Information

  • Hoist Handover Sheet

  • Document No.

  • BW - McCann - 135 Broadgate Estate

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Loading bay

  • Ropes Correctly Positioned on Sheaves

  • Operation of cage flaps, gates, and interlocks

  • Operation of landing flaps, gates and interlocks

  • Roof trapdoor and interlock ( Passenger Hoist )

  • Base enclosure gates and interlocks

  • Hoistway clear of obstruction

  • Mast ties are secure ( no undue movement )

  • Operating tools in working order

  • Emergency controls in working order

  • Mains isolator switch operation and condition

  • Operation of upper and lower limit switches

  • Operation of trailing cable storage system

  • Check cable guide springs are intact

  • Check brakes operate normally

  • Confirm there are no unusual noises from motor, gear box etc

  • Notices - Instructions, operating, warning

  • Leakage free from any Fuel System

  • Good condition of fuel container and security cap

  • Operation of audible or visual warning alarms

  • Communication system cage to ground level

  • Base enclose and cage roof clear from debris

  • SRM handed Goods Hoist over to BW fully operational

  • BW handed Goods Hoist over to SRM fully operational

  • Any Additional Comments

  • Relevant photo/s

Contractor's representative

  • LLS Signature

  • SRM Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.