Information
-
Civil Contract pre-inspection been carried out on
-
Supervisor Name
- Marlon Brown
- Dave Bagley
- Daniel Laycock
- Steven Hewkin
- Andrew Siddons
- Jamie Ayrton
- Des Rogan
- Jonathan Kelly
- Gary Handley
- Phil Edgell
- John Walsh
- John Whitehead
- Rob Austin
- Chris Gunn
- Sean Delaney
- Kevin Murphy
-
Location
-
Street Name
-
Conducted on
-
Build Area
Street Pre-Inspection Defect Form
-
Please state Starting Point i.e House Number or land Mark.
-
Please select Surface Type i.e Tarmac, Verge, Blocks, Flags, Concrete or Other
- Tarmac
- Verge
- Flags
- Block Paving
- Concrete
- Other
-
Please give Total distance of the pre-inspection area
-
Please take Photo of the pre-inspection area from start to finish more than one can be taken
-
Please state Finnish Point Point i.e House Number or land Mark.
-
Please Give as much Information required about Pre-inspection i.e Damage flag count, tarmac condition + any other information required.
-
Do you require to complete a Defect form part 2
-
Please state Starting Point i.e House Number or land Mark.
-
Please select Surface Type i.e Tarmac, Verge, Blocks, Flags, Concrete or Other
- Tarmac
- Verge
- Flags
- Block Paving
- Concrete
- Other
-
Please give Total distance of the pre-inspection area
-
Please take Photo of the pre-inspection area from start to finish more than one can be taken
-
Please state Finnish Point Point i.e House Number or land Mark.
-
Please Give as much Information required about Pre-inspection i.e Damage flag count, tarmac condition + any other information required.
-
Do you require to complete a Defect form part 3
-
Please state Starting Point i.e House Number or land Mark.
-
Please select Surface Type i.e Tarmac, Verge, Blocks, Flags, Concrete or Other
- Tarmac
- Verge
- Flags
- Block Paving
- Concrete
- Other
-
Please give Total distance of the pre-inspection area
-
Please take Photo of the pre-inspection area from start to finish more than one can be taken
-
Please state Finnish Point Point i.e House Number or land Mark.
-
Please Give as much Information required about Pre-inspection i.e Damage flag count, tarmac condition + any other information required.
Conclusion
-
As all Relevant Information been added to the report