Title Page

INSPECTION CHECKLIST

  • Member Name:

  • Date:

  • Work Order #

  • Intial Inspection:

  • Re-Inspection:

PRIMARY TRENCH

  • Proper Depth (minimum 36")

  • Bottom Level (no humps in conduit)

  • Follows approved route

  • NOT backfilled

PRIMARY CONDUIT

  • Proper Size Conduit

  • Proper Schedule PVC / HDPE

  • 90 Degree Sweeping Bends

  • (Maximum of 3 - including risers)

  • Pull String Installed

PRIMARY BOX PADS/SWITCH BOXES

  • Installed at Approved Locations

  • Proper Depth of Burial

  • Gravel in Bottom

  • Installed to Spec

SECONDARY TRENCH

  • Proper Depth (minimum 36")

  • Bottom Level (no humps in conduit)

  • Follows approved route

  • NOT backfilled

SECONDARY CONDUIT

  • Proper Size Conduit

  • 3" up to 350 MCM Triplex

  • Proper Schedule PVC / HDPE

  • 90 Degree Sweeping Bends

  • (Maximum of 3 - including risers)

  • Pull String Installed

METER BASE

  • Inspection Permit

  • Wired Correctly

  • Riser Pipe and coupler

  • Proper Grounding

INSPECTION RESULT (Indicate with (x) below)

  • ADDITIONAL COMMENTS:

  • INSPECTOR:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.