • PAT inspection completed if applicable to this area and month? Jan/Apr/Jul/Oct

  • RCD inspection completed-if due and applicable to this area? Jan/Apr/Jul/Oct

  • Hair drier replacement carried out this month if applicable to this area? June-Hair driers with cable leads replaced

  • Hair driers serviced if applicable to this area?

Area 20 Male Change 1 Including Intake Cupboard-Pictures taken of ALL remedials, add these remedials to site 'Heldpdesk' or Forward Planning logs if no remedials but life cycle renewal project needed.

  • Building fabric: Doors/Fire doors, Ceiling finishes openable windows, Glass/windows seals/fixings,internal wall finishes, floor finishes all Inspections associated to this area as per PFP spec.

  • Full Locker inspection completed

  • Full Cubical inspection completed

  • Sanitary Fittings-showers/buttons, toilet seats, Pans, pan flushing mechanism, sinks, taps, urinals, urinal flushing mechanism, all safe secure free from damage and in working order.

  • Vents/Grills/AC Filters cleaned If applicable to this area.

Monthly Electrical Checks-Emergency lighting and general lighting Monthly, FAT monthly, Fixed Wiring (switches,Sockets,Fixings) RCD’s and PAT items as per PFP guidance Quarterly. All new PAT items to be added to the online List of items. All remedials take picture evidence Make safe/repair where needed with items added to the site ‘Helpdesk’ log.

  • Room lighting inspection/Emergency Lighting inspection visual/flick test completed?

  • Electrical Fixed Wiring Inspections- Due and Inspection Complete? Jan/Apr/Jul/Oct

  • FAT inspection completed if applicable to this area?

  • PAT inspection completed if applicable to this area and month? Jan/Apr/Jul/Oct

  • RCD inspection completed-if due and applicable to this area? Jan/Apr/Jul/Oct

  • Hair drier replacement carried out this month if applicable to this area? June-Hair driers with cable leads replaced

  • Hair driers serviced if applicable to this area?

Area 21 Male Change 2-Pictures taken of ALL remedials, add these remedials to site 'Heldpdesk' or Forward Planning logs if no remedials but life cycle renewal project needed.

  • Building fabric: Doors/Fire doors, Ceiling finishes openable windows, Glass/windows seals/fixings,internal wall finishes, floor finishes all Inspections associated to this area as per PFP spec.

  • Full Locker inspection completed

  • Full Cubical inspection completed

  • Sanitary Fittings-showers/buttons, toilet seats, Pans, pan flushing mechanism, sinks, taps, urinals, urinal flushing mechanism, all safe secure free from damage and in working order.

  • Vents/Grills/AC Filters cleaned If applicable to this area.

Monthly Electrical Checks-Emergency lighting and general lighting Monthly, FAT monthly, Fixed Wiring (switches,Sockets,Fixings) RCD’s and PAT items as per PFP guidance Quarterly. All new PAT items to be added to the online List of items. All remedials take picture evidence Make safe/repair where needed with items added to the site ‘Helpdesk’ log.

  • Room lighting inspection/Emergency Lighting inspection visual/flick test completed?

  • Electrical Fixed Wiring Inspections- Due and Inspection Complete? Jan/Apr/Jul/Oct

  • FAT inspection completed if applicable to this area?

  • PAT inspection completed if applicable to this area and month? Jan/Apr/Jul/Oct

  • RCD inspection completed-if due and applicable to this area? Jan/Apr/Jul/Oct

  • Hair drier replacement carried out this month if applicable to this area? June-Hair driers with cable leads replaced

  • Hair driers serviced if applicable to this area?

Area 22 Studio 3 Toilets and landing-Pictures taken of ALL remedials, add these remedials to site 'Heldpdesk' or Forward Planning logs if no remedials but life cycle renewal project needed.

  • Building fabric: Doors/Fire doors, Ceiling finishes openable windows, Glass/windows seals/fixings,internal wall finishes, floor finishes all Inspections associated to this area as per PFP spec.

  • Full Locker inspection completed

  • Full Cubical inspection completed

  • Sanitary Fittings-showers/buttons, toilet seats, Pans, pan flushing mechanism, sinks, taps, urinals, urinal flushing mechanism, all safe secure free from damage and in working order.

  • Vents/Grills/AC Filters cleaned If applicable to this area.

Monthly Electrical Checks-Emergency lighting and general lighting Monthly, FAT monthly, Fixed Wiring (switches,Sockets,Fixings) RCD’s and PAT items as per PFP guidance Quarterly. All new PAT items to be added to the online List of items. All remedials take picture evidence Make safe/repair where needed with items added to the site ‘Helpdesk’ log.

  • Room lighting inspection/Emergency Lighting inspection visual/flick test completed?

  • Electrical Fixed Wiring Inspections- Due and Inspection Complete? Jan/Apr/Jul/Oct

  • FAT inspection completed if applicable to this area?

  • PAT inspection completed if applicable to this area and month? Jan/Apr/Jul/Oct

  • RCD inspection completed-if due and applicable to this area? Jan/Apr/Jul/Oct

  • Hair drier replacement carried out this month if applicable to this area? June-Hair driers with cable leads replaced

  • Hair driers serviced if applicable to this area?

Area 23 Spin Studio and Roof Plant-Pictures taken of ALL remedials, add these remedials to site 'Heldpdesk' or Forward Planning logs if no remedials but life cycle renewal project needed.

  • Building fabric: Doors/Fire doors, Ceiling finishes openable windows, Glass/windows seals/fixings,internal wall finishes, floor finishes all Inspections associated to this area as per PFP spec.

  • Full Locker inspection completed

  • Full Cubical inspection completed

  • Sanitary Fittings-showers/buttons, toilet seats, Pans, pan flushing mechanism, sinks, taps, urinals, urinal flushing mechanism, all safe secure free from damage and in working order.

  • Vents/Grills/AC Filters cleaned If applicable to this area.

Monthly Electrical Checks-Emergency lighting and general lighting Monthly, FAT monthly, Fixed Wiring (switches,Sockets,Fixings) RCD’s and PAT items as per PFP guidance Quarterly. All new PAT items to be added to the online List of items. All remedials take picture evidence Make safe/repair where needed with items added to the site ‘Helpdesk’ log.

  • Room lighting inspection/Emergency Lighting inspection visual/flick test completed?

  • Electrical Fixed Wiring Inspections- Due and Inspection Complete? Jan/Apr/Jul/Oct

  • FAT inspection completed if applicable to this area?

  • PAT inspection completed if applicable to this area and month? Jan/Apr/Jul/Oct

  • RCD inspection completed-if due and applicable to this area? Jan/Apr/Jul/Oct

  • Hair drier replacement carried out this month if applicable to this area? June-Hair driers with cable leads replaced

  • Hair driers serviced if applicable to this area?

Area 24 Ops/GM offices and corridor and intake room -Pictures taken of ALL remedials, add these remedials to site 'Heldpdesk' or Forward Planning logs if no remedials but life cycle renewal project needed.

  • Building fabric: Doors/Fire doors, Ceiling finishes openable windows, Glass/windows seals/fixings,internal wall finishes, floor finishes all Inspections associated to this area as per PFP spec.

  • Full Locker inspection completed

  • Full Cubical inspection completed

  • Sanitary Fittings-showers/buttons, toilet seats, Pans, pan flushing mechanism, sinks, taps, urinals, urinal flushing mechanism, all safe secure free from damage and in working order.

  • Vents/Grills/AC Filters cleaned If applicable to this area.

Monthly Electrical Checks-Emergency lighting and general lighting Monthly, FAT monthly, Fixed Wiring (switches,Sockets,Fixings) RCD’s and PAT items as per PFP guidance Quarterly. All new PAT items to be added to the online List of items. All remedials take picture evidence Make safe/repair where needed with items added to the site ‘Helpdesk’ log.

  • Room lighting inspection/Emergency Lighting inspection visual/flick test completed?

  • Electrical Fixed Wiring Inspections- Due and Inspection Complete? Jan/Apr/Jul/Oct

  • FAT inspection completed if applicable to this area?

  • PAT inspection completed if applicable to this area and month? Jan/Apr/Jul/Oct

  • RCD inspection completed-if due and applicable to this area? Jan/Apr/Jul/Oct

  • Hair drier replacement carried out this month if applicable to this area? June-Hair driers with cable leads replaced

  • Hair driers serviced if applicable to this area?

Area 25 Disabled Toilet/Family Change by Reception -Pictures taken of ALL remedials, add these remedials to site 'Heldpdesk' or Forward Planning logs if no remedials but life cycle renewal project needed.

  • Building fabric: Doors/Fire doors, Ceiling finishes openable windows, Glass/windows seals/fixings,internal wall finishes, floor finishes all Inspections associated to this area as per PFP spec.

  • Full Locker inspection completed

  • Full Cubical inspection completed

  • Sanitary Fittings-showers/buttons, toilet seats, Pans, pan flushing mechanism, sinks, taps, urinals, urinal flushing mechanism, all safe secure free from damage and in working order.

  • Vents/Grills/AC Filters cleaned If applicable to this area.

Monthly Electrical Checks-Emergency lighting and general lighting Monthly, FAT monthly, Fixed Wiring (switches,Sockets,Fixings) RCD’s and PAT items as per PFP guidance Quarterly. All new PAT items to be added to the online List of items. All remedials take picture evidence Make safe/repair where needed with items added to the site ‘Helpdesk’ log.

  • Room lighting inspection/Emergency Lighting inspection visual/flick test completed?

  • Electrical Fixed Wiring Inspections- Due and Inspection Complete? Jan/Apr/Jul/Oct

  • FAT inspection completed if applicable to this area?

  • PAT inspection completed if applicable to this area and month? Jan/Apr/Jul/Oct

  • RCD inspection completed-if due and applicable to this area? Jan/Apr/Jul/Oct

  • Hair drier replacement carried out this month if applicable to this area? June-Hair driers with cable leads replaced

  • Hair driers serviced if applicable to this area?

Area 26-External Areas Not Covered on other Checks-Pictures taken of ALL remedials, add these remedials to site 'Heldpdesk' or Forward Planning logs if no remedials but life cycle renewal project needed.

  • Boundary Line-As per PFP Spec

  • Car Parks and Drives-As per PFP Spec

  • Elevations-As per PFP Spec

  • Landscaping, External contractor completed as per contract spec, any additional works needed or query's direct to CMA

  • Downpipes/Rain water goods-As per PFP Spec

  • Roofs-As per PFP Spec Mansafe used where applicable, Winter Months weekly visual

Area 25-Internal/External Drainage

  • Has external contractor completed full internal/external drainage clean- April/Nov

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.