Information
-
Civil Contract audit been carried out on
-
Company Name
- Heneghans
- Hardwick
- Cusack
- Axle
- SAUK
- McLoughlin
- AGM
-
Team Name of Pre-Start site Governance Check-up Form
-
Supervisor Name
- Des Britton
- Des Rogan
- Sean Delaney
- Jonathan Kelly
- Jamie Ayrton
- Diogo Santos
- Richard Whitehead
- Scott Waldron
- John Walsh
- Phil Edgell
- John Whitehead
- Gary Handley
- Bob Morris
- Mick McElhinney
- Ben Moody
- Chris Gunn
- Rob Austin
- Kevin Murphy
-
Date
-
Location
-
Build Area
-
Site Permit Conditions (Length NO more than 50m can be open at any ONE time).
Pre-Start site Governance Check-up Form "No work to start till completed"
-
Does the Open Site length exceed 50m at any one Time (Combining Open trench and Trench waiting for reinstatement Must not exceed 50m)
-
Works Must Stop until Permit Conditions are Met (length of track not to exceed 50m in total).
-
Do the Team Have a Gang Pack & COSHH Pack
-
Please take a photo of Proof.
-
Risk assessment been completed.
-
Please take a photo of Proof.
-
Pre-start sheet been completed
-
Please take a Photo of proof
-
Plant Check Sheet been Completed
-
Please take a photo of Proo
-
NRSWA (Street works Card Onsite)
-
Please take a photo of Proof.
-
First Aid cert on site
-
Please take photo of proof
-
Trencher Operator Cert On site
-
Please take a photo of Proof.
-
Mini Digger Operators Card on site
-
Please take a photo of Proof.
-
Utility Drawings in Date (UTILITY DRAWING VALID PERIOD DAYS - GAS-28 / ELECTRIC-30 / B.T-90 / WATER-90 / VIRGIN-90 ).
-
Please take a photo of Proof.
-
Vehicle parked safely within site or Outside work the Area
-
Please take a photo of Proof.
-
Are all Team members waring Hi- Viz vest / clothing. (city fibre contract long sleeve + Logo vest must be worn)
-
Please take a photo of Proof.
-
Is there a Fully stock spill kit on-sit / in Van
-
please take photo of proof
-
Are Access signs for residents @ each end of works. (City fibre only)
-
Please take photo of proof.
-
Is the relevant Covid-19 info available 0n-site i.e Covid message boards + Covid flyers for residents. (City fibre only)
-
Please take photo of proof.
-
Is Virgin media or City fibre advertising banner displayed.
-
Please take photo of proof.
-
Courtesy boards at both ends with the correct permit number displayed.
-
Please take a photo of Proof.
-
Are Men @ Work & Road narrows signs out (multi way junction) and including sandbags and Cone where required.
-
Please take a photo of Proof.
-
Directional Arrows, two at leading taper and one at exit with sandbags and Cones where required.
-
Please take a photo of Proof.
-
Footway close signage at both ends including sandbags.
-
Please take a photo of Proof.
-
Traffic cones where required i.e beside Signs, safety zone, beside kerb ramps (Are these in suitable Condition for the job in Hand).
-
Please take a photo of Proof.
-
Barriers connected including inside barriers.
-
Please take a photo of Proof.
-
All sand / Stone & spoil stored correctly within side Barriers - Not spilling Under / Over barriers
-
Please take a photo of Proof.
-
Kerb Ramps & Walk Boards (pinned) where required.
-
Please take a photo of Proof.
-
Cat & Genny on Site & and in date all existing known utilities been mark up with spray paint i.e street lights, B.t Poles, House services.
-
Please take a photo of Proof.
-
Cat & Genny - Are batteries charged and fit for use (Test both equipment for power & noise indicators)
-
Have Trial hole's be Excavated at Known service Locations i.e B.T Poles, Street Lights, Electric House Services.
-
Please take a photo of Proof.
-
Is PPE Available on site and been worn whilst using plant and working near Grab / Mini Digger and While using Trencher
-
Please take a photo of Proof.
-
Is the site tidy (housekeeping ) - free to trip hazards
-
Please take a photo of Proof.
-
Traffic management setup correctly or Road Closure signs in Place and visible.
-
Please take a photo of Proof.
-
Make any last changes to the Risk assessment ="safe to work"
-
Please take a photo of Proof.
-
Notes: Please list anything that our works will affect nearby, schools, shops, Hospitals. also please discuss any restrictions placed on the works (permit conditions).
Conclusion
-
Supervisor Signature
-
Ganger Signature
-
Is this site set up asper the RED BOOK and ALL Other requirement are Met asper Pre-Start site Governance Check-up Form