Information

  • Civil Contract audit been carried out on

  • Company Name

  • Team Name of Pre-Start site Governance Check-up Form

  • Supervisor Name

  • Date

  • Location
  • Build Area

  • Site Permit Conditions (Length NO more than 50m can be open at any ONE time).

Pre-Start site Governance Check-up Form "No work to start till completed"

  • Does the Open Site length exceed 50m at any one Time (Combining Open trench and Trench waiting for reinstatement Must not exceed 50m)

  • Works Must Stop until Permit Conditions are Met (length of track not to exceed 50m in total).

  • Do the Team Have a Gang Pack & COSHH Pack

  • Please take a photo of Proof.

  • Risk assessment been completed.

  • Please take a photo of Proof.

  • Pre-start sheet been completed

  • Please take a Photo of proof

  • Plant Check Sheet been Completed

  • Please take a photo of Proo

  • NRSWA (Street works Card Onsite)

  • Please take a photo of Proof.

  • First Aid cert on site

  • Please take photo of proof

  • Trencher Operator Cert On site

  • Please take a photo of Proof.

  • Mini Digger Operators Card on site

  • Please take a photo of Proof.

  • Utility Drawings in Date (UTILITY DRAWING VALID PERIOD DAYS - GAS-28 / ELECTRIC-30 / B.T-90 / WATER-90 / VIRGIN-90 ).

  • Please take a photo of Proof.

  • Vehicle parked safely within site or Outside work the Area

  • Please take a photo of Proof.

  • Are all Team members waring Hi- Viz vest / clothing. (city fibre contract long sleeve + Logo vest must be worn)

  • Please take a photo of Proof.

  • Is there a Fully stock spill kit on-sit / in Van

  • please take photo of proof

  • Are Access signs for residents @ each end of works. (City fibre only)

  • Please take photo of proof.

  • Is the relevant Covid-19 info available 0n-site i.e Covid message boards + Covid flyers for residents. (City fibre only)

  • Please take photo of proof.

  • Is Virgin media or City fibre advertising banner displayed.

  • Please take photo of proof.

  • Courtesy boards at both ends with the correct permit number displayed.

  • Please take a photo of Proof.

  • Are Men @ Work & Road narrows signs out (multi way junction) and including sandbags and Cone where required.

  • Please take a photo of Proof.

  • Directional Arrows, two at leading taper and one at exit with sandbags and Cones where required.

  • Please take a photo of Proof.

  • Footway close signage at both ends including sandbags.

  • Please take a photo of Proof.

  • Traffic cones where required i.e beside Signs, safety zone, beside kerb ramps (Are these in suitable Condition for the job in Hand).

  • Please take a photo of Proof.

  • Barriers connected including inside barriers.

  • Please take a photo of Proof.

  • All sand / Stone & spoil stored correctly within side Barriers - Not spilling Under / Over barriers

  • Please take a photo of Proof.

  • Kerb Ramps & Walk Boards (pinned) where required.

  • Please take a photo of Proof.

  • Cat & Genny on Site & and in date all existing known utilities been mark up with spray paint i.e street lights, B.t Poles, House services.

  • Please take a photo of Proof.

  • Cat & Genny - Are batteries charged and fit for use (Test both equipment for power & noise indicators)

  • Have Trial hole's be Excavated at Known service Locations i.e B.T Poles, Street Lights, Electric House Services.

  • Please take a photo of Proof.

  • Is PPE Available on site and been worn whilst using plant and working near Grab / Mini Digger and While using Trencher

  • Please take a photo of Proof.

  • Is the site tidy (housekeeping ) - free to trip hazards

  • Please take a photo of Proof.

  • Traffic management setup correctly or Road Closure signs in Place and visible.

  • Please take a photo of Proof.

  • Make any last changes to the Risk assessment ="safe to work"

  • Please take a photo of Proof.

  • Notes: Please list anything that our works will affect nearby, schools, shops, Hospitals. also please discuss any restrictions placed on the works (permit conditions).

Conclusion

  • Supervisor Signature

  • Ganger Signature

  • Is this site set up asper the RED BOOK and ALL Other requirement are Met asper Pre-Start site Governance Check-up Form

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.