Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
Client
-
Inspection is being carried out for:
Supervisor/Auditor
Date
-
Select date
Job Number
Engineer
Service Infomation
-
Service laid correctly
-
ECV Correct
-
Meter Position
-
Gas On/Off Tape present?
Meter & Regulator
-
Is Meter Box sited correctly?
-
Is Meter bracket fixed to wall or floor?
-
Is Meter position to correct standards?
-
Sheer Bolts and Washers installed?
-
0800 Sticker on meter?
-
Target regulator exchanged?
-
Regulator sealed?
-
Test nipple checked with LDF?
-
Tightness test satisfactory?
-
Working Pressure correct?
H&S
-
Is all appropriate PPE being worn?
-
Risk Assessment conducted and Team Pack available?
-
Pipe/Cable Locator used?
-
Voltage Stick & Temporary Earth Bond being used?
-
Manual Handling assessed?
-
Environment & Waste considered?
Customer
-
Was Identification shown by engineer?
-
Was customer comments card filled out by customer?
New Pipework
-
Length of Pipework installed?