Information
-
Log Book Review
-
Document no:
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel involved
-
Completion of the Site Log Book Review;
Reviews should be carried out periodically by Lorne Stewart Contract Management / Supervision.
Each section of the review should be rated "Satisfactory" or "Unsatisfactory" based on the following;
Satisfactory - all visits, work and documentation is up to date and present
Unsatisfactory - all visits, work and documentation is NOT up to date and present. -
1.0 - Section(s) Reviewed (add and complete as per log book sections)
Review
-
Section Number
-
Title
-
Is all documentation required up to date, available and if applicable as per planned or reactive work dates?
-
"Satisfactory"
Insert any comments as applicable below then proceed to next section. -
Add Photo(s) if required
-
"Unsatisfactory"
Provide details and summarise actions required below then proceed to next section. -
Add Photo(s) if required
-
2.0 - Reviewed by
Reviewer(s)
-
Review completed by (LS)
-
Add signature
-
Position
-
Additional Comments
-
Review completed by (Client)
-
Add signature
-
Position
-
Company
-
Additional Comments