Information
-
Job Number
-
Job Name
-
Client / Site
-
Room Designation
-
Conducted on
-
Prepared by
-
Location
IHL STAGING
IHL-STAGING
STAGING
-
Record all equipment not present and why.
-
All displays have been burned in with both color bars and white field on every input
-
Capture EDID tables for all display devices and document in the job folder
-
Test dedicated on-board display audio
-
Test USB connectivity for all interactive display devices
-
Install projector lenses
-
Assemble all wall plates (eg Extron AAP/MAAP)
-
Assemble all power and side brackets in cable cubbies
-
Label all individual boxes with Job Number, Account Name and Room Designation
-
Record serial numbers and equipment locations in D-Tools
-
Tune wireless microphones to correct frequencies based on zip code search
-
Label all wireless microphones based on job drawings ( transmitter, receiver and pouch.
-
Document wireless frequencies and job zip code in the job folder
-
Check received quantities with pull sheets and inform the PM in writing if there are discrepancies
RACK ASSEMBLY AND TESTING
-
All cables are clearly labeled on both ends
-
All terminations are stress free
-
Check for kinks in wiring or bend radius problems
-
All connectors are installed properly and according to standards
-
All connections can be reached from the rear of the rack
-
Lacing bars are spaced to allow hand entry into rack
-
Wire ties are not over tightened and there are no more than 4 per lacing bar
-
All wire ties are flush cut and have no jagged edges
-
Signal types are separated
-
Screw terminals have spade lugs on wires
-
All equipment can be pulled for repairs or replacement easily
-
Non IEC power cords are not tied down in rack
-
Install low voltage power supplies in rack according to the job drawings
-
Inspect rack for dirt and damage
-
Damage is reported to PM in writing if found
-
Rack is cleaned if dirt is found
-
Apply temporary rack labels Job Number/Client/Building/Room
-
Power all rack devices and check for DOA equipment
-
If DOA equipment is found, notify PM in writing and begin RMA process
-
Box all manuals and remotes and stage with rack
-
Complete mark ups of drawings for all in house work completed
-
Highlight all field wiring that needs to be completed
-
Print marked up drawings and stage with rack
-
By signing, I agree that I have completed the above tasks to the best of my ability and as completely as possible for the job at hand. I have reported any issues or incomplete tasks to the Project Manager or appropriate person internally.
IHL COMMISIONING
IHL COMMISSIONING
IN-HOUSE CONFIGURATION AND COMMISSIONING
-
Update firmware on all devices ( eg. Scaler, TPI, Display)
-
Configure IP Table for all devices and record in IT Provisioning Sheet in job folder. (See PM for details)
-
Load DSP file onto audio processor
-
Configure instance IDs for Control/DSP volume controls
-
Confirm transmitter/ receiver signal flow
-
Test rack wiring and signal flow
-
Test all possible control and video functions
-
Test all playback, record audio and program audio
-
Test all GUI page flips, button presses, feedback and video routing
-
Test VOIP DSP capability
-
Is there VTC in the system?
IN- HOUSE CONFIGURATION VIDEO CONFERENCING
-
Pre-configure codec if possible ( IP and ISDN information)
-
Per-configure and test web conferencing components if possible
-
Test camera outputs and video feeds
-
Perform test calls
-
Test content sharing
-
All equipment has been repackaged and returned to it's original location in the warehouse.
-
All updated code for control or DSP has been uploaded to the server
-
By signing, I agree that I have completed the above tasks to the best of my ability and as completely as possible for the job at hand. I have reported any issues or incomplete tasks to the Project Manager or appropriate person internally.
OSL INSPECTION
OSL INSPECTION
GENERAL SYSTEM TESTING
-
No jagged edges or sharp edges accessible to users
-
All cabling is labeled
-
All cabling is supported by lacing bars
-
Cables have adequate bend radius
-
Tie wraps not too tight and cut flush
-
Signal separation verified
-
Confirm cables are unstressed
-
Confirm serviceability of equipment
-
Displays have On Screen Display set to off or to user preference
-
Turn off OPC or automatic brightness adjustment settings on displays
-
Set energy management on displays off or to user preference
-
Confirm audio settings on display for installed audio devices.
-
All raw wiring has been tested
-
All exposed raw cabling is socked and finished
-
Test all speaker wiring for shorts and polarity
-
Patch bays are configured with outputs on top and inputs on the bottom
-
All wall openings are covered and finished
-
All displays are wiped clean of handprints, dust and debris
-
Ceiling tiles are all back in place
-
Room floors, walls and furniture are all clean
-
All installed devices are level and plumb
-
Racks are properly vented and have sufficient air flow
-
All drawings are marked up in RED
-
All marked up drawings are returned to the Job Book
-
Leave remotes on site and record location
-
Remove all trash and unneeded installation materials
-
Remove all paper manuals
-
Is there a projector in the system
-
Projector test image fills screen and is not keystoned
-
Projector aspect ratio setting for all inputs is set to fill the screen
-
Projector aspect ratio setting matches screen aspect ratio
-
Projector is not swaying or vibrating
-
Screen limits are set to drawing specifications or 48" to viewable surface from floor
-
Screen fabric moves freely with no rubbing or sticking of fabric
-
Is there a lift in the system
-
Lift closes evenly and squarely
-
Lift opens and closes freely with no rubbing or binding
-
Lift limits allow projection to be displayed properly and lift closes properly
-
Lift is not vibrating or swaying
-
Is there a flat panel in the system
-
Align and size images on flat panel displays
-
1920 x 1080
-
1280 x 800
-
1280 x 720
-
1024 x 768
-
Any other resolution supported based on the EDID table
-
Match resolution with main display native wherever possible
-
Test all playback devices
-
Test all input plates and table connections
-
Manually test all video sources to all destinations
-
Manually test all video recording devices
-
White balance all displays
-
Color adjust all displays
-
White balance all cameras
-
Set EDID minders to native of connected device or codec
-
Set scalers to native resolution of device connected to its output
-
Confirm scalers are set to auto image an input signal
-
Test all inputs with multiple resolutions
-
Record ambient light issues
-
Record all missing or not installed equipment and reason why it was not installed
-
By signing, I agree that I have completed the above tasks to the best of my ability and as completely as possible for the job at hand. I have reported any issues or incomplete tasks to the Project Manager or appropriate person internally.
SC AUDIO
SYSTEM COMMISSIONING AUDIO
AUDIO SYSTEM TESTING
-
Test all speaker zones separately
-
Record impedance @ 1 kHz for each zone
-
Confirm wireless microphones are tuned to the correct frequencies based on zip code
-
Test all wireless microphone inputs separately
-
Test all wired microphone inputs separately
-
Test all input/ output plates and table connections
-
Mics are configured for 0 dBu at 67 dBSPL unweighted spoken word
-
Manually switch all audio sources to all destinations
-
Match all audio input sources audio gain
-
Match all microphone sources input gain
-
Match all line output gain levels at 0 dBu
-
Manually test all playback/program audio
-
Manually test audio recording device
-
Back up DSP programs on server
-
Measure and record output SPL for reinforced speech
-
Measure and record output SPL for program audio
-
Measure and record SPL of ambient noise
-
Measure and record Total Harmonic Distortion if required
AUDIO/CONTROL
-
Test program volume control
-
Test audio conference volume control
-
Test VTC volume control
-
Set time and date on DSP processor
-
Switch all audio inputs to all audio outputs using control system
-
Test all presets
-
Power system down and confirm power up preset loads on power up
-
Test control of audio recording devices
-
Confirm instance IDs with control system
-
Is there ATC in the system?
AUDIO CONFERENCING AUDIO
-
Match gain for wired, wireless, table and ceiling microphones
-
Test call to local client, IMS office and bridge call if possible
-
Test program audio feeds during test call
-
Test privacy function during test calls
-
Document POTS line voltage and amperes
-
Document phone number and type of line
-
Document HVAC or ambient noise level issues
-
Is there VTC in the system?
VIDEO CONFERENCING AUDIO
-
Match gain for wired, wireless, table and ceiling microphones
-
Test call to local client, IMS office and bridge call if possible
-
Test program audio feeds during test call
-
Test privacy function during test call document HVAC or ambient noise level issues,
-
Document HVAC or ambient noise level issues
-
By signing, I agree that I have completed the above tasks to the best of my ability and as completely as possible for the job at hand. I have reported any issues or incomplete tasks to the Project Manager or appropriate person internally.
SC CONTROL
SYSTEM COMMISSIONING CONTROL
Interface control system testing
-
Confirm all firmware is updated
-
Confirm control of all devices
-
Were there any control termination issues
-
List connection termination issues with corrected pinouts
-
Set time and date for control system
-
Confirm all touch panel or keypad buttons are responding properly ( Feedback)
-
Confirm all touch panel or keypad buttons are performing properly ( Functionality)
-
Confirm all touch panel Tech Pages are hidden and press and hold
-
Confirm all page flips are working properly
-
Confirm all subpages are displaying properly
-
Confirm touch panel works wirelessly throughout the necessary area
-
Record wireless signal strength at farthest operating point touch panel works wired or wireless
-
Touch panel works when wireless or docked
-
Record all IP addresses on IP Provisioning Sheet
-
Rack power strip turning off and on properly
-
Confirm correct devices are being powered down on shutdown
-
Confirm correct devices are being powered up on start up
-
Test on/off commands for all devices
-
Confirm microphone LEDs are working properly for commands
-
Touch panel cool down is matched to the display's cool down time
-
Lift timing set to match the display's cool down finish
-
Final version of code has been uploaded to the server
Remote Control System Testing
-
Confirm eControl and xPanel functionality is in line with all other control areas on this list
-
What type of remote monitoring is being used?
- RoomView
- Fusion
-
Confirm Fusion feedback is active and reporting properly
-
Confirm Fusion configuration sheet is complete
-
List join numbers outside of the default structure
-
Confirm RoomView feedback is active and reporting properly
-
Confirm RoomView Express configuration sheet is complete
Display Control System Testing
-
Test every input selection
-
Confirm display aspect ratio is set to customer requirements
-
Confirm the display selects the proper input during boot up from each possible incorrect input
-
Confirm displays turn on and off properly via control system
Environmental Control System Testing
-
Confirm screen control up, down and stop
-
Confirm lift control up, down and service mode
-
Confirm blackout shades control up, down and stop
-
Confirm sun shades control up, down and stop
-
Confirm control of lighting scenes and zones
-
Confirm control of lighting presets
-
Confirm HVAC control is functioning
-
Confirm occupancy sensors are working to specifications
-
Confirm light sensors are working to specifications
-
Is there streaming or recording in the system
Recording/Streaming Control System Testing
-
Confirm recording/ streaming devices are powering on and off properly
-
Confirm recording/ streaming devices are functioning properly
-
Confirm all source inputs are recording/ streaming properly
-
Confirm all cameras inputs are recording/ streaming properly
-
Is there VTC in the system?
VTC Control System Testing
-
Test all aspects of camera control ( PTZ, Focus,Presets,Power)
-
Test all menu navigation functions
-
Test all dialing functions ( manual, address book, speed dial, favorites)
-
Perform VTC test calls using the control system
-
Test all sources through content using the control system
-
Confirm source audio works locally while in VTC call
-
Confirm all audio sources pass through VTC properly
-
By signing, I agree that I have completed the above tasks to the best of my ability and as completely as possible for the job at hand. I have reported any issues or incomplete tasks to the Project Manager or appropriate person internally.
SC VTC
VTC Commissioning
-
Record codec model number
-
Record codec serial number
-
Record customer Log in and password
-
Is there a license key to unlock options
-
Record software key
-
Save the system profile and load it onto server
-
How many monitors are in the system?
Monitors
-
Output resolution
- 1920 x 1080 @ 60Hz
- 1280 x 720 @ 60 Hz
- 1024 x 768 @ 60Hz
- 1080P
- 720P
- Other
-
Record output resolution
-
Output Format
- HDMI
- DVI
- VGA
- Component
- S-Video
- Composite
-
How many cameras are in the system
Camera
-
Aspect ratio
-
Format
- HDMI
- DVI
- VGA
- Component
- S-Video
- Composite
-
Backlight compensation
-
Is this the content camera?
-
Codec Manufacturer?
Generic Codec
-
Record manufacturer and model number of codec
-
Codec connectivity is...
- IP
- ISDN
- SIP
ISDN
-
Select switch type
-
Record switch type
-
Record SPID numbers
-
Record ISDN numbers
IP
-
Record IP Address
-
Record Subnet Mask
-
Record Default Gateway
-
Record any pertinent information. (NAT or Gateway setting etc.)
SIP
-
Record URI
-
Default Transport
-
TLS Verify enabled?
-
Record Proxy Type
-
Record Proxy Address
-
Record Login Name
-
Is Password enabled
-
Record Password
-
Profile choice
- Standard
- Alcatel
- Avaya
- Cisco
- Microsoft
- Nortel
-
SIP Registrar Server
Cisco
-
Codec connectivity is...
- IP
- ISDN
- SIP
ISDN
-
Select switch type
-
Record switch type
-
Record SPID numbers
-
Record ISDN numbers
IP
-
Record IP Address
-
Record Subnet Mask
-
Record Default Gateway
SIP
-
Record Authentication Login Name
-
Is Password enabled
-
Record Authentication Password
-
Default Transport
-
TLS Verify enabled?
-
Record Proxy Address
-
Proxy Discovery
-
SIP Profile
- Standard
- Alcatel
- Avaya
- Cisco
- Microsoft
- Nortel
-
Record SIP URI
Lifesize
-
Codec connectivity is...
- IP
- ISDN
- SIP
ISDN
-
Select switch type
-
Record switch type
-
Record SPID numbers
-
Record ISDN numbers
IP
-
Record IP Address
-
Record Subnet Mask
-
Record Default Gateway
SIP
-
SIP Server
-
User Name
-
Is Password enabled
-
Record Password
-
Default Transport
-
TLS Server Validate
-
Proxy Server
-
Record Proxy Port Number
-
Server Type
-
SIP Registrar Server
-
Record IP and Port information
Polycom
-
Codec connectivity is...
- IP
- ISDN
- SIP
ISDN
-
Select switch type
-
Record switch type
-
Record SPID numbers
-
Record ISDN numbers
IP
-
Record IP Address
-
Record Subnet Mask
-
Record Default Gateway
SIP
-
Record URI
-
Transport Protocol
-
TLS Verify enabled?
-
Record Login Name
-
Record Domain User Name
-
Is Password enabled
-
Record Password
-
Record SIP Registrar Server
-
Record Proxy Server