Title Page

  • Conducted on

  • Prepared by

  • Location

INSPECTOR

  • Add signature

OCR's AND OIL SWITCHES

  • APPEARANCE OK

  • BUSHINGS CLEAN, GOOD CONDITION

  • FREE FROM OIL LEAKS

  • COUNTER READINGS RECORDED

AIR-BREAK AND DISCONNECT SWITCHES

  • APPEARANCE OK

  • INSULATORS OK

  • GROUND CONNECTION TO HANDLE OK

BYPASS SWITCHES

  • APPEARANCE OK

  • INSULATORS OK

MISCELLANEOUS ELECTRICAL EQUIPMENT

  • ARRESTER APPEARANCE OK

  • ARRESTER CORRECTLY CONNECTED

  • SWITCH STICKS OK, PROPERLY STORED

  • PHASES PROPERLY IDENTIFIED

  • CIRCUITS PROPERLY IDENTIFIED

  • BUSES AND CONNECTIONS OK

  • BURNED OUT LAMPS REPLACED

  • OVERHEAD GROUND WIRE OK

  • CABINETS AND CUBICLES OK

SAFETY

  • EQUIPMENT GROUNDS OK

  • FENCES AND GATES GROUNDED

  • EXITS, WALKWAYS AND DRIVEWAYS CLEAR

  • SUB ENCLOSURES FREE OF STORED MATERIAL & EQUIPMENT

  • NESC CLEARANCES COMPLIED WITH

  • SUBSTATION AREA PROPERLY LIGHTED

  • YARD CLEAN AND FREE OF WEEDS

  • GATES PROPERLY LOCKED

  • SUITABLE WARNING SIGNS ON FENCES

YARD AND STRUCTURES

  • FENCES AND GATES ADEQUATE

  • YARD PROPERLY SURFACED

  • STRUCTURE PAINT OK

  • FENCE AND GATE PAINT OK

ADDITIONAL COMMENTS

  • ANY ADDITIONAL COMMENTS

OIL CIRCUIT RECLOSERS

To find Demand metering amps. 1. Press METERING button, press down arrow to "Demand Metering", arrow down to "Reset Demand Phase Amps", press ENTER, record max demand an d peak amps below. To Reset Demand and Peak Amps 1. Press METERING button, press down arrow to "Demand Metering", arrow down to "Reset Demand Peaks", press F4. "METER ARE RESET" should appear for 2 seconds.

ROUTE No. 1

  • A- COUNTER READINGS

  • B- COUNTER READINGS

  • C- COUNTER READINGS

  • GRD

  • A-MAX AMPS DEMAND/PEAK

  • B-MAX AMPS DEMAND/PEAK

  • C-MAX AMPS DEMAND/PEAK

ROUT No. 2

  • A- COUNTER READINGS

  • B-COUNTER READINGS

  • C-COUNTER READINGS

  • GRD

  • A-MAX AMPS DEMAND/PEAK

  • B-MAX AMPS DEMAND/PEAK

  • C-MAX AMPS DEMAND/PEAK

ROUT No. 4

  • A- COUNTER READINGS

  • B- COUNTER READINGS

  • C- COUNTER READINGS

  • GRD

  • A-MAX AMPS DEMAND/PEAK

  • B-MAX AMPS DEMAND/PEAK

  • C-MAX AMPS DEMAND/PEAK

FORM 6 BATTERY TEST

RT #1 FORM 6

  • DID BATTERY TEST OK

RT #2 FORM 6

  • DID BATTERY TEST OK

RT #4 FORM 6

  • DID BATTERY TEST OK

During a manual test if the voltage drops below 22.8 volts DC for one full second, the ALARM LED (battery alarm) will ILLUMINATE.

1. Press the MENU button on the front panel. 2. Using the down arrow key, navigate to the BATTERY menu and press ENTER. 3. Using the down arrow key, navigate to the TEST BATTERY menu and press ENTER. 4. Press the f4 button to test the battery. LCD should display: ---Testing---

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.