Title Page

  • Document No.HGACA01

  • Apartment Commissioning Check List Holland Green

  • Holland Green Apartment Number

  • Conducted on

  • Prepared by

  • 224-234 Kensington High Street London W8 6NQ
  • Personnel

AV Patch Frame

  • Is the patch frame correctly installed to the required location?

  • Confirmation all data has been connected to the patch frame and is loomed in correctly.

  • Confirmation all speaker lines have been connected to the patch frame

  • Confirmation all Coax services have been connected to the patch frame

  • Confirmation all incoming cable is labelled

  • Confirmation that all patch panels are labelled

  • Confirmation that all feeds have been tested and results compiled

  • Is the patch frame ready to be offered for inspection?

  • Images of Patch Frame

Lighting Control Panel

  • Is the lighting control panel correctly installed at the required location?

  • Have all third party connections taken place?

  • Confirmation of LV terminations have been carried out

  • Confirmation that the Cat6 link between the lighting control panel and patch frame has taken place

  • Confirmation that all pre commissioning checks as required have been carried out

  • Is the lighting control panel ready to be offered for programming?

  • Has the lighting control system been programmed and tested?

  • Images of Lighting Control Panel

Fibre Connectivity

  • Has the fibre patch box been installed at the required location?

  • Is the area suitable for fibre terminations to take place?

  • Confirmation that all fibre terminations have been carried out

  • Confirmation that all fibre terminations have been tested and results compiled

  • Images of Fibre Patch Box

Blind/Curtain control cabling

  • Is this apartment to have blind control motors installed?

  • Have these been installed to the required location?

  • Have all terminations required taken place?

  • If the cabling id for future provision, has the cable been left coiled and labelled in a location directed by the client?

  • Images of Blind/Curtain control cabling

Field End Terminations

Living Room

  • Have all data terminations taken place and are the sockets free from damage?

  • Are the data sockets labelled as required?

  • Have all coax terminations taken place and are the sockets free from damage?

  • Are the coax sockets labelled as required?

  • Have all fibre terminations taken place and are the sockets free from damage?

  • Are the fibre sockets labelled as required?

  • Have all surround sound terminations taken place and are the sockets free from damage?

  • Are the surround sound sockets labelled as required?

  • Confirmation that the lighting keypad is installed at the required location?

  • Does the lighting operate in the following manner? <br>Button 1 All on 100%<br>Button 2 75%<br>Button 3 50%<br>Button 4 25%<br>Button 5 All off<br>Dimming Controls present? <br>

  • Are all blank plates installed as required?

  • If required, is the PIR installed at the correct location?

  • Images of all field end terminations to confirm connectivity

Dining Room

  • Have all data terminations taken place and are the sockets free from damage?

  • Are the data sockets labelled as required?

  • Have all coax terminations taken place and are the sockets free from damage?

  • Are the coax sockets labelled as required?

  • Have all fibre terminations taken place and are the sockets free from damage?

  • Are the fibre sockets labelled as required?

  • Have all surround sound terminations taken place and are the sockets free from damage?

  • Are the surround sound sockets labelled as required?

  • Confirmation that the lighting keypad is installed at the required location?

  • Does the lighting operate in the following manner? <br>Button 1 All on 100%<br>Button 2 75%<br>Button 3 50%<br>Button 4 25%<br>Button 5 All off<br>Dimming Controls present? <br>

  • Are all blank plates installed as required?

  • If required, is the PIR installed at the correct location?

  • Images of all field end terminations to confirm connectivity

Study

  • Have all data terminations taken place and are the sockets free from damage?

  • Are the data sockets labelled as required?

  • Have all coax terminations taken place and are the sockets free from damage?

  • Are the coax sockets labelled as required?

  • Have all fibre terminations taken place and are the sockets free from damage?

  • Are the fibre sockets labelled as required?

  • Have all surround sound terminations taken place and are the sockets free from damage?

  • Are the surround sound sockets labelled as required?

  • Confirmation that the lighting keypad is installed at the required location?

  • Does the lighting operate in the following manner? <br>Button 1 All on 100%<br>Button 2 75%<br>Button 3 50%<br>Button 4 25%<br>Button 5 All off<br>Dimming Controls present? <br>

  • Are all blank plates installed as required?

  • If required, is the PIR installed at the correct location?

  • Images of all field end terminations to confirm connectivity

Kitchen

  • Have all data terminations taken place and are the sockets free from damage?

  • Are the data sockets labelled as required?

  • Confirmation that the lighting keypad is installed at the required location?

  • Does the lighting operate in the following manner? <br>Button 1 All on 100%<br>Button 2 75%<br>Button 3 50%<br>Button 4 25%<br>Button 5 All off<br>Dimming Controls present? <br>

  • Are all blank plates installed as required?

  • If required, is the PIR installed at the correct location?

  • Images of all field end terminations to confirm connectivity

Living area

  • Have all data terminations taken place and are the sockets free from damage?

  • Are the data sockets labelled as required?

  • Have all coax terminations taken place and are the sockets free from damage?

  • Are the coax sockets labelled as required?

  • Have all fibre terminations taken place and are the sockets free from damage?

  • Are the fibre sockets labelled as required?

  • Have all surround sound terminations taken place and are the sockets free from damage?

  • Are the surround sound sockets labelled as required?

  • Confirmation that the lighting keypad is installed at the required location?

  • Does the lighting operate in the following manner? <br>Button 1 All on 100%<br>Button 2 75%<br>Button 3 50%<br>Button 4 25%<br>Button 5 All off<br>Dimming Controls present? <br>

  • Are all blank plates installed as required?

  • If required, is the PIR installed at the correct location?

  • Images of all field end terminations to confirm connectivity

Master bedroom

  • Have all data terminations taken place and are the sockets free from damage?

  • Are the data sockets labelled as required?

  • Have all coax terminations taken place and are the sockets free from damage?

  • Are the coax sockets labelled as required?

  • Have all fibre terminations taken place and are the sockets free from damage?

  • Are the fibre sockets labelled as required?

  • Confirmation that the lighting keypads are installed at the required location?

  • Does the lighting operate in the following manner? <br>Button 1 All on 100%<br>Button 2 75%<br>Button 3 50%<br>Button 4 25%<br>Button 5 All off<br>Dimming Controls present? <br>

  • Are all blank plates installed as required?

  • If required, is the PIR installed at the correct location?

  • Images of all field end terminations to confirm connectivity

His Dressing Room

  • Have all data terminations taken place and are the sockets free from damage?

  • Are the data sockets labelled as required?

  • Confirmation that the lighting keypad is installed at the required location?

  • Does the lighting operate in the following manner? <br>Button 1 All on 100%<br>Button 2 75%<br>Button 3 50%<br>Button 4 25%<br>Button 5 All off<br>Dimming Controls present? <br>

  • Are all blank plates installed as required?

  • If required, is the PIR installed at the correct location?

  • Images of all field end terminations to confirm connectivity

Her Dressing Room

  • Have all data terminations taken place and are the sockets free from damage?

  • Are the data sockets labelled as required?

  • Confirmation that the lighting keypad is installed at the required location?

  • Does the lighting operate in the following manner? <br>Button 1 All on 100%<br>Button 2 75%<br>Button 3 50%<br>Button 4 25%<br>Button 5 All off<br>Dimming Controls present? <br>

  • Are all blank plates installed as required?

  • If required, is the PIR installed at the correct location?

  • Images of all field end terminations to confirm connectivity

Master Bathroom En Suite

  • Confirmation that the lighting keypad is installed at the required location?

  • Does the lighting operate in the following manner? <br>Button 1 All on 100%<br>Button 2 75%<br>Button 3 50%<br>Button 4 25%<br>Button 5 All off<br>Dimming Controls present? <br>

  • Are all future tv and speaker cabling installed if applicable?

  • Are all blank plates installed as required?

  • If required, is the PIR installed at the correct location?

  • Images of all field end terminations to confirm connectivity

Bedroom 2

  • Have all data terminations taken place and are the sockets free from damage?

  • Are the data sockets labelled as required?

  • Have all coax terminations taken place and are the sockets free from damage?

  • Are the coax sockets labelled as required?

  • Confirmation that the lighting keypad is installed at the required location?

  • Does the lighting operate in the following manner? <br>Button 1 All on 100%<br>Button 2 75%<br>Button 3 50%<br>Button 4 25%<br>Button 5 All off<br>Dimming Controls present? <br>

  • Are all blank plates installed as required?

  • If required, is the PIR installed at the correct location?

  • Images of all field end terminations to confirm connectivity

Bedroom 2 En Suite

  • Confirmation that the lighting keypad is installed at the required location?

  • Does the lighting operate in the following manner? <br>Button 1 All on 100%<br>Button 2 75%<br>Button 3 50%<br>Button 4 25%<br>Button 5 All off<br>Dimming Controls present? <br>

  • Are all future tv and speaker cabling installed if applicable?

  • Are all blank plates installed as required?

  • If required, is the PIR installed at the correct location?

  • Images of all field end terminations to confirm connectivity

Bedroom 3

  • Have all data terminations taken place and are the sockets free from damage?

  • Are the data sockets labelled as required?

  • Have all coax terminations taken place and are the sockets free from damage?

  • Are the coax sockets labelled as required?

  • Confirmation that the lighting keypad is installed at the required location?

  • Does the lighting operate in the following manner? <br>Button 1 All on 100%<br>Button 2 75%<br>Button 3 50%<br>Button 4 25%<br>Button 5 All off<br>Dimming Controls present? <br>

  • Are all blank plates installed as required?

  • If required, is the PIR installed at the correct location?

  • Images of all field end terminations to confirm connectivity

Bedroom 3 Ensuite

  • Confirmation that the lighting keypad is installed at the required location?

  • Does the lighting operate in the following manner? <br>Button 1 All on 100%<br>Button 2 75%<br>Button 3 50%<br>Button 4 25%<br>Button 5 All off<br>Dimming Controls present? <br>

  • Are all future tv and speaker cabling installed if applicable?

  • Are all blank plates installed as required?

  • If required, is the PIR installed at the correct location?

  • Images of all field end terminations to confirm connectivity

Bedroom 4

  • Have all data terminations taken place and are the sockets free from damage?

  • Are the data sockets labelled as required?

  • Have all coax terminations taken place and are the sockets free from damage?

  • Are the coax sockets labelled as required?

  • Confirmation that the lighting keypad is installed at the required location?

  • Does the lighting operate in the following manner? <br>Button 1 All on 100%<br>Button 2 75%<br>Button 3 50%<br>Button 4 25%<br>Button 5 All off<br>Dimming Controls present? <br>

  • Are all blank plates installed as required?

  • If required, is the PIR installed at the correct location?

  • Images of all field end terminations to confirm connectivity

Bedroom 4 En Suite

  • Confirmation that the lighting keypad is installed at the required location?

  • Does the lighting operate in the following manner? <br>Button 1 All on 100%<br>Button 2 75%<br>Button 3 50%<br>Button 4 25%<br>Button 5 All off<br>Dimming Controls present? <br>

  • Are all blank plates installed as required?

  • Are all future tv and speaker cabling installed if applicable?

  • If required, is the PIR installed at the correct location?

  • Images of all field end terminations to confirm connectivity

Bedroom 5

  • Have all data terminations taken place and are the sockets free from damage?

  • Are the data sockets labelled as required?

  • Have all coax terminations taken place and are the sockets free from damage?

  • Are the coax sockets labelled as required?

  • Confirmation that the lighting keypad is installed at the required location?

  • Does the lighting operate in the following manner? <br>Button 1 All on 100%<br>Button 2 75%<br>Button 3 50%<br>Button 4 25%<br>Button 5 All off<br>Dimming Controls present? <br>

  • Are all blank plates installed as required?

  • If required, is the PIR installed at the correct location?

  • Images of all field end terminations to confirm connectivity

Bedroom 5 En suite

  • Confirmation that the lighting keypad is installed at the required location if applicable

  • Are all future tv and speaker cabling installed if applicable?

  • If required, is the PIR installed at the correct location?

  • Images of all field end terminations to confirm connectivity

  • Does the lighting operate in the following manner? <br>Button 1 All on 100%<br>Button 2 75%<br>Button 3 50%<br>Button 4 25%<br>Button 5 All off<br>Dimming Controls present? <br>

Bedroom 6

  • Have all data terminations taken place and are the sockets free from damage?

  • Are the data sockets labelled as required?

  • Have all coax terminations taken place and are the sockets free from damage?

  • Are the coax sockets labelled as required?

  • Confirmation that the lighting keypads are installed at the required location?

  • Does the lighting operate in the following manner? <br>Button 1 All on 100%<br>Button 2 75%<br>Button 3 50%<br>Button 4 25%<br>Button 5 All off<br>Dimming Controls present? <br>

  • Are all blank plates installed as required?

  • If required, is the PIR installed at the correct location?

  • Images of all field end terminations to confirm connectivity

Bedroom 6 En Suite

  • Confirmation that the lighting keypads are installed at the required location if applicable?

  • Does the lighting operate in the following manner? <br>Button 1 All on 100%<br>Button 2 75%<br>Button 3 50%<br>Button 4 25%<br>Button 5 All off<br>Dimming Controls present? <br>

  • Are all blank plates installed as required?

  • Are all future tv and speaker cabling installed if applicable?

  • If required, is the PIR installed at the correct location?

  • Images of all field end terminations to confirm connectivity

Lobby Area 1

  • Have all data terminations taken place and are the sockets free from damage?

  • Are the data sockets labelled as required?

  • Confirmation that the lighting keypads are installed at the required location if applicable

  • Does the lighting operate in the following manner? <br>Button 1 All on 100%<br>Button 2 75%<br>Button 3 50%<br>Button 4 25%<br>Button 5 All off<br>Dimming Controls present? <br>

  • Are all blank plates installed as required?

  • If required, is the PIR installed at the correct location?

  • Images of all field end terminations to confirm connectivity

Lobby Area 2

  • Have all data terminations taken place and are the sockets free from damage?

  • Are the data sockets labelled as required?

  • Confirmation that the lighting keypads are installed at the required location if applicable

  • Does the lighting operate in the following manner? <br>Button 1 All on 100%<br>Button 2 75%<br>Button 3 50%<br>Button 4 25%<br>Button 5 All off<br>Dimming Controls present? <br>

  • Are all blank plates installed as required?

  • If required, is the PIR installed at the correct location?

  • Images of all field end terminations to confirm connectivity

Hallway

  • Have all data terminations taken place and are the sockets free from damage?

  • Are the data sockets labelled as required?

  • Confirmation that the lighting keypads are installed at the required location if applicable

  • Does the lighting operate in the following manner? <br>Button 1 All on 100%<br>Button 2 75%<br>Button 3 50%<br>Button 4 25%<br>Button 5 All off<br>Dimming Controls present? <br>

  • Are all blank plates installed as required?

  • Images of all field end terminations to confirm connectivity

AV Cupboard

  • If required, is the PIR installed at the correct location?

  • Items that need to be actioned and by whom

  • When are these actions required to be closed out?

  • Images of all field end terminations to confirm connectivity

Testing Progress and Documentation

  • Has dead testing to all cables been carried out?

  • Have the results been collated and submitted?

  • Has fluke testing been carried out?

  • Have the results been collated and submitted?

  • Has fibre testing been carried out?

  • Have the results been collated and submitted?

Any other notes

Sign off

  • Signature

  • Print Name

Witness

  • SIgnature

  • Print Name

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.