Information

Health, Safety, Environment and Quality Audit Checklist (Public, Private, Technical Services and Workspace)

  • Location:

  • Person(s) present during the audit:

  • Date:

  • Audit No.

  • Person(s) completing the audit:

Scope of Works

  • Description (services provided, staff levels, hours of work etc)

1.0 Health and Safety

  • 1. H&S Policy Displayed

  • Additional notes / sketches

  • Add drawing

  • 2. Accident report book

  • Additional notes / sketches

  • Add drawing

  • 3. Protective clothing and equipment records

  • Additional notes / sketches

  • Add drawing

  • 4. Health and Safety Systems Manual

  • Additional notes / sketches

  • Add drawing

  • 5. HSE Operations Manual Technical Engineers

  • Additional notes / sketches

  • Add drawing

  • 6. Risk Assessments

  • Additional notes / sketches

  • Add drawing

  • 7. Method Statements

  • Additional notes / sketches

  • Add drawing

  • 8. Safe Work Procedure (e.g. method statements, permit to work, operational procedures)

  • Additional notes / sketches

  • Add drawing

  • 9. Weekly H&S Checklist's completed?

  • Additional notes / sketches

  • Add drawing

  • 10. Toolbox Talks and records

  • Additional notes / sketches

  • Add drawing

  • 11. H&S Representative appointed?

  • Additional notes / sketches

  • Add drawing

  • 12. Statutory Notices displayed (Workplace Law poster)

  • Additional notes / sketches

  • Add drawing

  • 13. Asbestos Survey<br>Annual re-assessments

  • Additional notes / sketches

  • Add drawing

  • 14. Asbestos Management Plan<br>Reviewed every 6-12 months

  • Additional notes / sketches

  • Add drawing

  • 15. Legionella Management

  • 15a. Hot Water Services - (i) Water Risk Assessment

  • Additional notes / sketches

  • Add drawing

  • 15a. Hot Water Services - (ii) Monthly calorifier flow and return temperatures

  • Additional notes / sketches

  • Add drawing

  • 15a. Hot Water Services - (iii) Monthly Water Temperature checks on sentinel taps (above 50c)

  • Additional notes / sketches

  • Add drawing

  • 15a. Hot Water Services - (iv) Annual. Water Temperature checks on all represenative taps (above 50c)

  • Additional notes / sketches

  • Add drawing

  • 15a. Hot Water Services - (v) Annual internal check on calorifier surfaces

  • Additional notes / sketches

  • Add drawing

  • 15b. Cold Water Services - (i) Monthly Water Temperature checks on sentinel taps (below 20c)

  • Additional notes / sketches

  • Add drawing

  • 15b. Cold Water Services - (ii) Six monthly. Check tank water temperature remote from ball valve and mains temperature at ball valve

  • Additional notes / sketches

  • Add drawing

  • 15b. Cold Water Services - (iii) Annual. Visual inspection of cold water and remedial works if necessary

  • Additional notes / sketches

  • Add drawing

  • 15b. Cold Water Services - (iv) Annual. Water Temperature checks on all represenative taps (below 20c)

  • Additional notes / sketches

  • Add drawing

  • 15c. Shower heads - Quarterly or as necessary. Dismantle, clean and descale shower heads and hoses

  • Additional notes / sketches

  • Add drawing

  • 15d. Little used outlets - Weekly. Flush and purge to drain

  • Additional notes / sketches

  • Add drawing

  • 16. Portable Appliance testing management

  • Additional notes / sketches

  • Add drawing

  • 17. Lifts statutory testing management (including escalators and moving walkways)<br>Thorough inspection - Passenger lifts every 6 months, Goods lifts every 12 months.<br>

  • Additional notes / sketches

  • Add drawing

  • 18. Stair Lifts and Hoists statutory testing management

  • Additional notes / sketches

  • Add drawing

  • 19. Gas Statutory testing management<br>Annual inspection of gas boilers and safety devices to include distribution pipework

  • Additional notes / sketches

  • Add drawing

  • 20. Fixed Wiring Test (5 yearly)

  • Additional notes / sketches

  • Add drawing

  • 21. Emergency Lighting

  • 21a. Emergency Lighting monthly functionality test

  • Additional notes / sketches

  • Add drawing

  • 21b. Emergency Lighting annual full discharge test in accordance with manufacturers instructions (3 hours)

  • Additional notes / sketches

  • Add drawing

  • 22. Noise and Vibration

  • Additional notes / sketches

  • Add drawing

  • 23. Ergonomic Factors considered in the work layout and task design

  • Additional notes / sketches

  • Add drawing

  • 24. Display Screen Equipment assessment

  • Additional notes / sketches

  • Add drawing

  • 25. Manual Handling Risk Assessments completed

  • Additional notes / sketches

  • Add drawing

  • 26. Manual Handling controls implemented

  • Additional notes / sketches

  • Add drawing

  • 27. Mechanical Handling Aids provided and used

  • Additional notes / sketches

  • Add drawing

  • 28. First Aid

  • 29. First Aid cabinets and contents clean and orderly

  • Additional notes / sketches

  • Add drawing

  • 30. First Aid stock meets requirements

  • Additional notes / sketches

  • Add drawing

  • 31. First Aiders, names, location and phone numbers displayed

  • Additional notes / sketches

  • Add drawing

  • 32. Qualified First Aiders on site

  • Additional notes / sketches

  • Add drawing

  • 33. Record of treatment and of supplies dispensed

  • Additional notes / sketches

  • Add drawing

  • 34. Fire

  • 34a. Lightening Protection<br>Annual

  • Additional notes / sketches

  • Add drawing

  • 35. Fire Risk Assessment in place. <br>Annual review

  • Additional notes / sketches

  • Add drawing

  • 36. Emergency signage

  • Additional notes / sketches

  • Add drawing

  • 37. Fire Extinguishers in place<br>Annual inspection

  • Additional notes / sketches

  • Add drawing

  • 38. Fire Equipment serviced and tagged

  • Additional notes / sketches

  • Add drawing

  • 39. Appropriate signage of extinguishers

  • Additional notes / sketches

  • Add drawing

  • 40. Extinguishers appropriate to hazard

  • Additional notes / sketches

  • Add drawing

  • 41. Emergency exit signage

  • Additional notes / sketches

  • Add drawing

  • 42. Exit doors easily opened from the inside

  • Additional notes / sketches

  • Add drawing

  • 43. Exit pathways clear of obstruction

  • Additional notes / sketches

  • Add drawing

  • 44. Fire Alarm / Communication System is adequate

  • Additional notes / sketches

  • Add drawing

  • 45. Emergency Personnel is identified e.g. fire wardens / specialist roles

  • Additional notes / sketches

  • Add drawing

  • 46. Fire Emergency Plan / Action Notice displayed

  • Additional notes / sketches

  • Add drawing

  • 47. Fire Alarms tested<br>Weekly test

  • Additional notes / sketches

  • Add drawing

  • 48. Trial Evacuations conducted<br>Six monthly drills

  • Additional notes / sketches

  • Add drawing

  • 49. Personnel trained in the use of fire fighting equipment

  • Additional notes / sketches

  • Add drawing

  • 50. Flammable storage procedures in place

  • Additional notes / sketches

  • Add drawing

  • 51. Ladders

  • 52. Ladder Register maintained

  • Additional notes / sketches

  • Add drawing

  • 53. Ladder Inspections carried out<br>Six monthly

  • Additional notes / sketches

  • Add drawing

  • 54. Ladders tagged

  • Additional notes / sketches

  • Add drawing

  • 55. Ladders in good condition

  • Additional notes / sketches

  • Add drawing

  • 56. Painted Ladders not used

  • Additional notes / sketches

  • Add drawing

  • 57. Plant and Equipment

  • 58. Plant and Equipment in good condition

  • Additional notes / sketches

  • Add drawing

  • 59. Daily safety / inspection checklist completed

  • Additional notes / sketches

  • Add drawing

  • 60. Fault reporting / rectification system used

  • Additional notes / sketches

  • Add drawing

  • 61. Operators trained and licensed

  • Additional notes / sketches

  • Add drawing

  • 62. Safety warnings and instructions displayed

  • Additional notes / sketches

  • Add drawing

  • 63. Warning lights operational

  • Additional notes / sketches

  • Add drawing

  • 64. Forklift reversing alarm operational

  • Additional notes / sketches

  • Add drawing

  • 65. Forklift fire extinguisher

  • Additional notes / sketches

  • Add drawing

  • 66. Forklift tyres satisfactory

  • Additional notes / sketches

  • Add drawing

  • 67. SWL of lifting or carrying equipment displayed

  • Additional notes / sketches

  • Add drawing

  • 67a. Lifting equipment<br>thorough inspection every 12 months

  • Additional notes / sketches

  • Add drawing

  • 68. Specialist PPE (harnesses, lanyards) <br>Annual inspection by competent person. Pre use checks SF187

  • Additional notes / sketches

  • Add drawing

  • 69. MEWPS completion of a pre-use inspection checklist

  • Additional notes / sketches

  • Add drawing

  • 70. MEWPS checking of IPAF licences against MEWPS hired (1a, 1b, 1c etc)

  • Additional notes / sketches

  • Add drawing

  • 71. Checking of eye bolt testing certificates

  • Additional notes / sketches

  • Add drawing

  • 72. Checking of window cleaning cradles, runways and gantry inspection

  • Additional notes / sketches

  • Add drawing

  • 73. Compactor / Baler. Adequate guarding and security.

  • Additional notes / sketches

  • Add drawing

  • 74. Vehicle Inspection. Daily / weekly checklists completed

  • Additional notes / sketches

  • Add drawing

  • 75. Harness inspection and checks<br>Annual inspection by competent person. Pre use checks SF187

  • Additional notes / sketches

  • Add drawing

  • 76. Mansafe / Latchway systems inspection and checks<br>Annual inspection by competent person

  • Additional notes / sketches

  • Add drawing

  • 77. COSHH

  • 78. COSHH assessments

  • Additional notes / sketches

  • Add drawing

  • 79. Material Safety Data Sheets available

  • Additional notes / sketches

  • Add drawing

  • 80. Chemical handling procedures followed

  • Additional notes / sketches

  • Add drawing

  • 81. Site Chemical Register developed

  • Additional notes / sketches

  • Add drawing

  • 82. Chemicals stored appropriately

  • Additional notes / sketches

  • Add drawing

  • 83. Chemical containers labelled correctly

  • Additional notes / sketches

  • Add drawing

  • 84. Adequate ventilation / exhaust systems

  • Additional notes / sketches

  • Add drawing

  • 85. Protective clothing / equipment available and used e.g. cleaning, security, engineers

  • Additional notes / sketches

  • Add drawing

  • 86. Personal hygiene - dermatitis control

  • Additional notes / sketches

  • Add drawing

  • 87. Appropriate emergency / first aid equipment (shower, eyewash, extinguishers etc)

  • Additional notes / sketches

  • Add drawing

  • 88. Hazchem signage displayed

  • Additional notes / sketches

  • Add drawing

  • 89. Other

  • 90. Radiation protection advisor appointed

  • Additional notes / sketches

  • Add drawing

  • 91. Radiation equipment listed and identified

  • Additional notes / sketches

  • Add drawing

  • 92. Radiation equipment notified / registered with appropriate authority e.g. HSE

  • Additional notes / sketches

  • Add drawing

  • 93. Laser Operator has 'laser operators license'

  • Additional notes / sketches

  • Add drawing

  • 94. Laser not used in a manner likely to endanger others

  • Additional notes / sketches

  • Add drawing

2.0 Quality

  • 95. Contract File

  • Additional notes / sketches

  • Add drawing

  • 96. Quality Plan

  • Additional notes / sketches

  • Add drawing

  • 97. Site log book (operations - technical)

  • Additional notes / sketches

  • Add drawing

  • 98. Training Records (SF30, 31, 32, 62, 108, 230)

  • Additional notes / sketches

  • Add drawing

  • 99. PPM schedules (operational services)

  • Additional notes / sketches

  • Add drawing

  • 100. PPM schedules (managed services)

  • Additional notes / sketches

  • Add drawing

  • 101. KPI's management / reporting

  • Additional notes / sketches

  • Add drawing

  • 102. Employers liability insurance displayed

  • Additional notes / sketches

  • Add drawing

  • 103. QM system manual

  • Additional notes / sketches

  • Add drawing

  • 104. Quality Policy

  • Additional notes / sketches

  • Add drawing

  • 105. Cleaning task sheets

  • Additional notes / sketches

  • Add drawing

  • 106. Induction records

  • Additional notes / sketches

  • Add drawing

  • 107. Complaints procedure

  • Additional notes / sketches

  • Add drawing

  • 108. Contractor management

  • Additional notes / sketches

  • Add drawing

  • 109. Information technology

  • Additional notes / sketches

  • Add drawing

  • 110. KPI's

  • Additional notes / sketches

  • Add drawing

  • 111. Customer Survey results

  • Additional notes / sketches

  • Add drawing

  • 112. Emergency Procedures e.g. business contingency plan

  • Additional notes / sketches

  • Add drawing

  • 113. Security

  • 114. SIA Licenses displayed by all security staff

  • Additional notes / sketches

  • Add drawing

  • 115. SIA LDN criteria compiled with

  • Additional notes / sketches

  • Add drawing

  • 116. SIA CCTV operative licence(s) held by relevant staff

  • Additional notes / sketches

  • Add drawing

  • 117. CCTV control room (fit for purpose etc)

  • Additional notes / sketches

  • Add drawing

  • 118. CCTV logs / forms (subject access request / release of images)

  • Additional notes / sketches

  • Add drawing

  • 119. CCTV control room visitors log

  • Additional notes / sketches

  • Add drawing

  • 120. CCTV warning signs

  • Additional notes / sketches

  • Add drawing

  • 121. CCTV still images secured

  • Additional notes / sketches

  • Add drawing

  • 122. CCTV image storage / access

  • Additional notes / sketches

  • Add drawing

  • 123. CCTV system compliant to BS7958 and ICO C of P

  • Additional notes / sketches

  • Add drawing

  • 124. Incident reports available and used

  • Additional notes / sketches

  • Add drawing

  • 125. Europa emergency management plan on site

  • Additional notes / sketches

  • Add drawing

  • 126. Daily occurrence book in place

  • Additional notes / sketches

  • Add drawing

  • 127. Emergency procedures manual on site

  • Additional notes / sketches

  • Add drawing

  • 128. Security risk assessments available and in date

  • Additional notes / sketches

  • Add drawing

  • 129. Key management procedure

  • Additional notes / sketches

  • Add drawing

  • 130. Booking on / off / check calls procedure (Timegate)

  • Additional notes / sketches

  • Add drawing

  • 131. Europa ID cards

  • Additional notes / sketches

  • Add drawing

  • 132. Assignment instructions (in date etc)

  • Additional notes / sketches

  • Add drawing

  • 133. Shift pattern worked

  • Additional notes / sketches

  • Add drawing

  • 134. Manning levels

  • Additional notes / sketches

  • Add drawing

  • 135. Patrol pattern(s)

  • Additional notes / sketches

  • Add drawing

  • 136. Access to security procedures

  • Additional notes / sketches

  • Add drawing

  • 137. Access to training modules / toolbox talks

  • Additional notes / sketches

  • Add drawing

  • 138. Europa security handbook on site

  • Additional notes / sketches

  • Add drawing

  • 139. Supplied equipment maintained and used correctly e.g. radios, torches

  • Additional notes / sketches

  • Add drawing

  • 140. Subcontract staff used

  • Additional notes / sketches

  • Add drawing

  • 141. HR (head office)

  • 142a. Training records maintained

  • Additional notes / sketches

  • Add drawing

  • 142b. Security vetting records

  • Additional notes / sketches

  • Add drawing

  • 142c. CRB check records

  • Additional notes / sketches

  • Add drawing

  • 142d. Policies maintained

  • Additional notes / sketches

  • Add drawing

  • 142e. Night worker health

  • Additional notes / sketches

  • Add drawing

  • 143. Supply chain management procedures maintained

  • Additional notes / sketches

  • Add drawing

  • 144. Finance purchase orders maintained

  • Additional notes / sketches

  • Add drawing

  • 145. Data protection storage procedures compliant

  • Additional notes / sketches

  • Add drawing

  • 146. PDP`s / appraisals for staff

  • Additional notes / sketches

  • Add drawing

  • 147. Information Technology (business / offices)

  • 148a. Server diagram updated

  • Additional notes / sketches

  • Add drawing

  • 148b. Back up procedures maintained

  • Additional notes / sketches

  • Add drawing

  • 148c. Equipment disposal records

  • Additional notes / sketches

  • Add drawing

3.0 Environment

  • 149. Environmental Policy Statement

  • Additional notes / sketches

  • Add drawing

  • 150. Environmental Manual

  • Additional notes / sketches

  • Add drawing

  • 151. Aspects and Impacts Assessment

  • Additional notes / sketches

  • Add drawing

  • 152. Waste Transfer Note

  • Additional notes / sketches

  • Add drawing

  • 153. Hazardous Waste Consignment Note

  • Additional notes / sketches

  • Add drawing

  • 154. Waste transfer notes retained (stored for 2 years)

  • Additional notes / sketches

  • Add drawing

  • 155. Hazardous waste consignment notes retained (stored for 3 years)

  • Additional notes / sketches

  • Add drawing

  • 156. Waste Management Plan

  • Additional notes / sketches

  • Add drawing

  • 157. Waste duty of care visit<br>Annual

  • Additional notes / sketches

  • Add drawing

  • 158. Corporate Social Responsibility and Sustainability report

  • Additional notes / sketches

  • Add drawing

  • 159. Habitat Management Plan

  • Additional notes / sketches

  • Add drawing

  • 160. Air conditioning certificate<br>5 yearly

  • Additional notes / sketches

  • Add drawing

  • 161. Energy strategy

  • Additional notes / sketches

  • Add drawing

  • 162. Air control emmisions

  • Additional notes / sketches

  • Add drawing

  • 163. Spill kits

  • Additional notes / sketches

  • Add drawing

  • 164. Display energy certificate<br>Annual

  • Additional notes / sketches

  • Add drawing

  • 165. Carbon reduction commitment return submitted<br>Annual

  • Additional notes / sketches

  • Add drawing

  • 166. Emergency procedures

  • Additional notes / sketches

  • Add drawing

Site Tour

    Safety Observation
  • Location:

  • Safety Observation:

  • Additional notes / sketches

  • Add drawing

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.