Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Auditors / Lead Auditor signature
Office documentation verification
-
1.2.3.1 Certificates: Review all certificates using vessel certificates apps (request LSA, FSS, and other required certificates as required). If deviation, comment.
-
1.2.3.2 DOC: Review DOC certificate posted on sent in self assessment. If deviation, comment.
-
1.2.3.3 Port state control review: Review PSC issues (should all be recorded, check vs. Master statements). If deviation, comment.
-
1.2.3.4 Control of knowledge company requirements (incl. Familiarisation): Review Familiarisation vs. Crewlist / weekly monthly meeting contains vs. Company communication. If deviation, comment.
-
2.2.1 Internal & external audit follow-up: Review all previous audits in progression. If deviation, comment.
-
2.2.2 Evaluation of corrective and proactive actions: Verify effectiveness of corrective actions. If deviation comment.
-
2.2.3 Maintenance plans and records: Verify that TA have no pending setup and maintenance is done as per requirement without delay for critical maintenance. If deviation, comment
-
3.2 definition and documentation about the responsibility, authority and interrelation of all personnel who manage, perform and verify work relating to and affecting safety and pollution: Review master review. If deviation, comment
-
3.3 responsibility for ensuring that adequate resources and shore-based support are provided to enable the designated person or persons to carry out their functions: Verify if situation regarding orders clear: If deviation, comment about issues in term of delayed critical orders (critical spares + orders missing compromising vessel safety)
-
5.1 Master Authority: Confirm that the master reviews were sent and treated. If deviation, comment
-
6.1.1 Master qualification: Review CV (previous experience vs. Company requirements). if deviation, comment
-
6.1.3 Master given support from company: Review vessel situation reports. If deviation, comment
-
6.2.1 Vessel qualified manning: Verify crewlist to compare with OCS data. If deviation found, comment.
-
6.2.2 Vessel appropriate manning: Verify OCS/TA record of rest hours. If deviation, comment.
-
6.3 Personal familiar with their duties: Confirm review familiarisations / In OCS review if SSW requirements are respected. If any deviation identified, comment
-
6.5 Personal is trained: Review Drills and trainings reports. If deviation, comment
-
7.1 Operations: Navigation - Watch handover: Review watch handover checklist vs. Logbook
-
7.2 Operations: Navigation - Radio: Take picture of Radio logbook (daily weekly monthly tests and record of radio watch). If deviation, comment
-
7.3 Operations: Navigation - Manning: Analyse OCS rest/worktime vs. Logbook to check manning req.
-
7.4 Operations - Passage planning: Analysis of passage planning. If deviation, comment
-
7.5 Operations - Navigation standards: Analysis of navigation audit vs. TA (incl. Navtex). If deviation, comment
-
7.6 Operations - personal transfer: Analysis of logbook vs. PTP vs. Drill reports for FRC. If deviation, comment
-
7.7 Operations - Berthing / Mooring: Analysis of mooring practices and planning (PTP/ OCS / logbook). If deviation, comment
-
7.8 Operations - Stability: Analysis of calculation vs. Logbook Draft logging and cargo plan. If deviation, comment
-
7.9 Operations - Cargo (Incl. Methanol): Review JSA vs. Cargo plan vs. Logbook vs. Pictures vs. Checklists hydrocarbon transfer. If deviation vs. reality comment.
-
7.10 Operations - Anchor Handling / Towing: Review JSA vs. AH plan vs. Logbook, vs. OCS vs. Stability software. If deviation, comment. (if not relevant, select N/A)
-
7.11 Operations - DP: Review JSA vs. Logbook vs. OCS. Vs. TA vs. HSE incidents database vs. DP drills. If any open item, comment
-
7.12 Operations - Helideck: Review OCS data and HLO HDA CV. If deviation, comment (if not relevant select N/A)
-
7.13 Operations - Tank cleaning: Review last tank cleaning operation using PTP, PTW, TA, OCS
-
7.14 Operations - ballast and bunkering: Review bunker delivery notes vs. ORB (should have Su% details including in ODA). If deviation, comment.
-
7.16 Operations - JSA: Review all JSA vs. Logbook. If deviation, comment
-
7.17 Operations - PTW: Review PTW vs. Logbook / TA . If deviation, comment
-
7.18 Operations - PPE: Review TA inventory of PPE. If deviation, comment
-
7.19 Operations - Personal safety: Review Hazard hunt.. If deviation, comment
-
7.20 Operations - HSE meetings: Review monthly HSE meeting records. If deviation, comment
-
7.21 Operations - B-SAFE Hazard observation: Review B-Safe cards. If deviation, comment
-
7.22 Operations - Health procedure: Review Medical chest inventory. If deviation, comment
-
7.23 Operations - Hygiene procedure: Review Hygiene inspections records. If deviation comment
-
7.24 Operations - Fresh water: Review TA water treatment related tasks. If deviation, comment.
-
7.25 Operations - Environmental management: Review TA vs. Logbook for OWS and certificates. If deviation, comment.
-
7.26 Operations - Fuel consumption: Review Logbook vs. Average consumption of vessel. If deviation, comment
-
8.1 Emergency shipboard situation: Review Drills and trainings reports and ERP (should cover all possible emergencies). If deviation, comment
-
8.2 Emergency drills and trainings: Review Drills and trainings schedule and respect of regulatory requirements. If deviation, comment
-
8.3 Emergency mesures: Review ERP contact list. If deviation, comment
-
9.1 Reporting - reports: Review hazard hunts / Bsafe cards / and HSE incident database. If deviation, comment
-
9.2 Reporting: efficiency of corrective actions: Review all corrective actions from HSE incident database. If deviations or ineffective corrective actions, comment
-
10.1 Maintenance - procedures are in place to ensure that the ship is maintained: Review TA records vs. PTW and PTP. If deviation, comment
-
10.2.1 Maintenance - Inspection are held at appropriate intervals: Review VTI and TA attachements. If deviation, comment
-
10.2.2 Maintenance - reporting of technical non conformities: Review TA defect report and review cause analysis. If deviation, comment
-
10.2.3 Maintenance - Corrective actions to technical problems: Confirm that corrective actions were taken and orders linked to defects are not overdue. If deviation, comment
-
10.3 Maintenance - critical equipment: Review TA orders linked to defects of critical elements. If deviation, comment
-
11.0 Documentation control: Review logon documents. If deviation, comment
-
12.1 Verification, review, evaluation - Audit: Review previous audits. If deviation, comment
-
12.3 Verification, review, evaluation - Master review: Review master reviews. If deviation, comment
-
12.4 Verification, review, evaluation - Corrective actions: Review previous corrective actions. If deviation, comment
-
12.7 Verification, review, evaluation - Company process owners assistance: Review reply from process owners. If deviation, comment
Interviews
-
1.2.3 Crew interviews - knowledge of regulatory requirements: Interview with officers: check knowledge of new regulatory requirements (based on Memos and communications). If deviation, comment
-
1.2.3.4 Control of knowledge company requirements (incl. Familiarisation): Interview with officers: check knowledge of new company requirements (based on Memos and communications) and roles in case of emergency. If deviation, comment
-
2.1.1 Company policies: Interview with crew regarding policies. If deviation, comment
-
2.1.2 Company objectives: Interview with officers regarding objectives. If deviation, comment
-
3.2 The Company should define and document the responsibility, authority and interrelation of all personnel who manage, perform and verify work relating to and affecting safety and pollution prevention: Question: who is responsible for SMS emergency updates // what to do if and emergency charge in SMS is needed. If deviation, comment
-
4.0 Designated Person Ashore: Ensure that crew is aware about DPA identity and duties. If deviation, comment
-
5.1 Master Authority: Interview with master
-
5.2 Master overriding authority: Master interview: ask for overriding authority. If deviation, comment
-
6.1.1 Master qualification: Interview master to identify proficiency and experience on this specific contract. If deviation, comment
-
6.1.2 Master SMS knowledge: Interview master and evaluate sms knowledge (instruction notes-memo new sms requirements). If deviation, comment
-
6.3 Personal familiar with their duties: Review one emergency situation during interview (Fire/abandon/flooding…) with random personal. If deviation, comment
-
6.4 Personal have adequate understanding of rules, regulations, codes and guidelines: Random control of vessel library + interview of officer. If deviation, comment
-
6.7 Effectiveness of working language: Interview with crew to ensure effectiveness of common language. If deviation, comment
-
7.8 Operations - Stability: Interview of officiers regarding stability. If deviation, comment
-
7.9 Operations - Cargo (Incl. Methanol): Interview officers / crew on Risks linked to cargo ops (clear deck / taglines). If deviation, comment
-
7.10 Operations - Anchor Handling / Towing: Interview officers / engineers on risks linked to AH ops. If deviation, comment (If not applicable, choose N/A)
-
7.11 Operations - DP: Interview DP operators on DP knowledge. If deviation, comment
-
7.12 Operations - Helideck: Interview HLO. If deviation, comment (If not applicable, choose N/A)
-
7.13 Operations - Tank cleaning: Interview CM on tank cleaning practices. If deviation, comment
-
7.15 Operations - Hazardous material procedure: Random request for MSDS
-
7.16 Operations - JSA: Interview of CO or attendance to an operation remotely. If deviation, comment
-
7.25 Operations - Environmental management: Interview of CO to evaluate knowledge. If deviation, comment
-
11 Documentation control: Request vessel to show documents electronic storage. If deviation, comment
-
12.1 Verification, review, evaluation - Audit: Interview on previous audit corrective actions closure. If deviation, comment
-
12.3 Verification, review, evaluation - Master review: Interview on previous master reviews integration. If deviation, comment
-
12.4 Verification, review, evaluation - Corrective actions: Interview on previous audit corrective actions efficiency. If deviation, comment