Information
-
Job ref:
-
Poster Distribution and Confirmation
-
Station
-
Confirm Location by GPS
1.0 - Details
-
Poster Details
Poster
-
Provide brief description of poster to be fitted
-
Confirm poster frame location and referance number (if applicable)
-
Take picture of frame before fitting poster
-
Poster Frame Condition?<br>
-
Describe the issue
-
Take picture of frame after fitting poster
2.0 - Works Completed
-
LS Engineer to complete (I confirm this poster(s) have been fitted and displayed)
-
Any other comments;
-
Client to complete (I confirm this poster(s) have been fitted and displayed)
-
Confirm date and time work(s) completed
-
LS Engineer Action
When completed send report to (insert email address).