Title Page

  • Site conducted

Post-tensioning ITP Installation

  • Client

  • Post-tensioning Concrete Pour ITP prepared by

  • Project Name

  • Project Number

  • Level and pour number

  • Concrete Pour Date

  • Location
  • This Post-tensioning Inspection & Test Plan (ITP) must be completed for each individual post-tensioned concrete pour.

Attendance during the concrete pour

  • Did an SRG employee attend the concrete pour?

Post-tensioning Installation

  • Was monitored and maintained as far as possible.

  • Was secured to prevent displacement and damage.

  • The Anchors and ducting were sealed to prevent contamination.

Other trades used measures to protect tendons.

  • Chair support for pump lines were used.

  • Pans were kept free and clear of concrete.

  • Grout tubes were undamaged.

  • There was adequate vibration around the anchors and dead-ends.

  • Did any damage occur to the post-tensioning tendons during concrete placement or screeding?

Issues during concrete pour.

  • Did any issues arise during the concrete pour that would compromise the post-tensioning system?

undefined

  • SRG Leading Hand

  • Main Contractor

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.