Information

  • Site Address

  • Job No.

  • Conducted on

  • Prepared by

Pre-commencement Report

1.01 Demolition

  • Have all Demolition works been completed?

  • If No, Client to advise of Demolition date

1.02 Rubbish/Debris

  • Has all Rubbish/debris been removed?

  • If No, Client to advise of removal date.

  • Please note approximate loads

1.03 Grass/vegetation

  • Has all Grass/vegetation been cut prior to starting work?

  • If No, Client to advise of removal date.

  • Please note approximate height of grass (m)

1.04 Trees

  • Have all trees on site been removed prior to starting work?

  • If No, Client to advise of removal date.

  • Please note number of trees to be removed

1.05 Footpath

  • Is footpath free of Damage? (take photographs to note)

  • If No, Client to note.

1.06 Kerb & Gutter

  • Is the kerb & gutter free of damage? (take photographs to note)

  • If No, Client to note.

1.07 Boundary Fence

  • Is the boundary fence free of damage? (take pic to note)

  • If No, Client to note.

1.08 Fill

  • Does site require extra fill to be imported?

  • Please note approx loads & CSC to check contract for PA?

  • Extra costs may be incurred. Client to be requested to be present on date of importation to monitor.

1.09 Rock Shelf

  • Are there any visible signs of presence of rock shelf?

  • Extra costs may be incurred for Rock sawing/breaking and removal. Check Geotech report.

  • If Yes, take photograph(s)

1.11 Cranes

  • Extra cranes required?

  • State reason(s) for extra crane?

  • Which deliveries would require extra cranes?

  • CSC to advise client of excess costs may be incurred for double handling and crane hire. Verify contract for PA.

1.10 Power lines

  • Power lines-tiger tail insulation required?(If unsure notify WHS Manager for safety assessment)

  • WHS Manager to assess, please ensure clear wide angle photographs are taken of area of concern.

  • If Yes, please select of area cable insulation.<br>

  • If Yes, excess costs may be incurred. Check contract for PA.

1.12 Traffic Control

  • Is traffic control required

  • Give reasons why traffic control may be required?

  • if Yes, check contract for PA, excess costs may be incurred.

1.13 Retaining Walls

  • Is a retaining wall required following site excavation?

  • If Yes Fowler to assess and CSC to immediately advise client

  • Note: Excavations over 1m in depth will not start unless there is prior consultation with Fowler Homes Pty Ltd

COMMENTS

  • Comments/recommendations

Site Manager Sign off

  • I the Site Manager of above mentioned site certify items raised in this report are true and correct as of date stated on report.

Internal Use Only

2.00 Internal Use Only

  • Is site within 1km of the ocean or non surf coast?(if yes check contract and selections)

  • Is site classified as tight site?(if Yes what trades will be affected?)

  • Sewer affected? (supervisor to check plans, if Yes ensure all plans are correct)

  • Are all pegs in place?

  • Please note number of pegs needed

  • Is Tree protection zone required? (refer to DA condition)

  • Acquire appropriate signage from WHS Manager, ensure you sketch on Fence/barricade layout.

  • Is existing boundary fencing 1.8m high?

  • Fencing ordered?

  • Sketch boundary where temporary fence is required, please note if shade clothe is required

  • All weather access on site ordered?

  • Water on site?

  • Have you organized Safety Signage, Padlock and WHS Management Plan for site? (advise WHS Manager)

  • Have you organised Fowler Homes promotional signage?

  • Is site in close proximity to school or park?(if Yes notify WHS Manager)

  • Is traffic management plan required? (refer to DA condition)

  • Will scaffold require shade cloth?(if Yes notify scaffolder)

  • Would normal deliveries be affected due to site conditions? (internal note: if Yes, supervisor to contact transport company prior to frame, brick, steel and sand deliveries)

  • Does site have existing pool?

  • Pool is to be barricaded during site works, please inform WHS Manager.

  • Does set back requirement require pinning of slab for brickwork? (pinning required when boundary setback is less than 950, allowance for render to be made on site)

  • I have read and understood all items on DA or CDC conditions

  • General Comments, regarding DA/CDC conditions.

CSC Sign Off

  • CSC to sign once read and actioned

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.