Information

  • Site Address

  • Job No.

  • Conducted on

  • Prepared by

Safety/General

Carpenter Details

  • Carpenter Company used on this job?

  • Other, please note carpenter company if not on list.

General/Safety

  • 1.01 Have you received a copy of the bracing detail? (Located in Job file under Construction/Bracing Detail)

  • 1.02 Is site fencing intact? (No Damage)

  • 1.03 Was Gate Locked?

  • 1.04 Has all rubbish been placed in designated area including food scraps?

  • 1.05 Has Timber Clean been conducted?

  • Book Timber Clean

Ground Floor

Pre Brick/Frame Inspection (Ground Floor)

  • Have all steel beams been adequately propped by scaffold?(T-bars over 3.6m to be propped by scaffold)

  • Have all trusses been installed?

  • Have all remaining timbers been stacked neatly?

  • 1.28 Have you confirmed front entry door Brick dimensions?(note: verify dimensions for pivot door)

  • 1.24 Has steel posts been braced within straps and blocked out with timber?

  • 1.25 Are steel posts adequately bolted/welded?

  • 1.26 Will top plates to steel posts interfere with cornice/square set?(check type of cornice)

  • 1.27 Are all dyna bolts adequately secured? (check for adequate washers)

  • 1.23 Are all noggins in place?

  • 1.17 Have bulkheads been installed correctly? (Note: Some Bulkheads to be supplied by frame manufacturer and installed by frame carpenter)

  • 1.06 Are all windows/sliding doors installed?

  • 1.30 Have all windows been installed with galvanized bullet head nails? (note: collated framing nails are not acceptable)

  • 1.08 Are sliding door sashes stacked neatly and secured?

  • 1.09 Are there any scratches to glass panels?

  • Complete iAuditor Back Charge Report and forward to relevant contractor

  • 1.10 Are there any scratches/dents to all frames?

  • Complete iAuditor Back Charge Report and forward to relevant contractor

  • 1.11 Are sliding door tracks protected?

  • 1.13 Has rough in been completed?

  • 1.20 Has bracing and triple grips been installed correctly? (lower roof)

  • 1.29 If niches are external walls, have they been blocked prior to brickwork?

  • 1.22 Have double triple grips been installed to girder trusses? (lower roof)

  • 1.31 Have you accounted for any light points to brick piers? (Check electrical layout)

  • 1.05 Can brickwork be started without pinning for brickwork? Note: less than 950

  • if No, you must book Surveyor

  • Has ground floor been swept and left over material stacked neatly?

  • 1.07 Are there any carpentry items on the ground floor that have not been completed? (write list if applicable)

First Floor

Pre Brick/Frame Inspection (First Floor)

  • Is void protection in place and ladder secured? (note: Ladder must protrude 900mm above platform)

  • Have all trusses been installed?

  • 1.23 Are all noggins in place?

  • 1.17 Have bulkheads been installed correctly? (Note: Some Bulkheads to be supplied by frame manufacturer and installed by frame carpenter)

  • 1.18 Has manhole been installed and location identified?

  • 1.06 Are all windows/sliding doors installed?

  • 1.30 Have all windows been installed with galvanized bullet head nails? (note: collated framing nails are not acceptable)

  • 1.08 Are sliding door sashes stacked neatly and secured?

  • 1.09 Are there any scratches to glass panels?

  • Complete iAuditor Back Charge Report and forward to relevant contractor

  • 1.10 Are there any scratches/dents to all frames?

  • Complete iAuditor Back Charge Report and forward to relevant contractor

  • 1.11 Are sliding door tracks protected?

  • 1.13 Has rough in been completed?

  • 1.23 Are all noggins in place?

  • 1.16 Have change of direction blocks been installed?

  • 1.20 Has bracing and triple grips been installed correctly?

  • 1.22 Have double triple grips been installed to girder trusses?

  • Have all bracing straps been tightened and secured to framework?

  • 1.21 Have all shear blocks been installed?

  • 1.29 If niches are external walls, have they been blocked prior to brickwork?

  • Has high load brackets been adequately bolted?

  • Has Dwarf wall to void been adequately secured? (stand alone dwarf wall is to be secured beyond flooring to LVL below)

  • 1.15 Has safety handrail been used on job?

  • 1.07 Are there any carpentry items that have not been completed? (write list if applicable)

  • Has first floor been swept and left over material stacked neatly?

COMMENTS

  • Can This Job be Paid?

  • Insert Any Comments

SIGN OFF

  • Site Manager Name

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.