Information
-
Civil Contract audit been carried out on
-
Company
- Heneghans
- C & J
- Perfecta
- NUS
- ASG
- Northfield
- C&A
-
Build Area
-
Person completing Audit
- Kevin Murphy
- Darren Harrison
- Adam Hamilton
- Anthony Green
- Brendan Townsley
- Paul Hanrahan
- Courtney Easy
- Stephen Hall
- Bartley Keane
- Dave Bagley
- Steve Kemp
- Steven Hewkin
- Jamie Ayrton
- Sean Delaney
- Mick Mcelhinney
- John Walsh
- John Whitehead
- Bob Morris
- Rob Austin
-
NBU / PN Number
-
New Chamber Size or Core drill Quality existing PIA Chamber.
- FW2
- FW3
- FW4
- FW6
- Core drill into existing PIA Chamber
- FW10
- CW1
- CW2
- CW3
-
Please supply surface type where the Chamber as been installed in?
-
Team Name who Built Chamber or Core Drill completed.
-
Chamber Location
-
Street Name
-
Build Area
-
Conducted on
Chamber Inspection
-
Civil Contract audit been carried out on
-
As the Chamber been installed to correct depth.
-
Please take Photo of the Chamber showing the incorrect works more than one can be taken the
-
Record Depth of Chamber
inform the team they have 7 days to correct the Chamber
-
Please take Photo of the Chamber once all the work are corrected more than one can be taken
-
please take a photo showing the Chamber as been installed to correct depth, more than one can be taken.
-
Please record the Depth of Chamber.
-
As a Concrete Floor & Sump / Grate been installed to VM specification, FW2 and above this is required.
-
Please take Photo of the Chamber Floor showing the incorrect works, more than one can be taken.
inform the team they have 7 days to correct the Chamber
-
Please take Photo of the Chamber Floor showing the work are corrected, more than one can be taken
-
please take a photo showing the Chamber Floor more than one can be taken.
-
Are duct entry's 75mm from corner of the Chamber and Duct entry into chamber 250mm cover & 150mm from Floor ( Carriageway duct entry 450mm cover)
-
Please take Photo of the Chamber showing the incorrect works more than one can be taken the
inform the team they have 7 days to correct the Chamber
-
Please take Photo of the Chamber once all the work are corrected more than one can be taken
-
please take a photo showing the Duct entry's are installed to the correct specification, more than one can be taken.
-
Is there 25mm space between the duct entry's
-
Please take Photo of the spacing between the duct's showing the incorrect works more than one can be taken the
inform the team they have 7 days to correct the Chamber
-
Please take Photo of the spacing between the duct's once corrected, once all the work are corrected more than one can be taken
-
please take a photo showing 25mm space between the ducts, more than one can be taken.
-
As all duct's been left Flush (Concrete only) or 10mm & 15mm proud into plastic chamber.
-
Please take Photo of the Duct entry into Chamber showing the incorrect works more than one can be taken the
inform the team they have 7 days to correct the Chamber
-
Please take Photo of the Duct entry showing corrected works, more than one can be taken
-
please take a photo showing the Duct entry's as been built correctly, more than one can be taken.
-
Are all duct entry's sealed with Mastic or (Grout - Concrete only).
-
Please take Photo of the sealed duct entry's showing the incorrect works more than one can be taken the
inform the team they have 7 days to correct the Chamber
-
Please take Photo of the Duct Entry's once all the work are corrected more than one can be taken
-
please take a photo showing all duct entry's are seal with Mastic, more than one can be taken.
-
As the Frame & Cover been set on Cement mortar.
-
Please take Photo of the Frame & Cover showing the incorrect works more than one can be taken.
inform the team they have 7 days to correct the Chamber
-
Please take Photo of the Frame & Cover once all the work are corrected more than one can be taken
-
please take a photo showing the Frame & Cover that all works are correct, more than one can be taken.
-
As all Brackets been installed to the chamber FW4 and Above Only
-
Please take Photo of the Chamber Brackets showing the incorrect works more than one can be taken the
inform the team they have 7 days to correct the Chamber
-
Please take Photo of the Chamber Brackets once all the work are corrected more than one can be taken
-
please take a photo showing the Chamber Brackets have been installed & are correct, more than one can be taken.
-
As a concrete fillet been put around the Frame & Cover - Grass 150mm Fillet Max & Flag's 75mm Fillet Max
-
Please take Photo of the Concrete Fillet showing the incorrect works more than one can be taken the
inform the team they have 7 days to correct the Chamber
-
Please take Photo of the Concrete Fillet once all the work are corrected more than one can be taken
-
please take a photo showing the Concrete Fillet is correct, more than one can be taken.
-
As the Chamber been installed to correct depth.
-
Please take Photo of the Chamber showing the incorrect works more than one can be taken the
-
Record Depth of Chamber
inform the team they have 7 days to correct the Chamber
-
Please take Photo of the Chamber once all the work are corrected more than one can be taken
-
please take a photo showing the Chamber as been installed to correct depth, more than one can be taken.
-
Please record the Depth of Chamber.
-
As a Concrete Floor & Sump / Grate been installed to VM specification, FW2 and above this is required.
-
Please take Photo of the Chamber Floor showing the incorrect works, more than one can be taken.
inform the team they have 7 days to correct the Chamber
-
Please take Photo of the Chamber Floor showing the work are corrected, more than one can be taken
-
please take a photo showing the Chamber Floor more than one can be taken.
-
Are duct entry's 75mm from corner of the Chamber
-
Please take Photo of the Chamber showing the incorrect works more than one can be taken the
inform the team they have 7 days to correct the Chamber
-
Please take Photo of the Chamber once all the work are corrected more than one can be taken
-
please take a photo showing the Duct entry's are installed to the correct specification, more than one can be taken.
-
Is there 25mm space between the duct entry's
-
Please take Photo of the spacing between the duct's showing the incorrect works more than one can be taken the
inform the team they have 7 days to correct the Chamber
-
Please take Photo of the spacing between the duct's once corrected, once all the work are corrected more than one can be taken
-
please take a photo showing 25mm space between the ducts, more than one can be taken.
-
As all duct's been left Flush (Concrete only) or 10mm & 15mm proud into plastic chamber.
-
Please take Photo of the Duct entry into Chamber showing the incorrect works more than one can be taken the
inform the team they have 7 days to correct the Chamber
-
Please take Photo of the Duct entry showing corrected works, more than one can be taken
-
please take a photo showing the Duct entry's as been built correctly, more than one can be taken.
-
Are all duct entry's sealed with Mastic or (Grout - Concrete only).
-
Please take Photo of the sealed duct entry's showing the incorrect works more than one can be taken the
inform the team they have 7 days to correct the Chamber
-
Please take Photo of the Duct Entry's once all the work are corrected more than one can be taken
-
please take a photo showing all duct entry's are seal with Mastic, more than one can be taken.
-
As the Frame & Cover been set on Cement mortar.
-
Please take Photo of the Frame & Cover showing the incorrect works more than one can be taken.
inform the team they have 7 days to correct the Chamber
-
Please take Photo of the Frame & Cover once all the work are corrected more than one can be taken
-
please take a photo showing the Frame & Cover that all works are correct, more than one can be taken.
-
As all Brackets been installed to the chamber FW4 and Above Only
-
Please take Photo of the Chamber Brackets showing the incorrect works more than one can be taken the
inform the team they have 7 days to correct the Chamber
-
Please take Photo of the Chamber Brackets once all the work are corrected more than one can be taken
-
please take a photo showing the Chamber Brackets have been installed & are correct, more than one can be taken.
-
As a concrete fillet been put around the Frame & Cover - Grass 150mm Fillet Max & Flag's 75mm Fillet Max
-
Please take Photo of the Concrete Fillet showing the incorrect works more than one can be taken the
inform the team they have 7 days to correct the Chamber
-
Please take Photo of the Concrete Fillet once all the work are corrected more than one can be taken
-
please take a photo showing the Concrete Fillet is correct, more than one can be taken.
Conclusion
-
Add Comments on Findings
-
As the report been completed correctly