Information
-
Document No. - ICE-ECD-058
-
Project Number -
-
Client / Site
-
Conducted on
-
Completed by -
-
Location
-
Personnel
RISK ASSESSMENTS
-
RISK ASSESSMENT TYPE?
- JSEA
- SWMS
- TAKE 5
- PROJECT RISK ASSESSMENT
RISK ASSESSMENT OBSERVATION
-
Is the risk assessment followed
-
Is the risk assessment adequate
-
Is the Risk Assessment understood?
-
Is the risk assessment available <br>
-
How would you do the task better?
-
What controls are required for the job you're doing?
TOOLS AND EQUIPMENT
-
Are the tools and equipment used in good condition
-
Are the tools and equipment used correctly
-
Do the tools and equipment used require calibrating
SYSTEMS AND PROCEDURES
-
Is a Permit to Work required for the task?
-
Please select permit type
- Hot Work Permit
- Cold Work Permit
- Working at Heights Permit
- Confined Space Permit
- Electrical Work Permit
- Excavation Permit
ELECTRICAL
-
Does any plant or equipment require Isolation?
-
Is there a Lock Out / Tag Out procedure in place?
-
Have you Tested For Dead?
-
Are all electrical equipment inspected and tagged in date?
-
Are RCD's being used on all electrical equipment?
-
Are the extension cords elevated off the ground
-
Is all the documentation in place to proceed with the task?
-
Have you completed the documentation required to complete the task. Eg ITP's, ITS's, COC
EXCAVATIONS
-
Is there a requirement for excavation?
-
Has area been checked for existing services?
-
Is there an excavation permit in place?
-
Is the trench shored and battered correctly. Eg spoil 600mm from the trench, shoring after 1.2m
-
Is there safe access and egress in the trench?
-
Has the trenching area been segregated and bunted off and or covered to protect the public and wildlife at the end of each shift?
TRAINING AND COMPETENCIES
-
Have you completed the required ICE and site inductions?
-
Have you been trained and competent to complete the task?
-
Do you hold a certificate or ticket to operate the plant and equipment?
COMMUNICATION & CONSULTATION
-
Did you attend this mornings project Pre-Start meeting?
-
Can you name some of the site hazards that have been identified on site?
-
Was the weather conditions communicated at the mornings Pre-Start meeting?
-
Is there a risk that the Weather conditions may create a hazard while completing the task?
-
How often do you attend the site Toolbox meeting?
-
If so do you know any of the HSE topics that were discussed?
-
Have you had any input into the toolbox meetings in regard to HSE matters?
-
What are 3 of the main signs of Heat Stroke..?
-
Three warning signs to prevent Heat Stroke
- High body temperature
- Red, hot dry skin
- Rapid pulse
- Headaches
- Dizziness, confusion
- Nausea
HOUSEKEEPING
-
Is the work area clean and tidy
-
Is there efficient light in the work area?
-
Do you clean during and at the end of the shift?
INCIDENTS
-
Who would you contact first in the event that you or a workmate were injured?
-
Who do you report Near Misses too, and when?
-
Have you reported any hazards on the project in the last few weeks?
PPE
-
What is the PPE standard for all ICE employees on the projects in which they work?
-
Name 3 types of PPE that is ICE standard?
- Hard hat
- Safety Glasses
- High viz, long pants & sleeves
- Gloves
-
When using a grinder or cut off saw the ICE standard is to use double eye protection?
-
Are the Fall Arrest Harnesses inspected and tagged in date?
HAZARDOUS SUBSTANCES
-
Are any Hazardous Substances are required for the task you are doing?
-
Do you know where the hazardous substances cabinet is kept?
-
Have you reviewed the Safety Data Sheet?
-
Have you reviewed the Risk Assessment that accompanies the Hazardous Substance?
ENVIRONMENTAL ASPECTS
-
Have you identified any environmental issues that may cause a risk to the task?
-
Who do you report any Environmental Incidents too?
HAZARDS IDENTIFIED
APPROVAL SIGNATURE
-
-
HSE Manager Signature
-
Supervisor Signature