Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
PROJECT:
-
Project
-
Location
-
Site
VERIFICATION:
-
1. Correct Plant for use .
-
2. Correct Plant delivered
-
3. Damage to Plant
MOUNTING OF PLANT:
-
Plant location as per drawing
-
Correct mounting brackets used
-
Correct material used
-
2. Pipe brackets as required
-
3. All pipework completed in area
-
4. All pipe work pressure tested
CONNECTING OF PLANT TO WATER SUPPLY AND HOT WATER SYSTEM:
-
1. Correct material used
-
2. Pipe brackets as required
-
3. All drains connected
-
4. Drained to approved location
-
CONNTROL PANNEL:
-
1. Control panel mounted in accessible location
-
2. Control panel securely fixed
-
3. Power supply connected to panel
COMMISSIONING:
-
1. Plant commissioned by supplier
-
2. Water supply turned on
-
3. Electrical supply turned on
-
4. All valves in operating position
-
5. All pressure gauges working and visible
-
6. Correct ventilation requirements in room
-
7. Plant operating correctly
-
Checked by
-
Signature