Information

  • Document No. - ICE-ECD-058

  • Project Number -

  • Client / Site

  • Conducted on

  • Completed by -

  • Location
  • Personnel

RISK ASSESSMENTS

  • RISK ASSESSMENT TYPE?

RISK ASSESSMENT OBSERVATION

  • Is the risk assessment followed

  • Is the risk assessment adequate

  • Is the Risk Assessment understood?

  • Is the risk assessment available <br>

  • How would you do the task better?

  • What controls are required for the job you're doing?

TOOLS AND EQUIPMENT

  • Are the tools and equipment used in good condition

  • Are the tools and equipment used correctly

  • Do the tools and equipment used require calibrating

SYSTEMS AND PROCEDURES

  • Is a Permit to Work required for the task?

  • Please select permit type

ELECTRICAL

  • Does any plant or equipment require Isolation?

  • Is there a Lock Out / Tag Out procedure in place?

  • Have you Tested For Dead?

  • Are all electrical equipment inspected and tagged in date?

  • Are RCD's being used on all electrical equipment?

  • Are the extension cords elevated off the ground

  • Is all the documentation in place to proceed with the task?

  • Have you completed the documentation required to complete the task. Eg ITP's, ITS's, COC

EXCAVATIONS

  • Is there a requirement for excavation?

  • Has area been checked for existing services?

  • Is there an excavation permit in place?

  • Is the trench shored and battered correctly. Eg spoil 600mm from the trench, shoring after 1.2m

  • Is there safe access and egress in the trench?

  • Has the trenching area been segregated and bunted off and or covered to protect the public and wildlife at the end of each shift?

TRAINING AND COMPETENCIES

  • Have you completed the required ICE and site inductions?

  • Have you been trained and competent to complete the task?

  • Do you hold a certificate or ticket to operate the plant and equipment?

COMMUNICATION & CONSULTATION

  • Did you attend this mornings project Pre-Start meeting?

  • Can you name some of the site hazards that have been identified on site?

  • Was the weather conditions communicated at the mornings Pre-Start meeting?

  • Is there a risk that the Weather conditions may create a hazard while completing the task?

  • How often do you attend the site Toolbox meeting?

  • If so do you know any of the HSE topics that were discussed?

  • Have you had any input into the toolbox meetings in regard to HSE matters?

  • What are 3 of the main signs of Heat Stroke..?

  • Three warning signs to prevent Heat Stroke

HOUSEKEEPING

  • Is the work area clean and tidy

  • Is there efficient light in the work area?

  • Do you clean during and at the end of the shift?

INCIDENTS

  • Who would you contact first in the event that you or a workmate were injured?

  • Who do you report Near Misses too, and when?

  • Have you reported any hazards on the project in the last few weeks?

PPE

  • What is the PPE standard for all ICE employees on the projects in which they work?

  • Name 3 types of PPE that is ICE standard?

  • When using a grinder or cut off saw the ICE standard is to use double eye protection?

  • Are the Fall Arrest Harnesses inspected and tagged in date?

HAZARDOUS SUBSTANCES

  • Are any Hazardous Substances are required for the task you are doing?

  • Do you know where the hazardous substances cabinet is kept?

  • Have you reviewed the Safety Data Sheet?

  • Have you reviewed the Risk Assessment that accompanies the Hazardous Substance?

ENVIRONMENTAL ASPECTS

  • Have you identified any environmental issues that may cause a risk to the task?

  • Who do you report any Environmental Incidents too?

HAZARDS IDENTIFIED

APPROVAL SIGNATURE

  • HSE Manager Signature

  • Supervisor Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.