A) O&M general Activities

1.0 Audit Description

  • 1.1 Describe the general activities audited on site

  • 1.2 Name of O&M company supervisor

2.0 Audit report

  • Add an audit report for each activity audited on site

  • Activity audited
  • If the result of the next points are unsatisfactory (2.4, 2.12, 2.15) must be marked each option as Class III failed reponse

  • 2.1 Describe the specific task audited on site

  • Describe the specific task to be audit by the Services company

  • 2.2 Name of the serivces company audited

  • 2.3 Description of the area audited

  • 2.4 Se dispone de permiso de trabajo/ It is available the work permit on site

  • 2.5 Existe plan de seguridad/evaluación de riesgos/ the HS Plan or Risk Assesment is available and updated on site

  • 2.6 La documentación de seguridad se encuentra correcta y actualizada/ The safety documentation (paperwork) is correct and updated

  • 2.7 La zona de trabajo se encuentra señalizada con los riesgos existentes/ The work area is signed with the main risks

  • 2.8 Los huecos, aberturas, o desniveles se encuentran correctamente protegidos, con barandillas, barreras, etc./ the holes and gaps are protected properly with handrails, barriers, etc.

  • 2.9 El vallado o cierre perimetral de la instalación se encuentran en buen estado/ The installation of the perimeter fence is in good conditions

  • 2.10 Se hace uso de maquinaria con marcado CE, en buenas condiciones de mantenimiento y limpieza/ The machinery is marked with CE label, and is maintained properly

  • 2.11 La maquinaria dispone de las revisiones o inspecciones periódicas correspondientes/ The machinery has the checks and inspections updated

  • 2.12 Los equipos disponen de protecciones y la señalización adecuada/The work equipment has the proper safeguards and signaling

  • 2.13 Se dispone y se hace un uso correcto de los equipos de protección individual/ the ppe´s are available and the workers are using the ppe´ss properly

  • 2.14 Los equipos se encuentran revisados/ The ppe´s are checked

  • 2.15 Se hace uso de los equipos correctamente de acuerdo a los riesgos existentes/ The workers are using the ppe´s in according to the risks involved to this area

  • 2.16 La zona de trabajo se encuentra en buen estado de orden y limpieza/ The work area is in a good conditions respect to order and cleaning

  • 2.17 Las vias de paso y emergencia se encuentran libres de obstáculos/ The route or transit and emergency areas are free of obstacles

  • 2.18 Los productos químicos se encuentran en sus recipientes y etiquetados correctamente/ The hazard substances are in their containers and signed properly

  • 2.19 Existe un correcto orden y almacenaje de los productos/ There is a proper housekeeping and storage of the chemical products

  • 2.20 Se hace un uso correcto de los productos de acuerdo a las instrucciones del fabricante/ The chemical product are using in according to the manufacture instructions

  • 2.21 Se disponen, y se encuentran en buen estado los equipos de emergencia, rescate y evacuación/ It is available, and in a proper conditions, the emergency, rescue and evacuation equipments

  • 2.22 Existe señalización de los equipos, medios de emergencia y evacuación/ There is a proper signaling of the emergency equipments

  • 2.23 Se realiza un correcta limpieza y gestión de los residuos/ There is a good waste management

  • 2.24 Se realiza una almacenaje y señalización correcta de los residuos/ There is a proper storage and signaling of the waste area

  • 2.25 El equipo de trabajos disponen de medios de recogida o contención de los residuos/ The work equipment has the equipment and the resources to contain the spills and waste

  • 2.26 Existe una adecuada organización de los trabajos/ There is a good planning and organization of the tasks

  • 2.27 Se realizan inspecciones o controles de seguridad, antes durante y después de los trabajos/ The check and safety inspections are implemented on site (previous, during , and after the works)

  • 2.28 Se dispone y hace uso de la documentación de seguridad necesaria para la realización de los trabajos/ The work equipment has the safety documentation available to carry out the different tasks

  • 2.29 Se están realizando los trabajos bajo condiciones climatológicas adecaudas/ The weather conditions are suitable to develop the different activities

B) Activities with special Risk

3.0 TRABAJOS ESPECIAL PELIGROSIDAD/ Task with special Risk.

  • Any activity with special risk is carrying out?

  • Que tipo de trabajos se están desarrollando?/ What type of activities do it carry out on site?

  • 3.1 IZADO DE CARGAS/ Lifting Operations
  • The absence of the Lifting plan (3.1.1), must be marked the option Class III as failed reponse

  • 3.1.1 Se dispone y se ha informado del procedimiento/instrucción y del plan de izado/ The work team has avaialble on site , and have been informed about the protocol/instruction and lifting plan

  • 3.1.2 Los equipos y maquinaria de izado son correctos y están en buen estado para realizar la maniobra/ The lifting equipment and machinery are in a good conditions, and are the suitable to carry out the lifting

  • 3.1.3 Existen una organización adecuada para realizar la maniobra / There is a good organization to carry out the lifting

  • 3.2 TRABAJO EN CALIENTE/ Hot Works
  • If The work are have been not protected and signed (3.2.2), must be marked the option Class III as failed response

  • 3.2.1Existe una planificación de los trabajos/ There is a proper planning of the tasks

  • 3.2.2 La zona de trabajos esta preparada, protegida y señalizada/ The work area have been prepared, singed and protected

  • 3.2.3 Los equipos de emergencia se encuentran disponibles en la zona de trabajo/ The emergency equipments are available on the work area

  • 3.2.4 Se dispone y se hace un uso correcto de los equipos de protección contra riesgos térmicos/the workers have and are using the specific ppe´s against the thermal contact risk

  • 3.3 TRABAJOS RIESGO ELÉCTRICO/Electrical works
  • Will be failed response if have been not implemented the 5 golden rules (electrical task) (3.3.3)

  • 3.3.1 Se dispone del procedimiento, instrucción y las habilitaciones necesarias para realizar trabajos de riesgo eléctrico/ The work team has the protocol, instruction and the electical competence required to carry out the electrical works

  • 3.3.2 Se disponen y hace uso de los equipos de bloqueo y señalización/ the work team has been implemented the "LOTO" safety practices

  • 3.3.3 Se han cumplido las 5 reglas de oro/ The five golden rules have been implemented

  • 3.3.4 Los equipos de medida y de protección son acordes al tipo y potencia de la instalación/ The measures and protection equipment are suitable to the voltage of the electrical installation

  • 3.4 TRABAJOS EN ALTURA/ Work at heights
  • The absence of the rescue and evacutaion equipment (3.4.3), must be marked the option Class III as failed reponse

  • 3.4.1 Se está utilizando equipos de protección contra caída de altura, correctos al tipo de trabajo/ The workers are using the work at height ppe´s properly

  • 3.4.2 Los puntos de anclaje, línea de vida, etc. están en buen estado de revisión/ The anchorage point, safety line, etc. are in a good conditions and checked.

  • 3.4.3 Se dispone de un equipo de rescate y evacuación, y los trabajadores conocen su uso/There is a rescue and evacuation equipment. The workers knows the use of these equipments

  • 3.5 ESPACIOS CONFINADOS/ Confined Space
  • The absence of the rescue system (3.5.3), must be marked the option Class III as failed reponse

  • 3.5.1 Se ha establecido un protocolo o procedimiento de acceso y evacuación/ An access and evacuation protocol is implemented on site

  • 3.5.2 Se dispone de permisos de trabajo/ It is available and implemented a work permit system

  • 3.5.3 Se disponen de los equipos de rescate y evacuación adecuados/ It is available the rescue and evacuation equipments on site

  • 3.5.4 Se han informado y formado a los trabajadores sobre el protocolo de acceso y evacuación/ The work team have been informed and trained of the access and evacuation protocol

C) Summary and Signature

  • Other Comments

  • Site Manager/ Supervisor

  • Auditor

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.