Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Job Number:
-
Project / Site Manager Details:
-
Sales Person
-
Phone Number:
-
Expected delivery date
-
Expected installation date
-
Any special time required for delivery?
Site Measure Check List
-
Does the site have ducted skirt?
-
Ducted Skirt size.
- 3mm
- 20mm
- 25mm
- 30mm
- 35mm
- 40mm
- 45mm
- 50mm
-
Are there any wall to wall measurments?
-
Do these measurements include the skirting ?
-
Has there been an allowance for ducted skirt on desks, screens and storage?
-
Are there cutouts required on this site
-
Will these cutouts be performed on site or in the factory
-
Are we using scallops or cable entry caps on this project
-
Have these positions been confirmed
-
What height are the overheads cupboards being installed at?
- 600mm
- 400mm
- 450mm
- 500mm
- 550mm
- other
-
Ceiling Height?
-
Do we have the latest drawing?
-
Drawing Number
-
Are there any Non Catalogue finishes being used on this project?
-
What type of site is this
Electrical
-
Are there any power poles required for this site?
-
Have we checked ceiling for air con / lighting positions?
-
Have the starter plate locations been addressed?
-
Have the starter plates been delivered?
-
Have we confirmed qty of data per workstation?
-
Have we double checked the cabling qty?
-
Are there any light / air con switches on the wall that can affect the install?
Changes required to Production
-
List the changes below
Lift access
-
Width
-
Height
-
Depth
Photograph of site
-
Internal photograph
-
External photograph including loading dock