Information

  • Audit Title

  • Document No.

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Loading bay

  • Is the loading bay clear from unwanted material

  • Has the loading bay been handed to SRM clean and tidy

  • Has the loading bay be handed to LLS clean and tidy

  • is the area free from re-portable incidences

  • Is the platform lift free from defects

  • Is the delivery lay down area clean and clear

  • Is the loading bay clear of any rubbish ?

  • Has the loading bay floors been swept

  • Is the access road to the loading bay clean and clear of any rubbish or materials

  • Is the mandatory material walk way from the loading bay to the goods hoist clean and clear of any rubbish / material

  • BW accept the Principle contractor status for the areas during the hours of 10pm - 6am ( next day )

  • SRM accept the Principle Contractor status for the areas during the hours of 6am - 10pm

  • Any Additional Comments

  • Relevant photo/s

Contractor's representative

  • LLS Signature

  • SRM Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.