Accountability

  • 1a. When was the last time you were coached from a member of management on safety?

  • 1b. Can you describe the situation and did you consider it to be an effective coaching moment?

Safety Commitment

  • 2a. On a scale of 1-10, with 10 being the best, how committed are you to safety?

  • Select from range

  • 2b. On a scale of 1-10, with 10 being the best, how committed is your leadership to safety?

  • Select from range

Human Performance

  • 3a. On a scale of 1-10, with 10 being the best, how effective do you consider Human Performance to be?

  • Select from range

  • 3b. On a scale of 1-10, with 10 being very often, 5 being sometimes, and 1 being never, how often do you use Human Performance?

  • Select from range

Conservative Decision Making

  • 4a. Prior to making a decision, do you think Likelihood or Consequences?

  • 4b. What factors do you consider when making a decision?

Close Calls / Good Catch Reporting

  • 5a. When is the last time you reported a Close Call / Good Catch? What was the CC/GC pertaining to?

Vehicle Inspections

  • 1. Are weekly vehicle inspections ( for GVW >10K ) properly documented and present in the vehicle?

  • 17B.2

Job Safety Assessment

  • 2. Is the Tailboard/Hazard Assessment complete?<br> <br>

  • 7D, 7E, 7F Substation has over 300 pre-filled JSAs for each task performed, they can add their own comments to them as well as filling out a project-specific JSA. Crew must have front page of blank JSA filled out, including emergency information.

  • 3. Have the job hazards been identified, prioritized, and documented?

  • 4. Has an effective control/mitigation plan for identified hazards been developed?

  • 5. Have the following key observation points been identified, if applicable?

  • 7D, 7E, 7F Slips/Trips/Falls, ergonomic issues, Fatal rules, PPE

  • 6. Has the emergency plan been documented and understood?

  • 7D, 7E, 7F hospital location, route of egress, GPS coordinates, telephone number

  • 7. Were required Human Performance tools discussed/identified/used?

  • Section 42 Discuss with the employee which Human Performance tools (if any) they used during their tasks.

Equipment and Work Place Setup

  • 8. Is all equipment set up for safe use/being stored properly ( outriggers set up properly as applicable, no stored energy)?

  • 7G.1 (also 10K.7, 10B.1, ) Equipment where sudden release of stored energy (pneumatic/hydraulic pressure) may result in an injury SHALL have energy locked in prior to beginning work.

  • 9. Is the work site properly marked and/or barricaded?

  • 24A.1.a (and 24A.1.b) A tag SHALL be attached if barricaded area left unattended. i.e. overnight; Make note if the employee was not the employee responsible.

  • 10. Are ladders being used properly and tied off as necessary?

  • 15A.14

  • 11. Are ladders in good condition and tagged/labeled properly?

  • 10M.4, 15A.8, 15A.9

  • 12. Are gate and perimeter grounds in good condition and hazardous/warning signs placed near entrance?

  • 10A.4; 10A.5

  • 13. If work is being performed inside the substation or switchyard, is the gate closed or barricaded?

  • 10A.7

  • 14. Is the housekeeping outside and within control room good?

  • 15. Are fire extinguishers on site, within date, in good working order and easily accessible?

  • On trucks, staged near hot work, etc.

  • 16. Are seat belts being used on applicable equipment while in operation?

  • 17. Has the crew performed and documented an inspection of the forklift/man/lift/sky track prior to work to assure equipment is in safe operating condition?

  • 17B.5; 17I.2

PPE Requirements

  • 18. Is all company approved and required PPE/IPE in good condition and stored properly?

  • 4A.c.1; 4A.c.2; 4A.c.3; 4A.c.4 5A.2; 6A.1; 6A.8 IPE (Section 28) SHALL be stored to protect it from light, temperature extremes, excessive humidity, ozone, and other harmful substances and conditions; 6A.3; 6A.13

  • 19. Are safety glasses being worn when required?

  • 4A.a.1; 4A.a.2; 4A.a.3; 4A.a.4; 4A.a.5; 4A.a.6

  • 20. Is a face shield being worn when required?

  • 4A.a.1; 4A.a.2; 4A.a.4 ANSI Z.87 +1 glasses must be worn when wearing a face shield, especially when using a grinder; 4A.a.5; 10F.2

  • 21. Is hearing protection being worn when applicable?

  • 4A.b.1; 19A.1

  • 22. Are company-approved work gloves being used when applicable and are they in good condition (leather, cut resistant if skinning wire)?

  • 4A.h.1; 4A.h.3; 4A.h.4; 4A.h.6; 17D.5; Gloves shall be used when handling winches; 17C.1

  • 23. Are rubber gloves and plastic cover supplies in date?

  • 6A.6.a; 6A.6.b; 6A.6.c

  • 24. Is appropriate FR clothing being worn gate to gate and in appropriate situations for specific tasks when required?

  • 4A.j.1; 4A.j.2; 4A.j.4

  • 25. Is proper PPE being used when welding (CAD/ hand / GMAW / arc welding)

  • 20A.5, 20A.7, 20A.9, 20A.10, 20A.11, 20A.12, 20A.13, 20C.1, 20E.1; 20E.1

  • 26. Are high-visibility vests being used appropriately?

  • 27. Are Di/EH boots being used properly and in the correct situations?

  • 5B.1.a EH 18kV rated footwear per ASTM F2413/F2892 SHALL be worn when entering a substation; Dielectric is 5B.2.a; 5B.2.c; 5B.2.d; Table 5E

  • 28. Is fall protection equipment being used properly?

  • 4A.i.1; 4A.i.2; 4A.i.4; 4A.i.5; 4A.i.6; 4A.i.7; 10B.5

  • 29. Is arc flash protection being used as required (correct class utilized)?

  • 5A.1; 5A.5; 10B.10(table)

  • 30. Is the employee using the proper rubber gloves and sleeves for the task?

Tools and other Equipment

  • 31. Are high voltage detectors properly used and operational?

  • 19C (Machine Guarding); 19C.a.1; 19C.a.3; 19D.5

  • 32. Are guards in place on grinders, portable saws, etc.?

  • 33. Are appropriate bands being used to attach air hoses or compressed gas lines (N tanks by transformers)?

  • 19A.3; 19B.1; 19B.2

  • 34. Are appropriate stripping/skinning tools or approved skinning knives being used and in good condition?

  • 19A.2; 19A.3; 19A.6

  • 35. Are the proper tools for the job being utilized, and are tools in good condition with no modifications?

  • 3A.26 Transmission/Substation grounds are tested annually, distribution tested every 2 years. Includes equipment grounds.

  • 36. Are grounds properly dated and tagged?

Chemical Safety, First Aid, Ergonomics

  • 37. Are SDS available online/electronically sourced/onsite and are the chemicals properly labeled and stored properly?

  • 38. Are safety/medical/first aid equipment/goods on site and within date, including gel blankets?

  • 39. Are proper lifting/carrying techniques utilized?

  • 40. Are proper pushing/pulling techniques utilized?

  • 41. Are employees using 3 points of contact when ascending, descending, and climbing?

  • 42. Are employees using good posture and not overextending?

Confined Space - Transformers

  • 43. Are confined space guidelines/standards being followed properly, with proper rescue tools/equipment readily available?

  • Section 21 (Confined/Enclosed Space), 10N.3, 10N.4, 10N.5

  • 44. Have proper shoring/sloping methods been used within excavations over 5 feet in poor soil conditions (type C) and/or if inspection shows potential for cave-in?

  • 23A.1; 23A.2; 23A.5; 23A.6; 23A.7; 23B.1; 23B.2; 23B.9; 23B.10; 23B.14; 23B.16; 23B.21; 23B.22; 23B.24

Worksite Practices

  • 45. Are proper testing and grounding methods being used?

  • 33B Temporary grounds SHALL be installed after a clearance has been issued by the controlling authority and following testing with a voltage detector and finding the circuit to be absent of nominal voltage.

  • 46. Is proper cover up utilized as required?

  • 3A.7; 10B.8

  • 47. Are grounds installed properly, including flags?

  • 48. Are switching orders properly documented?

  • 49. Is grounding plan developed and documented?

  • 10B.1, 2A.9

  • 50. Are clearance orders properly documented and is Clearance holder on site?

  • 2D.3, 2D.10 :Master Clearance holder does not have to be onsite.

  • 51. Is 3-part communication properly used in all switching orders?

  • 2A.6

  • 52. Has the pre-switching checklist been completed?

  • 2A.9

  • 53. Have switching orders been executed in sequence exactly as written, with circle/slash method being used?

  • 2A.9

  • 54. Have clearance orders been executed as written?

  • 2D.4; 2D.5; 2D.6; 10B.1; 10B.4

  • 55. Have Danger Hold Tags been completed and installed as required?

  • 2D.6; 2D.7; 2D.8; 2D.9; 10B.4

  • 56. Are MOS/gang operated switches/hookstick switches operated to fully open or closed position and properly disengaged and/or locked?

  • 2D.7; 10B.4

  • 57. Are breaker or control systems opened/closed/disabled/enabled/checked for correct operation and tagged as required?

  • 2D.6; 2D.7; 2D.8; 10B.4

  • 58. Is employee mindful of line of fire and pinch points?

  • 19A.c.1, 17I.20, 17I.22, 17I.40

Other

  • 59. Do contractors on site have PowerSafe cards present at all times while performing work on Entergy property?

Human Performance Tools

  • 60. Self Checking

  • 61. Peer Checking

  • 62. Pre-Job Briefing

  • 63. Procedure Usage

  • 64. Questioning Attitude

  • 65. Place Keeping

  • 66. Effective Communication

  • 67. Coaching

  • 68. Post-Job Review

  • 69. Turnovers

  • Comments

  • Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.