Information
-
Civil Contract audit been carried out on.
-
Company Name
- Heneghans
- McLaughlin
- Perfecta Group
- Hardwick
- AMG
- Cusack
- SAUK
-
Team Name
-
Person carrying out compliance audit
- Andy Abbott
- Zayd Bedford
- James Nairne
- Bartley Keane
- Dave Bagley
- Daniel Laycock
- Steven Hewkin
- Andrew Siddons
- Chris Lockham
- Steve Kemp
- Kevin Murphy
- Des Rogan
- Sean Delaney
- John Walsh
- Phil Edgell
- Mick Mcelhinney
- Rob Austin
- John Whitehead
- Bob Morris
- Ben Moody
- Chris Gunn
-
Conducted on
-
Location
-
Build Area
Pre Start Equipment / Vehicle PPE Audit
Contract Area
-
Civil Contract audit been carried out on.
Work Equipment & Pre-Start & Risk assessment Check
-
As a On-Site Risk Assessment been Completed
-
Please take photo of proof
-
As a the Team completed the Pre-Start Check Form.
-
Please take photo of proof
-
Do the team have a Gang & COSHH Pack
-
Please take photo of proof
-
Are all Team members waring Hi- Viz vest / clothing. (city fibre contract long sleeve + Logo vest must be worn)
-
Please take photo of proof
-
Are ALL team member wearing fire retardant clothing.
-
Please take photo of proof
-
Correct PPE Available and been used for relevant task i.e Hard hat's, Goggles, Ear defender, Dust mask.
-
Please take photo of proof
-
Utility Drawings on Site and in Date (UTILITY DRAWING VALID PERIOD DAYS - GAS-28 / ELECTRIC-30 / B.T-90 / WATER-90 / VIRGIN-90 ).
-
Please take photo of proof
-
Street works card on site and valid.
-
Please take photo of proof
-
Mini digger qualification card on site and valid.
-
Please take photo of proof
-
IPAF Operators Cert On-site
-
Please take photo of proof
-
Harness on-site & Fit to use
-
Please take photo of proof
-
Cat & Genny in date
-
Please take photo of proof
-
Cat & Genny - Are Batteries charged and fit for use (Test both equipment for power & noise indicators)
-
Please take photo of proof
-
GDU (Gas Detector) on-site Charged & In-calibration
-
Please take photo of proof
-
Roll Bar on-site (removing chamber lids)
-
Please take photo of proof
-
Pit Lifter On-site and Available
-
Please take photo of proof
-
Are ALL lifting Slings, Chains in Date and fit for Use and a copy of the CERT on-site.
-
Please take photo of proof
Van PPE Check
-
Vehicle Reg (Check trailer reg matches Vehicle Reg and plate is fit for purpose)
-
Please take a photo of Proof.
-
Is the van tidy inside and out i.e No rubbish on dash & all equipment stored Correctly in the rear. (PLEASE STATE WHICH IN COMMENTS
-
Please take a photo of Proof.
-
Is Van parked safely i.e within work area, not park on bend and have the correct SLG.
-
Please take photo of proof
-
Are Chevrons and Flashing beacon on Vehicle
-
Please take photo of proof
-
Fire Extinguisher in date & fit for use<br>
-
Please take photo of proof
-
Is there a Fully stock spill kit / Drip tray or Fuelling Matt on-site / in van
-
Please take photo of proof
-
Fully stock first aid box & in Date & First Aid Certification on-site
-
Please take photo of proof
Other Site Failures
-
Is there any other site failings.
-
Please take photo of proof
Work Equipment & Pre-Start & Risk assessment Check
-
As a On-Site Risk Assessment been Completed
-
Please take photo of proof
-
As a the Team completed the Pre-Start Check Form.
-
Please take photo of proof
-
Do the team have a Gang & COSHH Pack
-
Please take photo of proof
-
Are ALL team member wearing fire retardant clothing.
-
Please take photo of proof
-
Correct PPE Available and been used for relevant task i.e Hard hat's, Goggles, Ear defender, Dust mask.
-
Please take photo of proof
-
Are all Team members waring Hi- Viz vest / clothing. (city fibre contract long sleeve + Logo vest must be worn)
-
Please take photo of proof
-
Utility Drawings on Site and in Date (UTILITY DRAWING VALID PERIOD DAYS - GAS-28 / ELECTRIC-30 / B.T-90 / WATER-90 / VIRGIN-90 ).
-
Please take photo of proof
-
Street works card on site and valid.
-
Please take photo of proof
-
Mini digger qualification card on site and valid.
-
Please take photo of proof
-
Cat & Genny in date
-
Please take photo of proof
-
IPAF Operators Cert On-site
-
Please take photo of proof
-
Harness on-site & Fit to use
-
Please take photo of proof
-
Cat & Genny - Are Batteries charged and fit for use (Test both equipment for power & noise indicators)
-
Please take photo of proof
-
GDU (Gas Detector) on-site Charged & In-calibration
-
Please take photo of proof
-
Roll Bar on-site (removing chamber lids)
-
Please take photo of proof
-
Pit lifter On-Site & Available
-
Please take photo of proof
-
Are ALL lifting Slings, Chains in Date and fit for Use and a copy of the CERT on-site.
-
Please take photo of proof
Van & PPE Check
-
Vehicle Reg (Check trailer reg matches Vehicle Reg and plate is fit for purpose)
-
Please take a photo of Proof.
-
Is the van tidy inside and out i.e No rubbish on dash & all equipment stored Correctly in the rear. (PLEASE STATE WHICH IN COMMENTS
-
Please take a photo of Proof.
-
Is Van parked safely i.e within work area, not park on bend and have the correct SLG.
-
Please take photo of proof
-
Are Chevrons and Flashing beacon on Vehicle
-
Please take photo of proof
-
Fire Extinguisher in date & fit for use<br>
-
Please take photo of proof
-
Is there a Fully stock spill kit / Drip tray or Fuelling Matt on-site / in van
-
Please take photo of proof
-
Fully stock first aid box & in Date & First Aid Certification on-site.
-
Please take photo of proof
Other Site Failures
-
Is there any other site failings.
-
Please take photo of proof
Conclusion
-
Please supply a quick description of any findings of the workplace inspection.
-
Ganger or Supervisor Signature
-
Is the Audit Complete
-
Date and Time