Title Page

  • Site conducted

  • Project

  • Conducted on

  • Prepared by

  • Location

  • Zone

VERIFICATION:

  • Construction drawings approved for use

  • Material approved for use

  • Material Supplier

  • Material Brand

PIPE WORK

  • Pipe work installed as per drawing

  • Pipe Bracketed as required

  • All pipe work completed in area

  • Pipe labels fitted as required

OUTLETS

  • All outlets installed

  • Outlets and control valves installed at correct height

  • All outlets and control valves firmly secured

Final Checks:

  • Pipe work not touching metal frames

  • Hot water pipe work insulated

  • All pipe work fastened and secured correctly

  • Pressure tester and checked for leaks

  • Test pressure KPA

Notes, Date and Signature

  • Notes:

  • Checked By:

  • Date:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.