Title Page
-
Document No.HGACA01
-
Apartment Commissioning Check List Holland Green
-
Holland Green Apartment Number
-
Conducted on
-
Prepared by
-
224-234 Kensington High Street London W8 6NQ
-
Personnel
AV Patch Frame
-
Is the patch frame correctly installed to the required location?
-
Confirmation all data has been connected to the patch frame and is loomed in correctly.
-
Confirmation all speaker lines have been connected to the patch frame
-
Confirmation all Coax services have been connected to the patch frame
-
Confirmation all incoming cable is labelled
-
Confirmation that all patch panels are labelled
-
Confirmation that all feeds have been tested and results compiled
-
Is the patch frame ready to be offered for inspection?
-
Images of Patch Frame
Lighting Control Panel
-
Is the lighting control panel correctly installed at the required location?
-
Have all third party connections taken place?
-
Confirmation of LV terminations have been carried out
-
Confirmation that the Cat6 link between the lighting control panel and patch frame has taken place
-
Confirmation that all pre commissioning checks as required have been carried out
-
Is the lighting control panel ready to be offered for programming?
-
Has the lighting control system been programmed and tested?
-
Images of Lighting Control Panel
Fibre Connectivity
-
Has the fibre patch box been installed at the required location?
-
Is the area suitable for fibre terminations to take place?
-
Confirmation that all fibre terminations have been carried out
-
Confirmation that all fibre terminations have been tested and results compiled
-
Images of Fibre Patch Box
Blind/Curtain control cabling
-
Is this apartment to have blind control motors installed?
-
Have these been installed to the required location?
-
Have all terminations required taken place?
-
If the cabling id for future provision, has the cable been left coiled and labelled in a location directed by the client?
-
Images of Blind/Curtain control cabling
Field End Terminations
Living Room
-
Have all data terminations taken place and are the sockets free from damage?
-
Are the data sockets labelled as required?
-
Have all coax terminations taken place and are the sockets free from damage?
-
Are the coax sockets labelled as required?
-
Have all fibre terminations taken place and are the sockets free from damage?
-
Are the fibre sockets labelled as required?
-
Have all surround sound terminations taken place and are the sockets free from damage?
-
Are the surround sound sockets labelled as required?
-
Confirmation that the lighting keypad is installed at the required location?
-
Does the lighting operate in the following manner? <br>Button 1 All on 100%<br>Button 2 75%<br>Button 3 50%<br>Button 4 25%<br>Button 5 All off<br>Dimming Controls present? <br>
-
Are all blank plates installed as required?
-
If required, is the PIR installed at the correct location?
-
Images of all field end terminations to confirm connectivity
Dining Room
-
Have all data terminations taken place and are the sockets free from damage?
-
Are the data sockets labelled as required?
-
Have all coax terminations taken place and are the sockets free from damage?
-
Are the coax sockets labelled as required?
-
Have all fibre terminations taken place and are the sockets free from damage?
-
Are the fibre sockets labelled as required?
-
Have all surround sound terminations taken place and are the sockets free from damage?
-
Are the surround sound sockets labelled as required?
-
Confirmation that the lighting keypad is installed at the required location?
-
Does the lighting operate in the following manner? <br>Button 1 All on 100%<br>Button 2 75%<br>Button 3 50%<br>Button 4 25%<br>Button 5 All off<br>Dimming Controls present? <br>
-
Are all blank plates installed as required?
-
If required, is the PIR installed at the correct location?
-
Images of all field end terminations to confirm connectivity
Study
-
Have all data terminations taken place and are the sockets free from damage?
-
Are the data sockets labelled as required?
-
Have all coax terminations taken place and are the sockets free from damage?
-
Are the coax sockets labelled as required?
-
Have all fibre terminations taken place and are the sockets free from damage?
-
Are the fibre sockets labelled as required?
-
Have all surround sound terminations taken place and are the sockets free from damage?
-
Are the surround sound sockets labelled as required?
-
Confirmation that the lighting keypad is installed at the required location?
-
Does the lighting operate in the following manner? <br>Button 1 All on 100%<br>Button 2 75%<br>Button 3 50%<br>Button 4 25%<br>Button 5 All off<br>Dimming Controls present? <br>
-
Are all blank plates installed as required?
-
If required, is the PIR installed at the correct location?
-
Images of all field end terminations to confirm connectivity
Kitchen
-
Have all data terminations taken place and are the sockets free from damage?
-
Are the data sockets labelled as required?
-
Confirmation that the lighting keypad is installed at the required location?
-
Does the lighting operate in the following manner? <br>Button 1 All on 100%<br>Button 2 75%<br>Button 3 50%<br>Button 4 25%<br>Button 5 All off<br>Dimming Controls present? <br>
-
Are all blank plates installed as required?
-
If required, is the PIR installed at the correct location?
-
Images of all field end terminations to confirm connectivity
Living area
-
Have all data terminations taken place and are the sockets free from damage?
-
Are the data sockets labelled as required?
-
Have all coax terminations taken place and are the sockets free from damage?
-
Are the coax sockets labelled as required?
-
Have all fibre terminations taken place and are the sockets free from damage?
-
Are the fibre sockets labelled as required?
-
Have all surround sound terminations taken place and are the sockets free from damage?
-
Are the surround sound sockets labelled as required?
-
Confirmation that the lighting keypad is installed at the required location?
-
Does the lighting operate in the following manner? <br>Button 1 All on 100%<br>Button 2 75%<br>Button 3 50%<br>Button 4 25%<br>Button 5 All off<br>Dimming Controls present? <br>
-
Are all blank plates installed as required?
-
If required, is the PIR installed at the correct location?
-
Images of all field end terminations to confirm connectivity
Master bedroom
-
Have all data terminations taken place and are the sockets free from damage?
-
Are the data sockets labelled as required?
-
Have all coax terminations taken place and are the sockets free from damage?
-
Are the coax sockets labelled as required?
-
Have all fibre terminations taken place and are the sockets free from damage?
-
Are the fibre sockets labelled as required?
-
Confirmation that the lighting keypads are installed at the required location?
-
Does the lighting operate in the following manner? <br>Button 1 All on 100%<br>Button 2 75%<br>Button 3 50%<br>Button 4 25%<br>Button 5 All off<br>Dimming Controls present? <br>
-
Are all blank plates installed as required?
-
If required, is the PIR installed at the correct location?
-
Images of all field end terminations to confirm connectivity
His Dressing Room
-
Have all data terminations taken place and are the sockets free from damage?
-
Are the data sockets labelled as required?
-
Confirmation that the lighting keypad is installed at the required location?
-
Does the lighting operate in the following manner? <br>Button 1 All on 100%<br>Button 2 75%<br>Button 3 50%<br>Button 4 25%<br>Button 5 All off<br>Dimming Controls present? <br>
-
Are all blank plates installed as required?
-
If required, is the PIR installed at the correct location?
-
Images of all field end terminations to confirm connectivity
Her Dressing Room
-
Have all data terminations taken place and are the sockets free from damage?
-
Are the data sockets labelled as required?
-
Confirmation that the lighting keypad is installed at the required location?
-
Does the lighting operate in the following manner? <br>Button 1 All on 100%<br>Button 2 75%<br>Button 3 50%<br>Button 4 25%<br>Button 5 All off<br>Dimming Controls present? <br>
-
Are all blank plates installed as required?
-
If required, is the PIR installed at the correct location?
-
Images of all field end terminations to confirm connectivity
Master Bathroom En Suite
-
Confirmation that the lighting keypad is installed at the required location?
-
Does the lighting operate in the following manner? <br>Button 1 All on 100%<br>Button 2 75%<br>Button 3 50%<br>Button 4 25%<br>Button 5 All off<br>Dimming Controls present? <br>
-
Are all future tv and speaker cabling installed if applicable?
-
Are all blank plates installed as required?
-
If required, is the PIR installed at the correct location?
-
Images of all field end terminations to confirm connectivity
Bedroom 2
-
Have all data terminations taken place and are the sockets free from damage?
-
Are the data sockets labelled as required?
-
Have all coax terminations taken place and are the sockets free from damage?
-
Are the coax sockets labelled as required?
-
Confirmation that the lighting keypad is installed at the required location?
-
Does the lighting operate in the following manner? <br>Button 1 All on 100%<br>Button 2 75%<br>Button 3 50%<br>Button 4 25%<br>Button 5 All off<br>Dimming Controls present? <br>
-
Are all blank plates installed as required?
-
If required, is the PIR installed at the correct location?
-
Images of all field end terminations to confirm connectivity
Bedroom 2 En Suite
-
Confirmation that the lighting keypad is installed at the required location?
-
Does the lighting operate in the following manner? <br>Button 1 All on 100%<br>Button 2 75%<br>Button 3 50%<br>Button 4 25%<br>Button 5 All off<br>Dimming Controls present? <br>
-
Are all future tv and speaker cabling installed if applicable?
-
Are all blank plates installed as required?
-
If required, is the PIR installed at the correct location?
-
Images of all field end terminations to confirm connectivity
Bedroom 3
-
Have all data terminations taken place and are the sockets free from damage?
-
Are the data sockets labelled as required?
-
Have all coax terminations taken place and are the sockets free from damage?
-
Are the coax sockets labelled as required?
-
Confirmation that the lighting keypad is installed at the required location?
-
Does the lighting operate in the following manner? <br>Button 1 All on 100%<br>Button 2 75%<br>Button 3 50%<br>Button 4 25%<br>Button 5 All off<br>Dimming Controls present? <br>
-
Are all blank plates installed as required?
-
If required, is the PIR installed at the correct location?
-
Images of all field end terminations to confirm connectivity
Bedroom 3 Ensuite
-
Confirmation that the lighting keypad is installed at the required location?
-
Does the lighting operate in the following manner? <br>Button 1 All on 100%<br>Button 2 75%<br>Button 3 50%<br>Button 4 25%<br>Button 5 All off<br>Dimming Controls present? <br>
-
Are all future tv and speaker cabling installed if applicable?
-
Are all blank plates installed as required?
-
If required, is the PIR installed at the correct location?
-
Images of all field end terminations to confirm connectivity
Bedroom 4
-
Have all data terminations taken place and are the sockets free from damage?
-
Are the data sockets labelled as required?
-
Have all coax terminations taken place and are the sockets free from damage?
-
Are the coax sockets labelled as required?
-
Confirmation that the lighting keypad is installed at the required location?
-
Does the lighting operate in the following manner? <br>Button 1 All on 100%<br>Button 2 75%<br>Button 3 50%<br>Button 4 25%<br>Button 5 All off<br>Dimming Controls present? <br>
-
Are all blank plates installed as required?
-
If required, is the PIR installed at the correct location?
-
Images of all field end terminations to confirm connectivity
Bedroom 4 En Suite
-
Confirmation that the lighting keypad is installed at the required location?
-
Does the lighting operate in the following manner? <br>Button 1 All on 100%<br>Button 2 75%<br>Button 3 50%<br>Button 4 25%<br>Button 5 All off<br>Dimming Controls present? <br>
-
Are all blank plates installed as required?
-
Are all future tv and speaker cabling installed if applicable?
-
If required, is the PIR installed at the correct location?
-
Images of all field end terminations to confirm connectivity
Bedroom 5
-
Have all data terminations taken place and are the sockets free from damage?
-
Are the data sockets labelled as required?
-
Have all coax terminations taken place and are the sockets free from damage?
-
Are the coax sockets labelled as required?
-
Confirmation that the lighting keypad is installed at the required location?
-
Does the lighting operate in the following manner? <br>Button 1 All on 100%<br>Button 2 75%<br>Button 3 50%<br>Button 4 25%<br>Button 5 All off<br>Dimming Controls present? <br>
-
Are all blank plates installed as required?
-
If required, is the PIR installed at the correct location?
-
Images of all field end terminations to confirm connectivity
Bedroom 5 En suite
-
Confirmation that the lighting keypad is installed at the required location if applicable
-
Are all future tv and speaker cabling installed if applicable?
-
If required, is the PIR installed at the correct location?
-
Images of all field end terminations to confirm connectivity
-
Does the lighting operate in the following manner? <br>Button 1 All on 100%<br>Button 2 75%<br>Button 3 50%<br>Button 4 25%<br>Button 5 All off<br>Dimming Controls present? <br>
Bedroom 6
-
Have all data terminations taken place and are the sockets free from damage?
-
Are the data sockets labelled as required?
-
Have all coax terminations taken place and are the sockets free from damage?
-
Are the coax sockets labelled as required?
-
Confirmation that the lighting keypads are installed at the required location?
-
Does the lighting operate in the following manner? <br>Button 1 All on 100%<br>Button 2 75%<br>Button 3 50%<br>Button 4 25%<br>Button 5 All off<br>Dimming Controls present? <br>
-
Are all blank plates installed as required?
-
If required, is the PIR installed at the correct location?
-
Images of all field end terminations to confirm connectivity
Bedroom 6 En Suite
-
Confirmation that the lighting keypads are installed at the required location if applicable?
-
Does the lighting operate in the following manner? <br>Button 1 All on 100%<br>Button 2 75%<br>Button 3 50%<br>Button 4 25%<br>Button 5 All off<br>Dimming Controls present? <br>
-
Are all blank plates installed as required?
-
Are all future tv and speaker cabling installed if applicable?
-
If required, is the PIR installed at the correct location?
-
Images of all field end terminations to confirm connectivity
Lobby Area 1
-
Have all data terminations taken place and are the sockets free from damage?
-
Are the data sockets labelled as required?
-
Confirmation that the lighting keypads are installed at the required location if applicable
-
Does the lighting operate in the following manner? <br>Button 1 All on 100%<br>Button 2 75%<br>Button 3 50%<br>Button 4 25%<br>Button 5 All off<br>Dimming Controls present? <br>
-
Are all blank plates installed as required?
-
If required, is the PIR installed at the correct location?
-
Images of all field end terminations to confirm connectivity
Lobby Area 2
-
Have all data terminations taken place and are the sockets free from damage?
-
Are the data sockets labelled as required?
-
Confirmation that the lighting keypads are installed at the required location if applicable
-
Does the lighting operate in the following manner? <br>Button 1 All on 100%<br>Button 2 75%<br>Button 3 50%<br>Button 4 25%<br>Button 5 All off<br>Dimming Controls present? <br>
-
Are all blank plates installed as required?
-
If required, is the PIR installed at the correct location?
-
Images of all field end terminations to confirm connectivity
Hallway
-
Have all data terminations taken place and are the sockets free from damage?
-
Are the data sockets labelled as required?
-
Confirmation that the lighting keypads are installed at the required location if applicable
-
Does the lighting operate in the following manner? <br>Button 1 All on 100%<br>Button 2 75%<br>Button 3 50%<br>Button 4 25%<br>Button 5 All off<br>Dimming Controls present? <br>
-
Are all blank plates installed as required?
-
Images of all field end terminations to confirm connectivity
AV Cupboard
-
If required, is the PIR installed at the correct location?
-
Items that need to be actioned and by whom
-
When are these actions required to be closed out?
-
Images of all field end terminations to confirm connectivity
Testing Progress and Documentation
-
Has dead testing to all cables been carried out?
-
Have the results been collated and submitted?
-
Has fluke testing been carried out?
-
Have the results been collated and submitted?
-
Has fibre testing been carried out?
-
Have the results been collated and submitted?
Any other notes
Sign off
-
Signature
-
Print Name
Witness
-
SIgnature
-
Print Name