Information

  • Job Number

  • Job Name

  • Client / Site

  • Room Designation

  • Conducted on

  • Prepared by

  • Location

IHL STAGING

IHL-STAGING

STAGING

  • Record all equipment not present and why.

  • All displays have been burned in with both color bars and white field on every input

  • Capture EDID tables for all display devices and document in the job folder

  • Test dedicated on-board display audio

  • Test USB connectivity for all interactive display devices

  • Install projector lenses

  • Assemble all wall plates (eg Extron AAP/MAAP)

  • Assemble all power and side brackets in cable cubbies

  • Label all individual boxes with Job Number, Account Name and Room Designation

  • Record serial numbers and equipment locations in D-Tools

  • Tune wireless microphones to correct frequencies based on zip code search

  • Label all wireless microphones based on job drawings ( transmitter, receiver and pouch.

  • Document wireless frequencies and job zip code in the job folder

  • Check received quantities with pull sheets and inform the PM in writing if there are discrepancies

RACK ASSEMBLY AND TESTING

  • All cables are clearly labeled on both ends

  • All terminations are stress free

  • Check for kinks in wiring or bend radius problems

  • All connectors are installed properly and according to standards

  • All connections can be reached from the rear of the rack

  • Lacing bars are spaced to allow hand entry into rack

  • Wire ties are not over tightened and there are no more than 4 per lacing bar

  • All wire ties are flush cut and have no jagged edges

  • Signal types are separated

  • Screw terminals have spade lugs on wires

  • All equipment can be pulled for repairs or replacement easily

  • Non IEC power cords are not tied down in rack

  • Install low voltage power supplies in rack according to the job drawings

  • Inspect rack for dirt and damage

  • Damage is reported to PM in writing if found

  • Rack is cleaned if dirt is found

  • Apply temporary rack labels Job Number/Client/Building/Room

  • Power all rack devices and check for DOA equipment

  • If DOA equipment is found, notify PM in writing and begin RMA process

  • Box all manuals and remotes and stage with rack

  • Complete mark ups of drawings for all in house work completed

  • Highlight all field wiring that needs to be completed

  • Print marked up drawings and stage with rack

  • By signing, I agree that I have completed the above tasks to the best of my ability and as completely as possible for the job at hand. I have reported any issues or incomplete tasks to the Project Manager or appropriate person internally.

IHL COMMISIONING

IHL COMMISSIONING

IN-HOUSE CONFIGURATION AND COMMISSIONING

  • Update firmware on all devices ( eg. Scaler, TPI, Display)

  • Configure IP Table for all devices and record in IT Provisioning Sheet in job folder. (See PM for details)

  • Load DSP file onto audio processor

  • Configure instance IDs for Control/DSP volume controls

  • Confirm transmitter/ receiver signal flow

  • Test rack wiring and signal flow

  • Test all possible control and video functions

  • Test all playback, record audio and program audio

  • Test all GUI page flips, button presses, feedback and video routing

  • Test VOIP DSP capability

  • Is there VTC in the system?

IN- HOUSE CONFIGURATION VIDEO CONFERENCING

  • Pre-configure codec if possible ( IP and ISDN information)

  • Per-configure and test web conferencing components if possible

  • Test camera outputs and video feeds

  • Perform test calls

  • Test content sharing

  • All equipment has been repackaged and returned to it's original location in the warehouse.

  • All updated code for control or DSP has been uploaded to the server

  • By signing, I agree that I have completed the above tasks to the best of my ability and as completely as possible for the job at hand. I have reported any issues or incomplete tasks to the Project Manager or appropriate person internally.

OSL INSPECTION

OSL INSPECTION

GENERAL SYSTEM TESTING

  • No jagged edges or sharp edges accessible to users

  • All cabling is labeled

  • All cabling is supported by lacing bars

  • Cables have adequate bend radius

  • Tie wraps not too tight and cut flush

  • Signal separation verified

  • Confirm cables are unstressed

  • Confirm serviceability of equipment

  • Displays have On Screen Display set to off or to user preference

  • Turn off OPC or automatic brightness adjustment settings on displays

  • Set energy management on displays off or to user preference

  • Confirm audio settings on display for installed audio devices.

  • All raw wiring has been tested

  • All exposed raw cabling is socked and finished

  • Test all speaker wiring for shorts and polarity

  • Patch bays are configured with outputs on top and inputs on the bottom

  • All wall openings are covered and finished

  • All displays are wiped clean of handprints, dust and debris

  • Ceiling tiles are all back in place

  • Room floors, walls and furniture are all clean

  • All installed devices are level and plumb

  • Racks are properly vented and have sufficient air flow

  • All drawings are marked up in RED

  • All marked up drawings are returned to the Job Book

  • Leave remotes on site and record location

  • Remove all trash and unneeded installation materials

  • Remove all paper manuals

  • Is there a projector in the system

  • Projector test image fills screen and is not keystoned

  • Projector aspect ratio setting for all inputs is set to fill the screen

  • Projector aspect ratio setting matches screen aspect ratio

  • Projector is not swaying or vibrating

  • Screen limits are set to drawing specifications or 48" to viewable surface from floor

  • Screen fabric moves freely with no rubbing or sticking of fabric

  • Is there a lift in the system

  • Lift closes evenly and squarely

  • Lift opens and closes freely with no rubbing or binding

  • Lift limits allow projection to be displayed properly and lift closes properly

  • Lift is not vibrating or swaying

  • Is there a flat panel in the system

  • Align and size images on flat panel displays

  • 1920 x 1080

  • 1280 x 800

  • 1280 x 720

  • 1024 x 768

  • Any other resolution supported based on the EDID table

  • Match resolution with main display native wherever possible

  • Test all playback devices

  • Test all input plates and table connections

  • Manually test all video sources to all destinations

  • Manually test all video recording devices

  • White balance all displays

  • Color adjust all displays

  • White balance all cameras

  • Set EDID minders to native of connected device or codec

  • Set scalers to native resolution of device connected to its output

  • Confirm scalers are set to auto image an input signal

  • Test all inputs with multiple resolutions

  • Record ambient light issues

  • Record all missing or not installed equipment and reason why it was not installed

  • By signing, I agree that I have completed the above tasks to the best of my ability and as completely as possible for the job at hand. I have reported any issues or incomplete tasks to the Project Manager or appropriate person internally.

SC AUDIO

SYSTEM COMMISSIONING AUDIO

AUDIO SYSTEM TESTING

  • Test all speaker zones separately

  • Record impedance @ 1 kHz for each zone

  • Confirm wireless microphones are tuned to the correct frequencies based on zip code

  • Test all wireless microphone inputs separately

  • Test all wired microphone inputs separately

  • Test all input/ output plates and table connections

  • Mics are configured for 0 dBu at 67 dBSPL unweighted spoken word

  • Manually switch all audio sources to all destinations

  • Match all audio input sources audio gain

  • Match all microphone sources input gain

  • Match all line output gain levels at 0 dBu

  • Manually test all playback/program audio

  • Manually test audio recording device

  • Back up DSP programs on server

  • Measure and record output SPL for reinforced speech

  • Measure and record output SPL for program audio

  • Measure and record SPL of ambient noise

  • Measure and record Total Harmonic Distortion if required

AUDIO/CONTROL

  • Test program volume control

  • Test audio conference volume control

  • Test VTC volume control

  • Set time and date on DSP processor

  • Switch all audio inputs to all audio outputs using control system

  • Test all presets

  • Power system down and confirm power up preset loads on power up

  • Test control of audio recording devices

  • Confirm instance IDs with control system

  • Is there ATC in the system?

AUDIO CONFERENCING AUDIO

  • Match gain for wired, wireless, table and ceiling microphones

  • Test call to local client, IMS office and bridge call if possible

  • Test program audio feeds during test call

  • Test privacy function during test calls

  • Document POTS line voltage and amperes

  • Document phone number and type of line

  • Document HVAC or ambient noise level issues

  • Is there VTC in the system?

VIDEO CONFERENCING AUDIO

  • Match gain for wired, wireless, table and ceiling microphones

  • Test call to local client, IMS office and bridge call if possible

  • Test program audio feeds during test call

  • Test privacy function during test call document HVAC or ambient noise level issues,

  • Document HVAC or ambient noise level issues

  • By signing, I agree that I have completed the above tasks to the best of my ability and as completely as possible for the job at hand. I have reported any issues or incomplete tasks to the Project Manager or appropriate person internally.

SC CONTROL

SYSTEM COMMISSIONING CONTROL

Interface control system testing

  • Confirm all firmware is updated

  • Confirm control of all devices

  • Were there any control termination issues

  • List connection termination issues with corrected pinouts

  • Set time and date for control system

  • Confirm all touch panel or keypad buttons are responding properly ( Feedback)

  • Confirm all touch panel or keypad buttons are performing properly ( Functionality)

  • Confirm all touch panel Tech Pages are hidden and press and hold

  • Confirm all page flips are working properly

  • Confirm all subpages are displaying properly

  • Confirm touch panel works wirelessly throughout the necessary area

  • Record wireless signal strength at farthest operating point touch panel works wired or wireless

  • Touch panel works when wireless or docked

  • Record all IP addresses on IP Provisioning Sheet

  • Rack power strip turning off and on properly

  • Confirm correct devices are being powered down on shutdown

  • Confirm correct devices are being powered up on start up

  • Test on/off commands for all devices

  • Confirm microphone LEDs are working properly for commands

  • Touch panel cool down is matched to the display's cool down time

  • Lift timing set to match the display's cool down finish

  • Final version of code has been uploaded to the server

Remote Control System Testing

  • Confirm eControl and xPanel functionality is in line with all other control areas on this list

  • What type of remote monitoring is being used?

  • Confirm Fusion feedback is active and reporting properly

  • Confirm Fusion configuration sheet is complete

  • List join numbers outside of the default structure

  • Confirm RoomView feedback is active and reporting properly

  • Confirm RoomView Express configuration sheet is complete

Display Control System Testing

  • Test every input selection

  • Confirm display aspect ratio is set to customer requirements

  • Confirm the display selects the proper input during boot up from each possible incorrect input

  • Confirm displays turn on and off properly via control system

Environmental Control System Testing

  • Confirm screen control up, down and stop

  • Confirm lift control up, down and service mode

  • Confirm blackout shades control up, down and stop

  • Confirm sun shades control up, down and stop

  • Confirm control of lighting scenes and zones

  • Confirm control of lighting presets

  • Confirm HVAC control is functioning

  • Confirm occupancy sensors are working to specifications

  • Confirm light sensors are working to specifications

  • Is there streaming or recording in the system

Recording/Streaming Control System Testing

  • Confirm recording/ streaming devices are powering on and off properly

  • Confirm recording/ streaming devices are functioning properly

  • Confirm all source inputs are recording/ streaming properly

  • Confirm all cameras inputs are recording/ streaming properly

  • Is there VTC in the system?

VTC Control System Testing

  • Test all aspects of camera control ( PTZ, Focus,Presets,Power)

  • Test all menu navigation functions

  • Test all dialing functions ( manual, address book, speed dial, favorites)

  • Perform VTC test calls using the control system

  • Test all sources through content using the control system

  • Confirm source audio works locally while in VTC call

  • Confirm all audio sources pass through VTC properly

  • By signing, I agree that I have completed the above tasks to the best of my ability and as completely as possible for the job at hand. I have reported any issues or incomplete tasks to the Project Manager or appropriate person internally.

SC VTC

VTC Commissioning

  • Record codec model number

  • Record codec serial number

  • Record customer Log in and password

  • Is there a license key to unlock options

  • Record software key

  • Save the system profile and load it onto server

  • How many monitors are in the system?

  • Monitors
  • Output resolution

  • Record output resolution

  • Output Format

  • How many cameras are in the system

  • Camera
  • Aspect ratio

  • Format

  • Backlight compensation

  • Is this the content camera?

  • Codec Manufacturer?

Generic Codec

  • Record manufacturer and model number of codec

  • Codec connectivity is...

ISDN

  • Select switch type

  • Record switch type

  • Record SPID numbers

  • Record ISDN numbers

IP

  • Record IP Address

  • Record Subnet Mask

  • Record Default Gateway

  • Record any pertinent information. (NAT or Gateway setting etc.)

SIP

  • Record URI

  • Default Transport

  • TLS Verify enabled?

  • Record Proxy Type

  • Record Proxy Address

  • Record Login Name

  • Is Password enabled

  • Record Password

  • Profile choice

  • SIP Registrar Server

Cisco

  • Codec connectivity is...

ISDN

  • Select switch type

  • Record switch type

  • Record SPID numbers

  • Record ISDN numbers

IP

  • Record IP Address

  • Record Subnet Mask

  • Record Default Gateway

SIP

  • Record Authentication Login Name

  • Is Password enabled

  • Record Authentication Password

  • Default Transport

  • TLS Verify enabled?

  • Record Proxy Address

  • Proxy Discovery

  • SIP Profile

  • Record SIP URI

Lifesize

  • Codec connectivity is...

ISDN

  • Select switch type

  • Record switch type

  • Record SPID numbers

  • Record ISDN numbers

IP

  • Record IP Address

  • Record Subnet Mask

  • Record Default Gateway

SIP

  • SIP Server

  • User Name

  • Is Password enabled

  • Record Password

  • Default Transport

  • TLS Server Validate

  • Proxy Server

  • Record Proxy Port Number

  • Server Type

  • SIP Registrar Server

  • Record IP and Port information

Polycom

  • Codec connectivity is...

ISDN

  • Select switch type

  • Record switch type

  • Record SPID numbers

  • Record ISDN numbers

IP

  • Record IP Address

  • Record Subnet Mask

  • Record Default Gateway

SIP

  • Record URI

  • Transport Protocol

  • TLS Verify enabled?

  • Record Login Name

  • Record Domain User Name

  • Is Password enabled

  • Record Password

  • Record SIP Registrar Server

  • Record Proxy Server

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.