Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
PROJECT:
-
Job site
-
Location
-
Client
CHECKLIST
-
Construction drawings approved for use
-
Drg. No
-
Rev. No.
VERIFICATION:
-
2. Pipe
-
3. Materials approved for use
PIPE WORK:
-
1 Pipe install as per drawing
-
2. Pipe bracketed as required
-
3. All pipework completed in area
-
4. Pipe label’s fitted as required
HOSE REEL:
-
1. Hose reel install at correct height
-
2. Hose reel fixed with correct brackets
-
3. Hose reel fitted with maintains tags
-
VALVES:
VALVES:
-
Valves installed as per drawing
-
Valves installed in correct location
COMMISSIONING:
-
1. All pipe work pressure tested to Kpa and recorded
-
2. All debris flushed from system
-
3. All air bled from system
-
4. System flow tested and recorded
CHECKED BY:
-
Date
-
Signature