1.00 Concrete Slab Check
-
Select Concreter that completed the job.
-
Please note details of Other?
-
1.01 Is site fencing intact? (No Damage)
-
If No, notify contractor asap & Advise WHS Manager to investigate, take photographs if applicable
-
1.02 Is all rubbish in the designated area?
-
If No, notify contractor asap & Advise WHS Manager to investigate, take photographs if applicable
-
1.03 Has all fill been removed?
-
1.04 Is concrete covering all steel?
-
1.05 Have all excess pods been removed from site?
-
1.06 In your opinion has work been completed to standard?
-
1.07 Has drop edge beam finished to required standard?
-
Contact Concreter to render
-
1.08 Has excess concrete been spread and hosed appropriately?
-
Payment not to be approved until all excess concrete is removed or spread appropriately. No spillage is to be left to the side and rear boundary.
-
1.09 Is sediment control in place and is road free of sediment?
-
1.10 Is there a drop edge beam on this job?
-
Measure drop edge beams and send results to Fowler Office? (measure from top of slab to top of rebate)
-
1.11 Can this Job be paid?
-
Email this report to contractor to rectify any outstanding items prior to payment approval.
COMMENTS
-
Insert any further comments to note.
Sign off
-
Site Manager report completion sign off