Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Location
-
Civil Workers on site
-
Is the pit located in the correct position?
-
Corrective action required
-
Compliant
-
Is the pit trenched to agreed pole?
-
Corrective action required
-
Compliant
-
Cable depth at 600mm or >450mm? (use cable locator/depth indicator or push probe)
-
Corrective action required
-
Complaint
-
Conduit entry into Pit (75mm +/- 25mm)
-
Corrective action required
-
Compliant
-
Is 63mm orange conduit installed?
-
Corrective action required
-
Complaint
-
Is marker tape installed? (300mm+/- 50mm) from ground level
-
Corrective action required
-
Compliant
-
Is pit installed correctly and without trip hazards?
-
Corrective action required
-
Compliant
-
Is pit encased with 150mm (min) concrete?
-
Corrective action required
-
Compliant
-
Is the footpath reinstated with cold mix and safe?
-
Corrective action required
-
Compliant
-
Is the nature strip area reinstated correctly & safe?
-
Complaint
-
Corrective action required
-
Are pole guards installed at correct height of 2610 - 2700mm above finished ground level (300mm below)?
-
Corrective action required
-
Compliant
-
Is a warning sticker attached at approximately 1500mm?
-
Corrective action required
-
Compliant
-
Is grey PVC conduit installed on pole?
-
Corrective action required
-
Compliant
-
Does grey conduit on pole extend approximately 1000mm beyond the pole guard?
-
Corrective action required
-
Compliant
-
Are cable guards secured with galvanised coach screws? (timber pole)
-
Compliant
-
Corrective Action Required
-
Are cable guards secured with banded straps (concrete pole)?
-
Corrective Action Required
-
Compliant
-
Is the cable capped at both ends?
-
Corrective Action Required
-
Compliant
-
Has the correct size cable been installed (16mm2 or 50mm2 XLPE)?
-
Corrective Action Required
-
Compliant
-
Does the Map & Distances including offsets correspond?
-
Corrective Action Required
-
Compliant
-
General Comments
-
Road Type
-
Length
-
Width
-
Driveway Type
-
Length
-
Width
-
Footpath Type
-
Length
-
Width
-
Audit Prepared By
Second Audit
-
2nd Audit Completed?
-
Select date
-
Compliant?
-
Second Audit Completed by
-
File Closed by