Site Information

  • Document No.

  • Site

  • Client

  • Conducted on

  • Job No.

  • Engineer

  • Location
  • Time on site (hours)

  • Date of last service

  • Job Status

System

System

  • 1. Type of System

  • Evidence

  • If other please specify

  • Duration (hours)

  • 2. Inspection Type - BS5266-8 2004/BS 5265-1 2005

  • Duration

  • Colour Sticker Used

  • 3. Test Instrument Used

  • Instrument
  • Model

  • Serial No.

  • 4. Documentation (to be completed with client)

  • Log book completed and up to date?

  • Additional client paperwork completed?

  • Quote required?

  • 5. Recommendations/Comments

  • 6. Variations/Deviations

  • 7. Parts Used/Required

Checks

Checks

  • All references refer to BS5266-1

  • 4.2. P1 - Plans are available

  • 6. P2 - Under test conditions, adequate illumination provided for safe movement on the escape route and open areas

  • 6.3. P3 - Luminaires correctly positioned and orientated as shown on plan

  • 6.3. P4 - Original design still valid

  • 6.6. P5 - All escape route safety signs and fire fighting equipment location signs visible with normal lighting extinguished

  • 7.8. P6 - Correct application and siting of additional emergency lighting

  • 7.9. P7 - Luminaires conform to BS EN 60598-2-22

  • 7.9. P8 - Luminaires have appropriate ingress protection rating for their location as specified in system design

  • 9.1. P9 - Wiring systems comply with the requirements of BS 7671

  • 9.2. P10 - Fire protection of central wiring system satisfactory

  • 9.2.5. P11 - Emergency circuits correctly separated from other supplies

  • 9.2.12. P12 - Wiring to emergency lighting supply power sources, all plugs and sockets protected against unauthorised use

  • 9.3.3. P13 - System has a suitable test facility for the application

  • 9.3.5. P14 - Central power system output voltage range is compatible with supply voltage range of the Luminaires, taking into account voltage drop

  • 10.1. P15 - Luminaires tested and found to be appropriate for their full rated duration

  • 11.6. P16 - Operation and Maintenace

  • 12. P17 - Test records in the log book complete and satisfactory

  • 12.3. P18 - Instructions together with a suitable log book showing a satisfactory commissioning test available for use by the building occupier

  • 13. P19 - Luminaires clean and undamaged with lamps in good condition

  • 13. P20 - Building occupier and staff trained on suitable maintenance, testing and operation procedures or a current maintenance contract in place

  • 13.2. P21 - Evidence of servicing of Central Battery System (in line with manufacturers procedures); in-house or current maintenance contract in place

  • 13.3. P22 - Evidence of servicing Standby Generator System (in line with manufacturers procedures); in-house or current maintenance contract in place

  • 13.4. P23 - After test, charging indicators operate correctly

Declaration

Declaration

  • Client Declaration: All work has been carried out to my satisfaction

  • Signature:

  • Print Name:

  • Date:

  • SCCI Alphatrack Engineer(s) Declaration: I/We, being the competent person(s) for the servicing, certify that the above work complies to the best of my/our knowledge and belief with the recommendations of BS5839-1 2002 clause 45 and/or BS5266-1 / BS5266-8: 2004 section 7 with the exception of any variations and deviations.

  • Signature:

  • Print Name:

  • Date:

  • System:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.