Information

  • Site Address

  • Job No.

  • Conducted on

  • Prepared by

Kitchen Inspection

  • Kitchen 1

1.00 Kitchen 1

  • 1.01 Have all cupboards been installed

  • 1.02 Have all doors/draws been adjusted (check operation)

  • 1.03 Is kitchen bulk head level?

  • 1.04 Have all shelfs been installed

  • 1.05 Have the cupboards been cleaned

  • 1.06 Has all hardware been fitted

  • 1.07 Have all fillers been installed

  • 1.08 Has all waste been placed in designated area?

  • 1.09 Has work area been swept?

  • 1.10 Has the kicker been fitted correctly?

  • 1.11 Take multiple pictures of completed kitchen and note scratches/damage, if any.

  • 1.12 Has the cutlery tray been installed?

  • Kitchen 2

1.00 Kitchen 2

  • 1.01 Have all cupboards been installed

  • 1.02 Have all doors/draws been adjusted (check operation)

  • 1.03 Is kitchen bulk head level?

  • 1.04 Have all shelfs been installed

  • 1.05 Have the cupboards been cleaned

  • 1.06 Has all hardware been fitted

  • 1.07 Have all fillers been installed

  • 1.08 Has all waste been placed in designated area?

  • 1.09 Has work area been swept?

  • 1.10 Has the kicker been fitted correctly?

  • 1.11 Take multiple pictures of completed kitchen and note scratches/damage, if any.

  • 1.12 Has the cutlery tray been installed?

  • Bathroom 1

2.00 Bathroom 1

  • 2.01 Have all cupboards been installed?

  • 2.02 Have all doors been adjusted?

  • 2.03 Have all shelfs been installed?

  • 2.04 Have all fillers been installed?

  • 2.05 Have the cupboards been cleaned?

  • 2.06 Has all hardware been fitted?

  • 2.07 Has all waste been placed in designated area?

  • 2.08 Has work area been swept?

  • 2.09 Take multiple pictures of completed bathroom and note scratches/damage, if any.

  • Bathroom 2

2.00 Bathroom 2

  • 2.01 Have all cupboards been installed?

  • 2.02 Have all doors been adjusted?

  • 2.03 Have all shelfs been installed?

  • 2.04 Have all fillers been installed?

  • 2.05 Have the cupboards been cleaned?

  • 2.06 Has all hardware been fitted?

  • 2.07 Has all waste been placed in designated area?

  • 2.08 Has work area been swept?

  • 2.09 Take multiple pictures of completed bathroom and note scratches/damage, if any.

  • Bathroom 3

2.00 Bathroom 3

  • 2.01 Have all cupboards been installed?

  • 2.02 Have all doors been adjusted?

  • 2.03 Have all shelfs been installed?

  • 2.04 Have all fillers been installed?

  • 2.05 Have the cupboards been cleaned?

  • 2.06 Has all hardware been fitted?

  • 2.07 Has all waste been placed in designated area?

  • 2.08 Has work area been swept?

  • 2.09 Take multiple pictures of completed bathroom and note scratches/damage, if any.

  • Bathroom 4

2.00 Bathroom 4

  • 2.01 Have all cupboards been installed?

  • 2.02 Have all doors been adjusted?

  • 2.03 Have all shelfs been installed?

  • 2.04 Have all fillers been installed?

  • 2.05 Have the cupboards been cleaned?

  • 2.06 Has all hardware been fitted?

  • 2.07 Has all waste been placed in designated area?

  • 2.08 Has work area been swept?

  • 2.09 Take multiple pictures of completed bathroom and note scratches/damage, if any.

  • Ensuite 1

3.00 Ensuite 1

  • 3.01 Have all cupboards been installed?

  • 3.02 Have all doors been adjusted?

  • 3.03 Have all shelfs been installed?

  • 3.04 Have all fillers been installed?

  • 3.05 Have the cupboards been cleaned?

  • 3.06 Has all hardware been fitted?

  • 3.07 Has all waste been placed in designated area?

  • Ensuite 2

3.00 Ensuite 2

  • 3.01 Have all cupboards been installed?

  • 3.02 Have all doors been adjusted?

  • 3.03 Have all shelfs been installed?

  • 3.04 Have all fillers been installed?

  • 3.05 Have the cupboards been cleaned?

  • 3.06 Has all hardware been fitted?

  • 3.07 Has all waste been placed in designated area?

  • Ensuite 3

3.00 Ensuite 3

  • 3.01 Have all cupboards been installed?

  • 3.02 Have all doors been adjusted?

  • 3.03 Have all shelfs been installed?

  • 3.04 Have all fillers been installed?

  • 3.05 Have the cupboards been cleaned?

  • 3.06 Has all hardware been fitted?

  • 3.07 Has all waste been placed in designated area?

  • Ensuite 4

3.00 Ensuite 4

  • 3.01 Have all cupboards been installed?

  • 3.02 Have all doors been adjusted?

  • 3.03 Have all shelfs been installed?

  • 3.04 Have all fillers been installed?

  • 3.05 Have the cupboards been cleaned?

  • 3.06 Has all hardware been fitted?

  • 3.07 Has all waste been placed in designated area?

  • 3.08 Has work area been swept?

  • 3.09 Take multiple pictures of completed Ensuite and note scratches/damage, if any.

  • Powder Room

4.00 Powder Room

  • 4.01 Have all cupboards been installed?

  • 4.02 Have all doors been adjusted?

  • 4.03 Have all shelfs been installed?

  • 4.04 Have all fillers been installed?

  • 4.05 Have the cupboards been cleaned?

  • 4.06 Has all hardware been fitted?

  • 4.07 Has all waste been placed in designated area?

  • 4.08 Has work area been swept?

  • 4.09 Take multiple pictures of completed Powder Room and note scratches/damage, if any.

  • Laundry

5.00 Laundry

  • 5.01 Have all doors been fitted

  • 5.02 Are all doors adjusted

  • 5.03 Has all hardware been fitted

  • 5.04 Take multiple pictures of completed Laundry and note scratches/damage, if any.

6.00 Internal Use Only

  • 6.01 Can bench tops be installed? If yes contact lnstaller to book check measure

  • 6.02 Can all work be paid?

  • Comments

  • Site Manager Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.