Title Page
-
Site conducted
-
Project
-
Conducted on
-
Prepared by
-
Location
-
Zone
VERIFICATION:
-
Construction drawings approved for use
-
Material approved for use
-
Material Supplier
-
Material Brand
PIPE WORK
-
Pipe work installed as per drawing
-
Pipe Bracketed as required
-
All pipe work completed in area
-
Pipe labels fitted as required
OUTLETS
-
All outlets installed
-
Outlets and control valves installed at correct height
-
All outlets and control valves firmly secured
Final Checks:
-
Pipe work not touching metal frames
-
Hot water pipe work insulated
-
All pipe work fastened and secured correctly
-
Pressure tester and checked for leaks
-
Test pressure KPA
Notes, Date and Signature
-
Notes:
-
Checked By:
-
Date: