Information

  • Site Address

  • Job No.

  • Conducted on

  • Prepared by

General

  • 1.01 Is site fencing intact? (No Damage)

  • 1.02 Was gate locked?

  • 1.03 All rubbish in designated area?

  • 1.04 Has ground and first floor been swept?

  • 1.05 Has all left over material been stacked neatly?

Tiling Inspection

  • Front Patio

2.00 Front Patio

  • 2.02 Is brickwork and front door free from tiling residue?

  • 2.01 Have all tiles been layed to standard?

  • Main Floor Area

3.00 Main Floor Area

  • 3.01 Is tiling free from lipping?

  • 3.02 Is Grout color consistent throughout?

  • 3.03 Has excess grout been cleaned off tiles?

  • 3.04 Are tracks to sliding or bifold doors free from tiling residue?

  • Laundry

4.00 Laundry

  • 4.01 Have all tiles been layed to standard?

  • 4.02 Is tiling free from lipping?

  • 4.03 Has excess grout been cleaned off tiles?

  • 4.04 Has floor waste been protected during tiling? (note: scratched floor waste will require replacement prior to handover)

  • 4.05 Is tile threshold to external door sloping outwards?

  • Bathroom 1

5.00 Bathroom 1

  • 5.01 Have all tiles been layed to standard?

  • 5.02 Is tiling free from lipping?

  • 5.03 Has excess grout been cleaned off tiles?

  • 5.04 Has floor waste been protected during tiling? (note: scratched floor waste will require replacement prior to handover)

  • 5.05 Is there adequate fall to shower recess floor?

  • 5.06 Have all tile trim to niches and bathtub been cut and installed without lipping or sharp edges?

  • 5.07 Will cut out around plumbing points be covered by plumbing fixtures? i.e. spouts and shower heads

  • 5.08 Has adequate gap been left between window and door architraves free from grout and glue?

  • 5.09 Are waste pipes free from tiling debris/residue? (inspection required by unscrewing floor waste)

  • 5.10 Are GPO's in adequate location?

  • 5.11 Will skirting tile effect installation of toilet suite?

  • Bathroom 2

6.00 Bathroom 2

  • 6.01 Have all tiles been layed to standard?

  • 6.02 Is tiling free from lipping?

  • 6.03 Has excess grout been cleaned off tiles?

  • 6.04 Has floor waste been protected during tiling? (note: scratched floor waste will require replacement prior to handover)

  • 6.05 Is there adequate fall to shower recess floor?

  • 6.06 Have all tile trim to niches and bathtub been cut and installed without lipping or sharp edges?

  • 6.07 Will cut out around plumbing points be covered by plumbing fixtures? i.e. spouts and shower heads

  • 6.08 Has adequate gap been left between window and door architraves free from grout and glue?

  • 6.09 Are waste pipes free from tiling debris/residue? (inspection required by unscrewing floor waste)

  • 6.10 Are GPO's in adequate location?

  • 6.11 Will skirting tile effect installation of toilet suite?

  • Ensuite 1

7.00 Ensuite 1

  • 7.01 Have all tiles been layed to standard?

  • 7.02 Is tiling free from lipping?

  • 7.03 Has excess grout been cleaned off tiles?

  • 7.04 Has floor waste been protected during tiling? (note: scratched floor waste will require replacement prior to handover)

  • 7.05 Is there adequate fall to shower recess floor?

  • 7.06 Have all tile trim to niches and bathtub been cut and installed without lipping or sharp edges?

  • 7.07 Will cut out around plumbing points be covered by plumbing fixtures? i.e. spouts and shower heads

  • 7.08 Has adequate gap been left between window and door architraves free from grout and glue?

  • 7.09 Are waste pipes free from tiling debris/residue? (inspection required by unscrewing floor waste)

  • 7.10 Are GPO's in adequate location?

  • 7.11 Will skirting tile effect installation of toilet suite?

  • Ensuite 2

8.00 Ensuite 2

  • 8.01 Have all tiles been layed to standard?

  • 8.02 Is tiling free from lipping?

  • 8.03 Has excess grout been cleaned off tiles?

  • 8.04 Has floor waste been protected during tiling? (note: scratched floor waste will require replacement prior to handover)

  • 8.05 Is there adequate fall to shower recess floor?

  • 8.06 Have all tile trim to niches and bathtub been cut and installed without lipping or sharp edges?

  • 8.07 Will cut out around plumbing points be covered by plumbing fixtures? i.e. spouts and shower heads

  • 8.08 Has adequate gap been left between window and door architraves free from grout and glue?

  • 8.09 Are waste pipes free from tiling debris/residue? (inspection required by unscrewing floor waste)

  • 8.10 Are GPO's in adequate location?

  • 8.11 Will skirting tile effect installation of toilet suite?

  • Back Patio/Alfresco Area

9.00 Back Patio

  • 9.01 Have all tiles been layed to standard?

  • 9.02 Is brickwork/door free from tiling residue?

Comments

  • In your opinion, has work been completed in a clean and proficient manner?

  • Can this job be paid?

  • Comments

  • Supervisor Sign off

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.