Information
-
Inspection carried out By
- Carl Harding
- Anthony Whitaker
- Rob Griffiths
- jack Daniel
- Camron Scollen
-
Plant I.D
-
Plant Condition Sign Out or In
-
Front - Photo (Taken before issue or Returned)
-
Rear - Photo (Taken before issue or Returned)
-
N/S - Photo (Taken before issue or Returned)
-
O/S - Photo (Taken before issue or Returned)
-
Interior Photos (Front & Rear)
-
Internal / Hire Plant
-
Plant Type
-
Plant Make
-
Plant Milage if applicable
-
Report Started on
-
Location
I would like to take this opportunity to remind you of your Contractual Commitment (see Schedule 5 – Terms of Hire) to respect & maintain equipment and vehicles or you will be charged: Clause 8.1 If the Equipment is returned in damaged, unclean and/or defective state (except where due to fair wear and tear and/or an inherent fault in the Equipment) the Sub-contractor shall be liable to pay Heneghan for the cost of any repair and/or cleaning required to return the Equipment to a condition fit for re-hire Two recent examples of vehicle repairs which have been passed through due to user negligence are: Engine failure due to not user not completing basic oil and water level check - cost of repairs in excess of >£4k; and Coffee spilt on dash which has damaged the wiring loom - cost of repairs in excess of >£2k It is also your responsibility to notify us immediately (Clause 6.1.3) if you incur theft, loss or damage to any Plant or Equipment.
Plant Audit Condition Check
-
Plant kept clean & tidy (IF IN POOR STATE 48 HOURS TO CLEAN)
-
Please supply Photo of Vehicle inside, More than 1 photo can be Taken
-
Any New Damage to Plant & Possible Cost incurred through Neglect or Abuse (CHECK AGAINST ORIGINAL CHECK SHEET )
-
Give a Brief Description of Damage
-
Take Photo of Damage Items, More than one can be taken
List any other action or Items that need to be corrected
-
Are there any issue with this Plant check
-
Add comments or other issues.
Signatures
-
Signed by Team Leader
-
Signed by Heneghan Management