Information
-
Site Address
-
Job No.
-
Conducted on
-
Prepared by
Kitchen Inspection
-
Kitchen 1
1.00 Kitchen 1
-
1.01 Have all cupboards been installed
-
1.02 Have all doors/draws been adjusted (check operation)
-
1.03 Is kitchen bulk head level?
-
1.04 Have all shelfs been installed
-
1.05 Have the cupboards been cleaned
-
1.06 Has all hardware been fitted
-
1.07 Have all fillers been installed
-
1.08 Has all waste been placed in designated area?
-
1.09 Has work area been swept?
-
1.10 Has the kicker been fitted correctly?
-
1.11 Take multiple pictures of completed kitchen and note scratches/damage, if any.
-
1.12 Has the cutlery tray been installed?
-
Kitchen 2
1.00 Kitchen 2
-
1.01 Have all cupboards been installed
-
1.02 Have all doors/draws been adjusted (check operation)
-
1.03 Is kitchen bulk head level?
-
1.04 Have all shelfs been installed
-
1.05 Have the cupboards been cleaned
-
1.06 Has all hardware been fitted
-
1.07 Have all fillers been installed
-
1.08 Has all waste been placed in designated area?
-
1.09 Has work area been swept?
-
1.10 Has the kicker been fitted correctly?
-
1.11 Take multiple pictures of completed kitchen and note scratches/damage, if any.
-
1.12 Has the cutlery tray been installed?
-
Bathroom 1
2.00 Bathroom 1
-
2.01 Have all cupboards been installed?
-
2.02 Have all doors been adjusted?
-
2.03 Have all shelfs been installed?
-
2.04 Have all fillers been installed?
-
2.05 Have the cupboards been cleaned?
-
2.06 Has all hardware been fitted?
-
2.07 Has all waste been placed in designated area?
-
2.08 Has work area been swept?
-
2.09 Take multiple pictures of completed bathroom and note scratches/damage, if any.
-
Bathroom 2
2.00 Bathroom 2
-
2.01 Have all cupboards been installed?
-
2.02 Have all doors been adjusted?
-
2.03 Have all shelfs been installed?
-
2.04 Have all fillers been installed?
-
2.05 Have the cupboards been cleaned?
-
2.06 Has all hardware been fitted?
-
2.07 Has all waste been placed in designated area?
-
2.08 Has work area been swept?
-
2.09 Take multiple pictures of completed bathroom and note scratches/damage, if any.
-
Bathroom 3
2.00 Bathroom 3
-
2.01 Have all cupboards been installed?
-
2.02 Have all doors been adjusted?
-
2.03 Have all shelfs been installed?
-
2.04 Have all fillers been installed?
-
2.05 Have the cupboards been cleaned?
-
2.06 Has all hardware been fitted?
-
2.07 Has all waste been placed in designated area?
-
2.08 Has work area been swept?
-
2.09 Take multiple pictures of completed bathroom and note scratches/damage, if any.
-
Bathroom 4
2.00 Bathroom 4
-
2.01 Have all cupboards been installed?
-
2.02 Have all doors been adjusted?
-
2.03 Have all shelfs been installed?
-
2.04 Have all fillers been installed?
-
2.05 Have the cupboards been cleaned?
-
2.06 Has all hardware been fitted?
-
2.07 Has all waste been placed in designated area?
-
2.08 Has work area been swept?
-
2.09 Take multiple pictures of completed bathroom and note scratches/damage, if any.
-
Ensuite 1
3.00 Ensuite 1
-
3.01 Have all cupboards been installed?
-
3.02 Have all doors been adjusted?
-
3.03 Have all shelfs been installed?
-
3.04 Have all fillers been installed?
-
3.05 Have the cupboards been cleaned?
-
3.06 Has all hardware been fitted?
-
3.07 Has all waste been placed in designated area?
-
Ensuite 2
3.00 Ensuite 2
-
3.01 Have all cupboards been installed?
-
3.02 Have all doors been adjusted?
-
3.03 Have all shelfs been installed?
-
3.04 Have all fillers been installed?
-
3.05 Have the cupboards been cleaned?
-
3.06 Has all hardware been fitted?
-
3.07 Has all waste been placed in designated area?
-
Ensuite 3
3.00 Ensuite 3
-
3.01 Have all cupboards been installed?
-
3.02 Have all doors been adjusted?
-
3.03 Have all shelfs been installed?
-
3.04 Have all fillers been installed?
-
3.05 Have the cupboards been cleaned?
-
3.06 Has all hardware been fitted?
-
3.07 Has all waste been placed in designated area?
-
Ensuite 4
3.00 Ensuite 4
-
3.01 Have all cupboards been installed?
-
3.02 Have all doors been adjusted?
-
3.03 Have all shelfs been installed?
-
3.04 Have all fillers been installed?
-
3.05 Have the cupboards been cleaned?
-
3.06 Has all hardware been fitted?
-
3.07 Has all waste been placed in designated area?
-
3.08 Has work area been swept?
-
3.09 Take multiple pictures of completed Ensuite and note scratches/damage, if any.
-
Powder Room
4.00 Powder Room
-
4.01 Have all cupboards been installed?
-
4.02 Have all doors been adjusted?
-
4.03 Have all shelfs been installed?
-
4.04 Have all fillers been installed?
-
4.05 Have the cupboards been cleaned?
-
4.06 Has all hardware been fitted?
-
4.07 Has all waste been placed in designated area?
-
4.08 Has work area been swept?
-
4.09 Take multiple pictures of completed Powder Room and note scratches/damage, if any.
-
Laundry
5.00 Laundry
-
5.01 Have all doors been fitted
-
5.02 Are all doors adjusted
-
5.03 Has all hardware been fitted
-
5.04 Take multiple pictures of completed Laundry and note scratches/damage, if any.
6.00 Internal Use Only
-
6.01 Can bench tops be installed? If yes contact lnstaller to book check measure
-
6.02 Can all work be paid?
-
Comments
-