Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Section 1
-
Site
-
Location
-
Reported by
-
Reported to
-
Select date
-
Description of hazard
-
Risks posed by hazard
-
Legislative Reference
-
Current controls
-
Interim actions
-
Who has been Consulted?
-
Section 2
Risk potential- risk analysis-risk calculator including current controls -
Consequence<br>Severity of injury/illness
-
Exposure<br>(Frequency &Duration)
-
Probability<br>(Likelihood of C+E)
-
Total <br>(Consequence X Exposure X Probability)
-
Section 3
-
Possible Controls
-
Risk control plan (Preferred controls)
- Elimination
- Substitution
- Isolation
- Engineering
- Administrative
- PPE
-
By whom
-
By when
-
Completed date
-
Completed (Sign off)
-
Any legislative requirements ?
-
Safety alert required
-
Residual risk priority <br>(Consequence X Exposure X Probability)
-
Section 4
-
Originator notified of action taken (Completed-sign off)
-
Date of sign off
-
Controls monitored for their completion,effectiveness and do not introduce any further risk (Completed-sign off)
-
Date of sign off
-
Record filed and database updated (Completed-sign off)
-
Date of sign off