Information

  • Conducted on

  • Project Network #

  • Drawing #

  • Project Name

  • Location

Project Type

  • Customer Managed (Turnkey)

  • Type of Customer Managed (Turnkey) Project

  • Description of 'Other'

  • Network Owner Managed

  • Type of Network Owner Managed Project

  • Network Owner

  • Client

CONTACT DETAILS (To be completed prior to audit)

  • Network Project Manager

  • Phone #

  • Mobile #

  • Email Address

  • Client

  • Email Address

  • Phone #

  • Mobile #

  • Electrical Constructor

  • Email Address

  • Mobile #

  • Phone #

  • Civil Contractor

  • Phone #

  • Mobile #

  • Email Address

  • Auditor

  • Phone #

  • Mobile #

  • Email Address

ASSESSMENT DETAILS

  • Work Group

  • Audited By

  • Construction Rep. Involved

  • Auditor Name

  • Initiator

  • Audit Date

  • PROJECT SCOPE (Description of the Assets to be Installed)

  • Comments

  • Auditor

  • Title

  • Declaration: This project is completed and complies with all relevant Network Technical Standards. I understand the “As Built” details are a “Hold Point” and are required prior to my signoff of this audit.

  • Name, Date, Signature

  • Title

Checklist

  • To be conducted prior to connecting to the network

Activity/Items Completed

DOCUMENTS

  • LV Cable Test Results and Clearance

  • QTY

  • Initials

  • Date

  • Comments

  • Compliant?

  • New asset details recorded on plan prior to cover/backfill

  • Compliant?

  • QTY

  • Initials

  • Date

  • Comments

CABLES & CONDUITS (at open trench)

  • Type and size as specified on NETWORK Approved Plan/Standard

  • QTY

  • Initials

  • Date

  • Comments

  • Compliant?

  • DEPTH & OFFSET- Compliant with NETWORK Approved Plan and final surface level

  • Comments

  • Compliant?

  • QTY

  • Initials

  • Date

  • Correct separation from other utility assets

  • Initials

  • Date

  • Comments

  • Compliant?

  • QTY

  • Warning tape installed 300 +/- 50mm from final surface level

  • Compliant?

  • QTY

  • Initials

  • Date

  • Comments

  • Slabs cover cables by a min of 40mm each side

  • Initials

  • Date

  • Comments

  • Compliant?

  • QTY

  • Backfill & Final level reinstatement Completed

  • Compliant?

  • QTY

  • Initials

  • Date

  • Comments

PITS

  • Entry conduits installed (min 100mm into pit)

  • Compliant?

  • QTY

  • Initials

  • Date

  • Comments

  • Bodies not distorted, lid installed, free of rubble.

  • Compliant?

  • QTY

  • Initials

  • Date

  • Comments

  • ‘N’ Tags Fitted

  • Compliant?

  • QTY

  • Initials

  • Date

  • Comments

  • Location correct

  • Compliant?

  • QTY

  • Initials

  • Date

  • Comments

SAND & SLAB (at open trench)

  • Correct sand type & depth when compacted

  • QTY

  • Initials

  • Date

  • Comments

  • Compliant?

  • Free of rocks, sharp or foreign objects

  • Compliant?

  • QTY

  • Initials

  • Date

  • Comments

STREET LIGHT POLES

  • Correct depth and Straight

  • Compliant?

  • QTY

  • Initials

  • Date

  • Comments

  • Protective covers extend over cables by a min of 40mm each side

  • Compliant?

  • QTY

  • Initials

  • Date

  • Comments

  • Cables protected at pole entry and terminated

  • Compliant?

  • QTY

  • Date

  • Initials

  • Comments

  • Triangular keyed locks

  • Compliant?

  • QTY

  • Initials

  • Date

  • Comments

  • Fuse removed

  • Compliant?

  • QTY

  • Initials

  • Date

  • Comments

  • Earths installed

  • Compliant?

  • QTY

  • Initials

  • Date

  • Comments

  • ‘N’ Tags & Labels fitted

  • Compliant?

  • QTY

  • Initials

  • Date

  • Comments

CABLE HEAD POLES

  • Cable Guards & Labels Fitted

  • Compliant?

  • QTY

  • Initials

  • Date

  • Comments

  • ‘N’ Tags Fitted

  • Compliant?

  • QTY

  • Initials

  • Date

  • Comments

PILLARS

  • Correct Depth & Straight

  • Compliant?

  • QTY

  • Initials

  • Date

  • Comments

  • Cables securely terminated

  • Initials

  • Date

  • Comments

  • Compliant?

  • QTY

  • ‘N’ Tags Fitted

  • Compliant?

  • QTY

  • Initials

  • Date

  • Comments

  • Earths Installed

  • Compliant?

  • QTY

  • Initials

  • Date

  • Comments

  • Bollards Installed

  • QTY

  • Initials

  • Date

  • Comments

  • Compliant?

  • Seals/locks fitted and Switch Locked

  • Compliant?

  • Initials

  • QTY

  • Select date

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.