Title Page
-
Project Name
-
Location
-
Prepared by:
Heating Inspection
-
Customer Name
-
Property Address
-
Inspected by
-
DealID No
-
Date of Commissioning
-
Date of Inspection
Heat Pump
-
No of Units
-
Model Number (Unit 1)
-
Serial Number (Unit 1)
-
Model Number (Unit 2)
-
Serial Number (Unit 2)
-
Model Number (Unit 3)
-
Serial No (Unit 3)
-
Location of HP(s)
-
Has the unit(s) been mounted on base and level?
-
Is there adequate free area around unit?
-
Has a condense drain been fitted and run to a proper drain point?
External Pipework
-
Has Pipework been run neatly?
-
Have flexible connections been used?
-
Have isolation valves been fitted to each HP inlet and outlet?
-
Have drain valves been fitted at lowest point?
-
Has the system been charged with Water/Inhibitor or Thermal Transfer Fluid/Glycol
-
Have anti freeze valves been installed to manufacturers instructions?
-
Has external grade insulation been used?
-
Have all insulation joints been properly closed and sealed?
-
Have all wall penetrations (redundant boiler or HP installation) been properly closed up?
External Electrical Work
-
Have the cables been run neatly and securely clipped?
-
Have the appropriate cables been used to carry current and afford appropriate mechanical protection?
-
Have Weatherproof Local Isolators fitted within 2m of each HP?
-
Have cables been properly terminated and identified?
Internal Primary Circuit
-
Has pipework been neatly installed?
-
Have all pipework insulated to prevent unnecessary heat loss?
-
Have all high points been fitted with automatic air vents?
-
Can Buffer Vessel be isolated and drained down?
-
Are the components (buffer, filters, pumps, cylinder and flow sensor) maintainable?
-
Expansion vessel fitted and piped appropriately?
-
Has the 3 Port Valve been correctly connected?
-
Has flow sensor been installed to manufacturers recommendations?
-
Type of Hot Water Generation/Storage
-
Hot Water Model No
-
Hot Water Serial No
-
Has the Hot Water Cylinder/Heat Battery been correctly connected?
-
Does G3 pipework conform to Building Regulations?
Internal Electrical Work
-
Have cables been run neatly and properly clipped?
-
Has all equipment been correctly connected?
-
Have the appropriate cables been used to carry current and afford appropriate mechanical protection?
-
Has containment systems been properly sized and has sufficient spare capacity?
-
Have terminations in Control Panel been identified?
Secondary Heating Circuit
-
Has the system been piped for the correct zoning?
-
Has pipework been installed neatly?
-
Have upgraded radiators been fitted?
-
Is there evidence the heating system has been balanced?
Electrical Point Of Connection
-
Has a separate Garage CU been installed solely for the use of the ASHP?
- Existing House CU
- Garage CU
-
Location of the Garage CU
-
Has the the Garage CU been properly identified
-
Location of the existing House CU
-
Have the additional new circuits added to the existing House CU been properly identified
Control & Programming
-
How many heating zones are installed?
-
Is this appropriate to the size of the property and compliant to AD Part J
-
Type of zone temperature control?
- Wireless
- Wired
- LCD Controllers
-
Location of temperature controllers?
-
Is there evidence the HP controller has been correctly set up.
-
Confirm WiFi controller is fitted and commissioned
Outstanding or recommended work
-
Outstanding or recommended work
-
Details of outstanding contractural work
-
Describe any Recommendations of installation.
Customer Feedback
-
Any customer feedback about installation and/or installers?