Title Page
-
Job # - Name:
-
Room Name:
-
Conducted on:
-
Location:
-
Certified by:
-
All Immedia provided hardware installed.
-
All OFE hardware installed, make/model documented in PG.
-
All devices powered on
-
All physical connections complete: - PG redlines completed - Confirm link of all devices on client network - Video/audio signal flow tested - Manually route all inputs to all outputs on video distribution. - Speaker taps confirmed, tone speakers/use pink noise generator.
-
iPad(s) setup: - Configured with client iTunes info - Relevant apps installed (Crestron, Zoom rooms) - Charging sleeves and docks installed and tested
-
Amplifier settings: - Gain knobs set to 100% - Filter set to full range - Mode set for application, 70v/loZ
-
Pair wireless mics, set frequencies using Shure online tool
-
Label all accessories: - Mics - Keyboards - Mice - Remotes
-
Display devices setup: - Projector(s) aimed - Aspect set - Display menu options set/features enabled
-
Verify screen/lift power and relay control