Title Page

  • Project Name

  • Location
  • Prepared by:

Heating Inspection

  • Customer Name

  • Property Address

  • Inspected by

  • DealID No

  • Date of Commissioning

  • Date of Inspection

Heat Pump

  • No of Units

  • Model Number (Unit 1)

  • Serial Number (Unit 1)

  • Model Number (Unit 2)

  • Serial Number (Unit 2)

  • Model Number (Unit 3)

  • Serial No (Unit 3)

  • Location of HP(s)

  • Has the unit(s) been mounted on base and level?

  • Is there adequate free area around unit?

  • Has a condense drain been fitted and run to a proper drain point?

External Pipework

  • Has Pipework been run neatly?

  • Have flexible connections been used?

  • Have isolation valves been fitted to each HP inlet and outlet?

  • Have drain valves been fitted at lowest point?

  • Has the system been charged with Water/Inhibitor or Thermal Transfer Fluid/Glycol

  • Have anti freeze valves been installed to manufacturers instructions?

  • Has external grade insulation been used?

  • Have all insulation joints been properly closed and sealed?

  • Have all wall penetrations (redundant boiler or HP installation) been properly closed up?

External Electrical Work

  • Have the cables been run neatly and securely clipped?

  • Have the appropriate cables been used to carry current and afford appropriate mechanical protection?

  • Have Weatherproof Local Isolators fitted within 2m of each HP?

  • Have cables been properly terminated and identified?

Internal Primary Circuit

  • Has pipework been neatly installed?

  • Have all pipework insulated to prevent unnecessary heat loss?

  • Have all high points been fitted with automatic air vents?

  • Can Buffer Vessel be isolated and drained down?

  • Are the components (buffer, filters, pumps, cylinder and flow sensor) maintainable?

  • Expansion vessel fitted and piped appropriately?

  • Has the 3 Port Valve been correctly connected?

  • Has flow sensor been installed to manufacturers recommendations?

  • Type of Hot Water Generation/Storage

  • Hot Water Model No

  • Hot Water Serial No

  • Has the Hot Water Cylinder/Heat Battery been correctly connected?

  • Does G3 pipework conform to Building Regulations?

Internal Electrical Work

  • Have cables been run neatly and properly clipped?

  • Has all equipment been correctly connected?

  • Have the appropriate cables been used to carry current and afford appropriate mechanical protection?

  • Has containment systems been properly sized and has sufficient spare capacity?

  • Have terminations in Control Panel been identified?

Secondary Heating Circuit

  • Has the system been piped for the correct zoning?

  • Has pipework been installed neatly?

  • Have upgraded radiators been fitted?

  • Is there evidence the heating system has been balanced?

Electrical Point Of Connection

  • Has a separate Garage CU been installed solely for the use of the ASHP?

  • Location of the Garage CU

  • Has the the Garage CU been properly identified

  • Location of the existing House CU

  • Have the additional new circuits added to the existing House CU been properly identified

Control & Programming

  • How many heating zones are installed?

  • Is this appropriate to the size of the property and compliant to AD Part J

  • Type of zone temperature control?

  • Location of temperature controllers?

  • Is there evidence the HP controller has been correctly set up.

  • Confirm WiFi controller is fitted and commissioned

Outstanding or recommended work

  • Outstanding or recommended work

  • Details of outstanding contractural work

  • Describe any Recommendations of installation.

Customer Feedback

  • Any customer feedback about installation and/or installers?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.