Title Page
Post-tensioning ITP Installation
-
Client
-
Post-tensioning Concrete Pour ITP prepared by
-
Project Name
-
Project Number
-
Level and pour number
-
Concrete Pour Date
-
Location
-
This Post-tensioning Inspection & Test Plan (ITP) must be completed for each individual post-tensioned concrete pour.
Attendance during the concrete pour
-
Did an SRG employee attend the concrete pour?
Post-tensioning Installation
-
Was monitored and maintained as far as possible.
-
Was secured to prevent displacement and damage.
-
The Anchors and ducting were sealed to prevent contamination.
Other trades used measures to protect tendons.
-
Chair support for pump lines were used.
-
Pans were kept free and clear of concrete.
-
Grout tubes were undamaged.
-
There was adequate vibration around the anchors and dead-ends.
-
Did any damage occur to the post-tensioning tendons during concrete placement or screeding?
Issues during concrete pour.
-
Did any issues arise during the concrete pour that would compromise the post-tensioning system?
-
SRG Leading Hand
-
Main Contractor