Health, Safety, Environment and Quality Audit Checklist (Public, Private, Technical Services and Workspace)
-
Location:
-
Person(s) present during the audit:
-
Date:
-
Audit No.
-
Person(s) completing the audit:
Scope of Works
-
Description (services provided, staff levels, hours of work etc)
1.0 Health and Safety
-
1. H&S Policy Displayed
-
Additional notes / sketches
-
Add drawing
-
2. Accident report book
-
Additional notes / sketches
-
Add drawing
-
3. Protective clothing and equipment records
-
Additional notes / sketches
-
Add drawing
-
4. Health and Safety Systems Manual
-
Additional notes / sketches
-
Add drawing
-
5. HSE Operations Manual Technical Engineers
-
Additional notes / sketches
-
Add drawing
-
6. Risk Assessments
-
Additional notes / sketches
-
Add drawing
-
7. Method Statements
-
Additional notes / sketches
-
Add drawing
-
8. Safe Work Procedure (e.g. method statements, permit to work, operational procedures)
-
Additional notes / sketches
-
Add drawing
-
9. Weekly H&S Checklist's completed?
-
Additional notes / sketches
-
Add drawing
-
10. Toolbox Talks and records
-
Additional notes / sketches
-
Add drawing
-
11. H&S Representative appointed?
-
Additional notes / sketches
-
Add drawing
-
12. Statutory Notices displayed (Workplace Law poster)
-
Additional notes / sketches
-
Add drawing
-
13. Asbestos Survey<br>Annual re-assessments
-
Additional notes / sketches
-
Add drawing
-
14. Asbestos Management Plan<br>Reviewed every 6-12 months
-
Additional notes / sketches
-
Add drawing
-
15. Legionella Management
-
15a. Hot Water Services - (i) Water Risk Assessment
-
Additional notes / sketches
-
Add drawing
-
15a. Hot Water Services - (ii) Monthly calorifier flow and return temperatures
-
Additional notes / sketches
-
Add drawing
-
15a. Hot Water Services - (iii) Monthly Water Temperature checks on sentinel taps (above 50c)
-
Additional notes / sketches
-
Add drawing
-
15a. Hot Water Services - (iv) Annual. Water Temperature checks on all represenative taps (above 50c)
-
Additional notes / sketches
-
Add drawing
-
15a. Hot Water Services - (v) Annual internal check on calorifier surfaces
-
Additional notes / sketches
-
Add drawing
-
15b. Cold Water Services - (i) Monthly Water Temperature checks on sentinel taps (below 20c)
-
Additional notes / sketches
-
Add drawing
-
15b. Cold Water Services - (ii) Six monthly. Check tank water temperature remote from ball valve and mains temperature at ball valve
-
Additional notes / sketches
-
Add drawing
-
15b. Cold Water Services - (iii) Annual. Visual inspection of cold water and remedial works if necessary
-
Additional notes / sketches
-
Add drawing
-
15b. Cold Water Services - (iv) Annual. Water Temperature checks on all represenative taps (below 20c)
-
Additional notes / sketches
-
Add drawing
-
15c. Shower heads - Quarterly or as necessary. Dismantle, clean and descale shower heads and hoses
-
Additional notes / sketches
-
Add drawing
-
15d. Little used outlets - Weekly. Flush and purge to drain
-
Additional notes / sketches
-
Add drawing
-
16. Portable Appliance testing management
-
Additional notes / sketches
-
Add drawing
-
17. Lifts statutory testing management (including escalators and moving walkways)<br>Thorough inspection - Passenger lifts every 6 months, Goods lifts every 12 months.<br>
-
Additional notes / sketches
-
Add drawing
-
18. Stair Lifts and Hoists statutory testing management
-
Additional notes / sketches
-
Add drawing
-
19. Gas Statutory testing management<br>Annual inspection of gas boilers and safety devices to include distribution pipework
-
Additional notes / sketches
-
Add drawing
-
20. Fixed Wiring Test (5 yearly)
-
Additional notes / sketches
-
Add drawing
-
21. Emergency Lighting
-
21a. Emergency Lighting monthly functionality test
-
Additional notes / sketches
-
Add drawing
-
21b. Emergency Lighting annual full discharge test in accordance with manufacturers instructions (3 hours)
-
Additional notes / sketches
-
Add drawing
-
22. Noise and Vibration
-
Additional notes / sketches
-
Add drawing
-
23. Ergonomic Factors considered in the work layout and task design
-
Additional notes / sketches
-
Add drawing
-
24. Display Screen Equipment assessment
-
Additional notes / sketches
-
Add drawing
-
25. Manual Handling Risk Assessments completed
-
Additional notes / sketches
-
Add drawing
-
26. Manual Handling controls implemented
-
Additional notes / sketches
-
Add drawing
-
27. Mechanical Handling Aids provided and used
-
Additional notes / sketches
-
Add drawing
-
28. First Aid
-
29. First Aid cabinets and contents clean and orderly
-
Additional notes / sketches
-
Add drawing
-
30. First Aid stock meets requirements
-
Additional notes / sketches
-
Add drawing
-
31. First Aiders, names, location and phone numbers displayed
-
Additional notes / sketches
-
Add drawing
-
32. Qualified First Aiders on site
-
Additional notes / sketches
-
Add drawing
-
33. Record of treatment and of supplies dispensed
-
Additional notes / sketches
-
Add drawing
-
34. Fire
-
34a. Lightening Protection<br>Annual
-
Additional notes / sketches
-
Add drawing
-
35. Fire Risk Assessment in place. <br>Annual review
-
Additional notes / sketches
-
Add drawing
-
36. Emergency signage
-
Additional notes / sketches
-
Add drawing
-
37. Fire Extinguishers in place<br>Annual inspection
-
Additional notes / sketches
-
Add drawing
-
38. Fire Equipment serviced and tagged
-
Additional notes / sketches
-
Add drawing
-
39. Appropriate signage of extinguishers
-
Additional notes / sketches
-
Add drawing
-
40. Extinguishers appropriate to hazard
-
Additional notes / sketches
-
Add drawing
-
41. Emergency exit signage
-
Additional notes / sketches
-
Add drawing
-
42. Exit doors easily opened from the inside
-
Additional notes / sketches
-
Add drawing
-
43. Exit pathways clear of obstruction
-
Additional notes / sketches
-
Add drawing
-
44. Fire Alarm / Communication System is adequate
-
Additional notes / sketches
-
Add drawing
-
45. Emergency Personnel is identified e.g. fire wardens / specialist roles
-
Additional notes / sketches
-
Add drawing
-
46. Fire Emergency Plan / Action Notice displayed
-
Additional notes / sketches
-
Add drawing
-
47. Fire Alarms tested<br>Weekly test
-
Additional notes / sketches
-
Add drawing
-
48. Trial Evacuations conducted<br>Six monthly drills
-
Additional notes / sketches
-
Add drawing
-
49. Personnel trained in the use of fire fighting equipment
-
Additional notes / sketches
-
Add drawing
-
50. Flammable storage procedures in place
-
Additional notes / sketches
-
Add drawing
-
51. Ladders
-
52. Ladder Register maintained
-
Additional notes / sketches
-
Add drawing
-
53. Ladder Inspections carried out<br>Six monthly
-
Additional notes / sketches
-
Add drawing
-
54. Ladders tagged
-
Additional notes / sketches
-
Add drawing
-
55. Ladders in good condition
-
Additional notes / sketches
-
Add drawing
-
56. Painted Ladders not used
-
Additional notes / sketches
-
Add drawing
-
57. Plant and Equipment
-
58. Plant and Equipment in good condition
-
Additional notes / sketches
-
Add drawing
-
59. Daily safety / inspection checklist completed
-
Additional notes / sketches
-
Add drawing
-
60. Fault reporting / rectification system used
-
Additional notes / sketches
-
Add drawing
-
61. Operators trained and licensed
-
Additional notes / sketches
-
Add drawing
-
62. Safety warnings and instructions displayed
-
Additional notes / sketches
-
Add drawing
-
63. Warning lights operational
-
Additional notes / sketches
-
Add drawing
-
64. Forklift reversing alarm operational
-
Additional notes / sketches
-
Add drawing
-
65. Forklift fire extinguisher
-
Additional notes / sketches
-
Add drawing
-
66. Forklift tyres satisfactory
-
Additional notes / sketches
-
Add drawing
-
67. SWL of lifting or carrying equipment displayed
-
Additional notes / sketches
-
Add drawing
-
67a. Lifting equipment<br>thorough inspection every 12 months
-
Additional notes / sketches
-
Add drawing
-
68. Specialist PPE (harnesses, lanyards) <br>Annual inspection by competent person. Pre use checks SF187
-
Additional notes / sketches
-
Add drawing
-
69. MEWPS completion of a pre-use inspection checklist
-
Additional notes / sketches
-
Add drawing
-
70. MEWPS checking of IPAF licences against MEWPS hired (1a, 1b, 1c etc)
-
Additional notes / sketches
-
Add drawing
-
71. Checking of eye bolt testing certificates
-
Additional notes / sketches
-
Add drawing
-
72. Checking of window cleaning cradles, runways and gantry inspection
-
Additional notes / sketches
-
Add drawing
-
73. Compactor / Baler. Adequate guarding and security.
-
Additional notes / sketches
-
Add drawing
-
74. Vehicle Inspection. Daily / weekly checklists completed
-
Additional notes / sketches
-
Add drawing
-
75. Harness inspection and checks<br>Annual inspection by competent person. Pre use checks SF187
-
Additional notes / sketches
-
Add drawing
-
76. Mansafe / Latchway systems inspection and checks<br>Annual inspection by competent person
-
Additional notes / sketches
-
Add drawing
-
77. COSHH
-
78. COSHH assessments
-
Additional notes / sketches
-
Add drawing
-
79. Material Safety Data Sheets available
-
Additional notes / sketches
-
Add drawing
-
80. Chemical handling procedures followed
-
Additional notes / sketches
-
Add drawing
-
81. Site Chemical Register developed
-
Additional notes / sketches
-
Add drawing
-
82. Chemicals stored appropriately
-
Additional notes / sketches
-
Add drawing
-
83. Chemical containers labelled correctly
-
Additional notes / sketches
-
Add drawing
-
84. Adequate ventilation / exhaust systems
-
Additional notes / sketches
-
Add drawing
-
85. Protective clothing / equipment available and used e.g. cleaning, security, engineers
-
Additional notes / sketches
-
Add drawing
-
86. Personal hygiene - dermatitis control
-
Additional notes / sketches
-
Add drawing
-
87. Appropriate emergency / first aid equipment (shower, eyewash, extinguishers etc)
-
Additional notes / sketches
-
Add drawing
-
88. Hazchem signage displayed
-
Additional notes / sketches
-
Add drawing
-
89. Other
-
90. Radiation protection advisor appointed
-
Additional notes / sketches
-
Add drawing
-
91. Radiation equipment listed and identified
-
Additional notes / sketches
-
Add drawing
-
92. Radiation equipment notified / registered with appropriate authority e.g. HSE
-
Additional notes / sketches
-
Add drawing
-
93. Laser Operator has 'laser operators license'
-
Additional notes / sketches
-
Add drawing
-
94. Laser not used in a manner likely to endanger others
-
Additional notes / sketches
-
Add drawing
2.0 Quality
-
95. Contract File
-
Additional notes / sketches
-
Add drawing
-
96. Quality Plan
-
Additional notes / sketches
-
Add drawing
-
97. Site log book (operations - technical)
-
Additional notes / sketches
-
Add drawing
-
98. Training Records (SF30, 31, 32, 62, 108, 230)
-
Additional notes / sketches
-
Add drawing
-
99. PPM schedules (operational services)
-
Additional notes / sketches
-
Add drawing
-
100. PPM schedules (managed services)
-
Additional notes / sketches
-
Add drawing
-
101. KPI's management / reporting
-
Additional notes / sketches
-
Add drawing
-
102. Employers liability insurance displayed
-
Additional notes / sketches
-
Add drawing
-
103. QM system manual
-
Additional notes / sketches
-
Add drawing
-
104. Quality Policy
-
Additional notes / sketches
-
Add drawing
-
105. Cleaning task sheets
-
Additional notes / sketches
-
Add drawing
-
106. Induction records
-
Additional notes / sketches
-
Add drawing
-
107. Complaints procedure
-
Additional notes / sketches
-
Add drawing
-
108. Contractor management
-
Additional notes / sketches
-
Add drawing
-
109. Information technology
-
Additional notes / sketches
-
Add drawing
-
110. KPI's
-
Additional notes / sketches
-
Add drawing
-
111. Customer Survey results
-
Additional notes / sketches
-
Add drawing
-
112. Emergency Procedures e.g. business contingency plan
-
Additional notes / sketches
-
Add drawing
-
113. Security
-
114. SIA Licenses displayed by all security staff
-
Additional notes / sketches
-
Add drawing
-
115. SIA LDN criteria compiled with
-
Additional notes / sketches
-
Add drawing
-
116. SIA CCTV operative licence(s) held by relevant staff
-
Additional notes / sketches
-
Add drawing
-
117. CCTV control room (fit for purpose etc)
-
Additional notes / sketches
-
Add drawing
-
118. CCTV logs / forms (subject access request / release of images)
-
Additional notes / sketches
-
Add drawing
-
119. CCTV control room visitors log
-
Additional notes / sketches
-
Add drawing
-
120. CCTV warning signs
-
Additional notes / sketches
-
Add drawing
-
121. CCTV still images secured
-
Additional notes / sketches
-
Add drawing
-
122. CCTV image storage / access
-
Additional notes / sketches
-
Add drawing
-
123. CCTV system compliant to BS7958 and ICO C of P
-
Additional notes / sketches
-
Add drawing
-
124. Incident reports available and used
-
Additional notes / sketches
-
Add drawing
-
125. Europa emergency management plan on site
-
Additional notes / sketches
-
Add drawing
-
126. Daily occurrence book in place
-
Additional notes / sketches
-
Add drawing
-
127. Emergency procedures manual on site
-
Additional notes / sketches
-
Add drawing
-
128. Security risk assessments available and in date
-
Additional notes / sketches
-
Add drawing
-
129. Key management procedure
-
Additional notes / sketches
-
Add drawing
-
130. Booking on / off / check calls procedure (Timegate)
-
Additional notes / sketches
-
Add drawing
-
131. Europa ID cards
-
Additional notes / sketches
-
Add drawing
-
132. Assignment instructions (in date etc)
-
Additional notes / sketches
-
Add drawing
-
133. Shift pattern worked
-
Additional notes / sketches
-
Add drawing
-
134. Manning levels
-
Additional notes / sketches
-
Add drawing
-
135. Patrol pattern(s)
-
Additional notes / sketches
-
Add drawing
-
136. Access to security procedures
-
Additional notes / sketches
-
Add drawing
-
137. Access to training modules / toolbox talks
-
Additional notes / sketches
-
Add drawing
-
138. Europa security handbook on site
-
Additional notes / sketches
-
Add drawing
-
139. Supplied equipment maintained and used correctly e.g. radios, torches
-
Additional notes / sketches
-
Add drawing
-
140. Subcontract staff used
-
Additional notes / sketches
-
Add drawing
-
141. HR (head office)
-
142a. Training records maintained
-
Additional notes / sketches
-
Add drawing
-
142b. Security vetting records
-
Additional notes / sketches
-
Add drawing
-
142c. CRB check records
-
Additional notes / sketches
-
Add drawing
-
142d. Policies maintained
-
Additional notes / sketches
-
Add drawing
-
142e. Night worker health
-
Additional notes / sketches
-
Add drawing
-
143. Supply chain management procedures maintained
-
Additional notes / sketches
-
Add drawing
-
144. Finance purchase orders maintained
-
Additional notes / sketches
-
Add drawing
-
145. Data protection storage procedures compliant
-
Additional notes / sketches
-
Add drawing
-
146. PDP`s / appraisals for staff
-
Additional notes / sketches
-
Add drawing
-
147. Information Technology (business / offices)
-
148a. Server diagram updated
-
Additional notes / sketches
-
Add drawing
-
148b. Back up procedures maintained
-
Additional notes / sketches
-
Add drawing
-
148c. Equipment disposal records
-
Additional notes / sketches
-
Add drawing
3.0 Environment
-
149. Environmental Policy Statement
-
Additional notes / sketches
-
Add drawing
-
150. Environmental Manual
-
Additional notes / sketches
-
Add drawing
-
151. Aspects and Impacts Assessment
-
Additional notes / sketches
-
Add drawing
-
152. Waste Transfer Note
-
Additional notes / sketches
-
Add drawing
-
153. Hazardous Waste Consignment Note
-
Additional notes / sketches
-
Add drawing
-
154. Waste transfer notes retained (stored for 2 years)
-
Additional notes / sketches
-
Add drawing
-
155. Hazardous waste consignment notes retained (stored for 3 years)
-
Additional notes / sketches
-
Add drawing
-
156. Waste Management Plan
-
Additional notes / sketches
-
Add drawing
-
157. Waste duty of care visit<br>Annual
-
Additional notes / sketches
-
Add drawing
-
158. Corporate Social Responsibility and Sustainability report
-
Additional notes / sketches
-
Add drawing
-
159. Habitat Management Plan
-
Additional notes / sketches
-
Add drawing
-
160. Air conditioning certificate<br>5 yearly
-
Additional notes / sketches
-
Add drawing
-
161. Energy strategy
-
Additional notes / sketches
-
Add drawing
-
162. Air control emmisions
-
Additional notes / sketches
-
Add drawing
-
163. Spill kits
-
Additional notes / sketches
-
Add drawing
-
164. Display energy certificate<br>Annual
-
Additional notes / sketches
-
Add drawing
-
165. Carbon reduction commitment return submitted<br>Annual
-
Additional notes / sketches
-
Add drawing
-
166. Emergency procedures
-
Additional notes / sketches
-
Add drawing
Site Tour
-
Safety Observation
-
Location:
-
Safety Observation:
-
Additional notes / sketches
-
Add drawing