Information

  • Site Address

  • Job No.

  • Conducted on

  • Prepared by

General

  • 1.01 Is site fencing intact? (No Damage)

  • 1.02 Was gate locked?

  • 1.03 All rubbish in designated area?

  • 1.04 Has ground and first floor been swept?

  • 1.05 Has all left over material been stacked neatly?

  • 1.06 Has leftover material been picked up for recycling?

Gyprock Inspection

Note: Use hard lead pencil to mark all areas of concern

  • 2.01 Have you checked all setting Joints?

  • 2.02 Are all joint compounds free from tool marks and ridges?

  • 2.03 Are all internal and external corners free from pin holes?

  • 2.04 Are External angles adjacent to kitchen cupboards plumb, including bulkhead? (Note: plaster cornices are defective if they deviate from a straight line greater than 4mm over a length of up to 2m)

  • 2.05 Have you checked extent of tiling in wet areas?(Note: if tiling to ceiling, cornice to be installed after tiling)

  • 2.06 In your opinion, has work been completed in a clean and proficient manner?

  • 2.07 Can this Job be paid?

  • 2.08 General Comments

  • Site Manager Sign off

This inspection is based on AS/NZS 2589.1 Gypsum linings in Residential and light Commercial construction - application and finishing-Gypsum plasterboard level 4 finish

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.