Title Page

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location

OHSE Management plan

  • Conset OHSE Management Plan available on site

Planning/Communication/Consultation

  • Daily Prestarts completed

  • Image of completed prestarts

  • Weekly Toolbox talks completed

  • Image of completed toolbox talks

Housekeeping

  • Open work areas

  • Image of open work areas

  • Walkways demarcated

  • Images of demarcated walkways

  • Stripping in progress demarcated and signage in place

  • Controls in place to prevent uncontrolled movement of materials during stripping task

Site Inspection

  • Workers wearing appropriate PPE for task

  • Image of worker(s) wearing PPE

  • Handrails/edge protection in place

  • Image of handrail/edge protection system

  • Penetrations covered, covers secure and identified

  • Image of penetration covers

Safe Work Method Statements

  • Available on site for tasks being conducted

  • Worker have been inducted into site SWMS associated with task

  • Workers completing task as per SWMS

Sub-contractor Management

  • Post tension contractor compliance with safety and site requirements

  • Concrete placement contractor compliance with safety and site requirements

  • Crane contractor compliance with safety and site requirements

  • Concrete pump contractor compliance with safety and site requirements

  • Reinforcement contractor compliance with safety and site requirements

  • Scaffold contractor compliance with safety and site requirements

Quality Inspections

  • ITP's and or checklists completed for works conducted

  • ITP's and checklist reviewed

  • Images of ITP's reviewed

Testing and Tagging

  • All electrical equipment test and tag current

  • All kibble lifting points test and tag current

  • Lifting equipment test and tag current

Plant and Equipment

  • Log books up to date

  • Plant inspected

  • Images of log book

Weekly safety walk inspection

  • Weekly safety walks conducted

  • Actions closed/rectified within client time frame

  • Reoccurring actions

Incident Reporting

  • Incidents reported to HSEQ Coordinator at the time of occurrence

  • Total incidents reported

Foreman Signoff

  • Foreman Name

  • Foreman signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.