IMS 01. General site appearance and condition. Applicable to all projects.
-
Alert 1. Site appearance and layout- gut feeling- does it look and feel right .
-
Alert 2 . Do we have adequate arrangements for evacuation of project in a emergency
-
Alert 3. Housekeeping is maintained to a high standard in all radiators.
-
Alert 4. Are there safe clearly marked pedestrian walkwys
-
Alert 5. Temporary cables,hoses & pipes are been managed to avoid creating trip hazards.
-
Alert 6. All storage areas (including materials and waste) defined ,clear,tidy and well managed
-
Alert 7. Suitable lighting has been installed & maintained to appropriate internal & external areas.
-
Alert 8. Suitable welfare facilities including canteen,toilets,drying rooms,showers are provided and maintained for male&female workers
-
Alert 9. Have daily inspections been undertaken of external boundary . Is hoarding in good condition,appropriate signage in place (e.g Ccs emergency contacts boards),and the impact of construction traffic well managed(I,e mud on roads/ subcontractor parking)
-
Comments
-
IMS 02. Supervision ,competence and induction . Applicable to all projects.
-
Alert 10. All inductions relevant to works carried out on site, environmental issues covered and is the project lead completing part of induction .
-
Alert 11. Do managers have the correct skill set to direct and guide contractors in production,health and safety environment and quality ? (Sample check required)
-
Alert 12. Are supervisors clearly fulfilling there role and controlling health and safety,environment and quality risk of workforce ( sample check required)
-
Alert 13. Do operatives have correct competency for task they are under taking and are working in a safe manner( sample check required )
-
Alert 14. Have operatives been briefed in the safe system of work and are working to it ( sample check required)
-
Alert 15. Have operatives received an effective start right brief prior to commencing work (sample check required )
-
Comments
-
IMS 03. Environment . Applicable to all projects.
-
Alert 16. Have project specific environmental targets ( e.g client requirements /BREEAM & code for sustainable homes) have been implemented and are clearly understood and recorded on site(e.g site energy/ water reduction.
-
Alert 17. Are measures in place to prevent an environmental incident occurring ( e.g during refuelling ,concrete washout,containment of invasive plant species .
-
Alert 18. Are measures in place to prevent unlawful discharge of pollutants into water course or drainage system.
-
Alert19. Is all waste segregated appropriately with Wates' colour coded signs displayed on containers.
-
Alert 20. Have noisy activities been identified and steps under taken to minimise/manage impact(including liaison with local neighbours / local authority EHO).
-
Comments.
-
IMS 04. Quality management . Applicable to all projects.
-
Alert 22. Have sufficient meaningful defect avoidance / RFT discussions (manufacturer's expertise / interface mtg /DTM / customer care consultation /pre-start inspections)taken place?.
-
Alert 23. Have materials & the standard of workmanship been approved ( technical submittal, benchmark sample,etc)and or mock-up completed to ensure customer requirements will be met?
-
Alert 24. Do operatives understand their quality risks and avoiding defects?
-
Alert 25. Are elements constructed and completed (inc. snagging by S/C) appropriately ,to standards (e.g. Fire, structural ) manufactures' recommendations and best practice prior to commencement of subsequent works?
-
Alert 26. Have works been inspected / tested in accordance with building regulations ,the specification and best practice and are records( photos,record drawings,etc adequate to prove compliance .
-
Alert 27. Has non conforming works been recorded with S/C and remedial actin approved by designer / client as required .is close out timely? Is the S/C taking action to prevent reoccurrence (e.g toolbox talk ,TQP update & re-brief )?
-
Alert 28 are customers handover requirements identified ,agreed and monitored ? How is work progressing to achieve the promised deliverables?
-
Comments
-
IMS 05. Workplace transport / pedestrian segregation. Applicable to all projects.
-
Alert 29. A competent traffic management co-ordinator has been appointed by the project leader and understands their responsibilities
-
Alert 30. Safe,clearly marked segregated pedestrian walkways are in place.
-
Alert 31. Banksmen and gatemen are aware of responsibilities and have been briefed .
-
Alert 32. Mobile elevating work platforms (MEWPs) scissor lifts cherry pickers are operated by competent person.
-
Comment .
-
IMS 06. Public protection . Applicable to all projects.
-
Alert 33. Are members of the public protected from works.
-
Alert 34. Are members of the public protected from vehicle movement / loading/unloading in public areas.
-
Alert 35. Where required secure access gates are fitted ,well maintained, can be secured in both open and closed positions.
-
Alert 36. Exclusion zones have been established for any works out side perimeter boundary .
-
Alert 37. Consideration has been given for vulnerable people impacted by the works,consider young ,elderly and disabled.
-
Alert 38. Protection in any public areas is checked on a daily basis & maintained.
-
Alert 39. Controls are in place to isolate works from public in occupied property's (e.g houses,live stores or office environments )consider adjacent foot paths and right of
-
Comments.
-
IMS 07. Buried services. If Applicable ?
-
Alert 40. A buried service co-ordinator has been appointed by project leader who has arranged for appropriate surveys and provide relevant information regarding risks to contractors.
-
Comment.
-
IMS 08. Excavations & Groundworks. If applicable?
-
Alert 41. Excavations & trenches have been suitably protected to prevent collapse ; falls of material & people and have a safe access in and around excavations.
-
Comments.
-
IMS 09. Cranes,hoists,lifting equipment&accessories If Applicable ?
-
Alert 42. A competent lifting co-ordinator /appointed person has been selected by project leader who is controlling lifting operations via suitable risk assessment and plans of work - sample checks recorded weekly inspection ;in-date thRough examination certificates.
-
Alert 43. Passenger & goods hoists / mast climber installation designs has been checked by an engineer independent of the original designer( base &tie details).
-
Comments.
-
IMS 10. Temporary works & false works. If applicable ?
-
Alert 44. A temporary works co-ordinator has been appointed in writing by the project leader and is conducting his duties fully.
-
Alert 45. Temporary works & false works have been designed by a competent person & checked by a independent / Wates structural engineer and inspected in line with Wates 3 stage permits system.
-
Comments.
-
IMS 11. Demolition. If applicable?
-
Alert 46. Demolition activities are adequately supervised at all times.
-
Alert 47. Demolition method statement(s) have been approved by a health and safety and environmental advisor.
-
Alert 48. Demolition contractor's supervisor(s)and operatives hold a CCDO demolition supervisor (gold) cards and CCDO operative's card respectively.
-
Alert 49. The sequence of demolition for structural works have been checked by a temporary works engineer.
-
Alert 50. Environmental controls are in place i.e noise, dust suppression .
-
Comment.
-
IMS 12. Electricity If applicable?
-
Alert 51. A competent person(duty holder) has been appointed to supervise access to switch rooms, etc ,to authorise person to work in switch rooms,etc and operate a permit to work system.
-
Alert 52. Access to switch. Rooms,electrical cabinets, electrical rises & distribution boards is restricted to authorise people under a permit to work - when unoccupied doors remain lock with warning signs in place.
-
Alert 53. Temporary electrical systems & all electrical tools have under gone a thorough examination within the last 3 months.
-
Alert 54. Live testing and commissioning risks have been identified .
-
Comments.
-
IMS 13. Driver operated plant ( excavators,dumpers,etc.) if applicable ?
-
Alert 55. Plant operators can demonstrate understanding the safe operating procedures, unattended protocol, refuelling requirements, safety alerts etc.(sample check required)
-
Alert 56. Plant has undergone inspection in the last seven days inline with manufactures recommendations and has an in date thorough examination certificate.
-
Alert 57. Select a item of plant and conduct a spot check.
-
Alert 58. A flashing beacon / roll over protection / falling object protection is fitted to relevant plant in use.
-
Alert 59. Operators (where required) have been trained in quick hitch inspection ,maintenance & use.
-
Alert 60. Appropriate refuelling / maintenance areas are away from drains / watercourses and spill kits are available .
-
Comments.
-
IMS 14. Working at heights & scaffolding. If applicable ?
-
Alert 61. A scaffolding co-ordinator has been appointed by project leader.
-
Alert 62. Edges,openings and holes are robustly protected and inspected to prevent materials and people falling.
-
Alert 63. Are suitable controls in place to manage and prevent dropped objects during erection,use and dismantling of scaffolds and working platforms.
-
Alert 64. High levels of housekeeping are maintained on scaffolding / working at height platforms - no loose materials
-
Alert 65. Safe access between levels is maintained by proprietary staircases such as hakki system in preference to ladders.
-
Alert 66. Persons required to use safety harnesses / fall arrest equipment have Been trained, records of inspection of safety equipment are in place and maintained - sample.
-
Alert 67. Fragile roofs, roof lights and fragile areas of roof are adequately protected and identified with pictorial warning signs
-
Alert 68. Ladder access openings are protected by gate or hatch.
-
Alert 69. Fragile roofs, fragile roof-lights and fragile roofs are identified with signs,protected and inspected.
-
Comment.
-
IMS 15. Low level access. If applicable ?
-
Alert 70. Low level access equipment is in good order used by a competent person.
-
Comment.
-
IMS 16. Mast climbing work platforms (MCWP's) & cradles. If applicable?
-
Alert 71. Confirmation from installer that mast climbing work platforms MCWP'S & cradles have been installed in accordance with manufacturers instructions are operated by competent person inspected weekly and been thoroughly at 6 monthly intervals .
-
Alert 72. Third party's are adequately protected during erection,use & dismantling with exclusion zones established.
-
Alert 73. Safe access to mast & cradle had been established and maintained.
-
Comments.
-
IMS H 01 health management. Applicable ?
-
Alert 74. An asbestos co-ordinator has been appointed by project leader.
-
Alert 75. A suitable & sufficient survey to locate asbestos containing materials has been carried out and information briefed to those who need it.
-
Alert 76. Relevant site workers have undergone asbestos awareness training .
-
Alert 77. Have steps been taken to reduce manual handling.
-
Alert 78. Dust producing activities have been identified and control measures such as vacuum system/ suppression put in place.
-
Alert 79. Have steps been taken to reduce the affects of hand arm vibration (HAV's).
-
Alert 80. Uses of hazardous substances (COSHH) are aware of safe use and correct storage.
-
Alert 81. When observing noisy operations are you confident that the noise is been adequately managed.
-
Comment.