Information
-
Conducted on
-
Project Network #
-
Drawing #
-
Project Name
-
Location
Project Type
-
Customer Managed (Turnkey)
-
Type of Customer Managed (Turnkey) Project
-
Description of 'Other'
-
Network Owner Managed
-
Type of Network Owner Managed Project
-
Network Owner
-
Client
CONTACT DETAILS (To be completed prior to audit)
-
Network Project Manager
-
Phone #
-
Mobile #
-
Email Address
-
Client
-
Email Address
-
Phone #
-
Mobile #
-
Electrical Constructor
-
Email Address
-
Mobile #
-
Phone #
-
Civil Contractor
-
Phone #
-
Mobile #
-
Email Address
-
Auditor
-
Phone #
-
Mobile #
-
Email Address
ASSESSMENT DETAILS
-
Initiator
-
Audit Date
-
Work Group
-
Audited By
-
Construction Rep. Involved
-
Auditor Name
-
PROJECT SCOPE (Description of the Assets to be Installed)
Checklist
-
Audit (To be completed at Open Trench prior to being covered)
SITE REFERENCES
-
Lot boundaries identified
-
Compliant?
-
Quantity
-
Initials
-
Date
-
Comments
-
Lot boundaries identified
-
Compliant?
-
Quantity
-
Initials
-
Date
-
Comments
-
Lot boundaries identified
-
Compliant?
-
Quantity
-
Initials
-
Date
-
Comments
TRENCH
-
WIDTH - To design specification eg. shared use
-
Compliant?
-
Quantity
-
Initials
-
Date
-
Comments
-
DEPTH - Compliant with NETWORK Approved Plan and final level
-
Compliant?
-
Quantity
-
Initials
-
Date
-
Comments
-
OFFSET - Alignment correct
-
Compliant?
-
Quantity
-
Initials
-
Date
-
Comments
-
DEVIATION - No unapproved route deviations
-
Compliant?
-
Quantity
-
Initials
-
Date
-
Comments
-
Free of rocks, sharp or foreign objects prior to bedding sand
-
Compliant?
-
Quantity
-
Initials
-
Date
-
Comments
-
Correct size joint holes
-
Compliant?
-
Quantity
-
Initials
-
Date
-
Comments
BEDDING SAND
-
Correct depth when compacted
-
Compliant?
-
Quantity
-
Initials
-
Date
-
Comments
-
Correct grade/type
-
Compliant?
-
Quantity
-
Initials
-
Date
-
Comments
-
Free of rocks, sharp or foreign objects
-
Compliant?
-
Quantity
-
Initials
-
Date
-
Comments
CONDUIT
-
Correct size and category as per Tech. Std.
-
Compliant?
-
Quantity
-
Initials
-
Date
-
Comments
-
DEPTH - Compliant with NETWORK Approved Plan and final level
-
Compliant?
-
Quantity
-
Initials
-
Date
-
Comments
-
Road crossing - Telco separation (100mm LV) (300mm HV) & Tape
-
Compliant?
-
Quantity
-
Initials
-
Date
-
Comments
-
Road crossing extension into trench (min 100mm)
-
Compliant?
-
Quantity
-
Initials
-
Date
-
Comments
-
All conduit joints are glued
-
Compliant?
-
Quantity
-
Initials
-
Date
-
Comments
-
Warning tape installed 300 +/- 50mm from final surface level
-
Compliant?
-
Quantity
-
Initials
-
Date
-
Comments
-
Spare/future conduits capped or sealed, draw wire/rod installed
-
Compliant?
-
Quantity
-
Initials
-
Date
-
Comments
CABLES
-
Type and size as specified on NETWORK Approved Plan
-
Compliant?
-
Quantity
-
Initials
-
Date
-
Comments
-
DEPTH & OFFSET - Compliant with NETWORK Approved Plan and final surface level
-
Compliant?
-
Quantity
-
Initials
-
Date
-
Comments
-
Laid in correct order & with correct circuit separation
-
Compliant?
-
Quantity
-
Initials
-
Date
-
Comments
-
Correct separation and Clearance from other utility assets in the trench and at crossings
-
Compliant?
-
Quantity
-
Initials
-
Date
-
Comments
JOINTS & TERMINATIONS
-
Joints located >5m from any property boundary
-
Compliant?
-
Quantity
-
Initials
-
Date
-
Comments
-
Cable sealed/insulated located as per Approved Plan
-
Compliant?
-
Quantity
-
Initials
-
Date
-
Comments
-
Joints completed
-
Compliant?
-
Quantity
-
Initials
-
Date
-
Comments
AS-LAID DETAILS
-
New asset details recorded prior to cover/backfill
-
Compliant?
-
Quantity
-
Initials
-
Date
-
Comments
-
All Joints, Duct Ends, and Road Crossings details recorded prior to cover/backfill
-
Compliant?
-
Quantity
-
Initials
-
Date
-
Comments
-
Supporting digital photographs recorded/attached?
-
Compliant?
-
Quantity
-
Initials
-
Date
-
Comments
SAND AND SLAB
-
Correct depth when compacted
-
Compliant?
-
Quantity
-
Initials
-
Date
-
Comments
-
Correct grade/type
-
Compliant?
-
Quantity
-
Initials
-
Date
-
Comments
-
Free of rocks, sharp or foreign objects
-
Compliant?
-
Quantity
-
Initials
-
Date
-
Comments
-
Protective cable covers correctly located over all cables
-
Compliant?
-
Quantity
-
Initials
-
Date
-
Comments
-
Warning tape installed 300 +/- 50mm from final surface level
-
Compliant?
-
Quantity
-
Initials
-
Date
-
Comments
-
Partial backfill completed to prevent disturbance of protective covers by other service providers
-
Compliant?
-
Quantity
-
Initials
-
Date
-
Comments
SUBSTATION SITE (Where specified)
-
Free of all other underground assets
-
Compliant?
-
Quantity
-
Initials
-
Date
-
Comments
-
Foundation installed and level & located correctly within site
-
Compliant?
-
Quantity
-
Initials
-
Date
-
Comments
-
20mm Screenings laid.
-
Compliant?
-
Quantity
-
Initials
-
Date
-
Comments
-
If specified: retaining wall, batter & drainage installed
-
Compliant?
-
Quantity
-
Initials
-
Date
-
Comments
-
Substation construction correct
-
Compliant?
-
Quantity
-
Initials
-
Date
-
Comments
-
Labels and signs fitted inside and external
-
Compliant?
-
Quantity
-
Initials
-
Date
-
Comments
-
Cables connected to correct circuits as per NETWORK Approved Plan
-
Compliant?
-
Quantity
-
Initials
-
Date
-
Comments
-
Cables terminated and Secure
-
Compliant?
-
Quantity
-
Initials
-
Date
-
Comments
-
HV Insulated caps available for spare switches
-
Compliant?
-
Quantity
-
Initials
-
Date
-
Comments
-
Earths installed (Correct Type)
-
Compliant?
-
Quantity
-
Initials
-
Date
-
Comments
-
Earth Tests recorded
-
Compliant?
-
Quantity
-
Initials
-
Date
-
Comments
-
Correct fuses available
-
Compliant?
-
Quantity
-
Initials
-
Date
-
Comments
-
MEN point labelled
-
Compliant?
-
Quantity
-
Initials
-
Date
-
Comments
-
Neutrals Tagged
-
Compliant?
-
Quantity
-
Initials
-
Date
-
Comments
-
Breather Plugs Removed
-
Compliant?
-
Quantity
-
Initials
-
Date
-
Comments
-
Dead End Receptacles
-
Compliant?
-
Quantity
-
Initials
-
Date
-
Comments
-
HV Switchgear Locks installed
-
Compliant?
-
Quantity
-
Initials
-
Date
-
Comments
-
Fusing Mechanisms secure
-
Compliant?
-
Quantity
-
Initials
-
Date
-
Comments
-
Door Locks installed
-
Compliant?
-
Quantity
-
Initials
-
Date
-
Comments
-
240mm LV Cable using Webber ‘Z’ Tags
-
Compliant?
-
Quantity
-
Initials
-
Date
-
Comments
-
Fault Indicators Installed
-
Compliant?
-
Quantity
-
Initials
-
Date
-
Comments
PUBLIC LIGHTING
-
Depth/Offset as per NETWORK Approved Plan
-
Compliant?
-
Quantity
-
Initials
-
Date
-
Comments
-
Correct wiring and earth system
-
Compliant?
-
Quantity
-
Initials
-
Date
-
Comments
-
Protective covers extend over cables by a min of 40mm each side, in trenches and at the pole
-
Compliant?
-
Quantity
-
Initials
-
Date
-
Comments
-
Cables terminated and secure
-
Compliant?
-
Quantity
-
Initials
-
Date
-
Comments
-
Numbers and Signs attached
-
Compliant?
-
Quantity
-
Initials
-
Date
-
Comments
-
Non standard pole & lamp– Network approved
-
Compliant?
-
Quantity
-
Initials
-
Date
-
Comments
-
Neutrals Tagged
-
Compliant?
-
Quantity
-
Initials
-
Date
-
Comments
PITS
-
All locations correct in relation to title peg
-
Compliant?
-
Quantity
-
Initials
-
Date
-
Comments
-
All conduits installed correctly into pits (min 100mm into pit)
-
Compliant?
-
Quantity
-
Initials
-
Date
-
Comments
-
Final level – No tripping hazard
-
Compliant?
-
Quantity
-
Initials
-
Date
-
Comments
-
Footpath encasement (150mm)
-
Compliant?
-
Quantity
-
Initials
-
Date
-
Comments
-
Bodies not distorted, lid installed and free from rubble (not jammed).
-
Compliant?
-
Quantity
-
Initials
-
Date
-
Comments
-
Cables terminated
-
Compliant?
-
Quantity
-
Initials
-
Date
-
Comments
-
Neutrals Tagged
-
Compliant?
-
Quantity
-
Initials
-
Date
-
Comments
PILLARS / CABINETS
-
Location correct / offset
-
Compliant?
-
Quantity
-
Initials
-
Date
-
Comments
-
Depth – compliant
-
Compliant?
-
Quantity
-
Initials
-
Date
-
Comments
-
Bollard installed as per plan
-
Compliant?
-
Quantity
-
Initials
-
Date
-
Comments
-
Cables terminated and tagged
-
Compliant?
-
Quantity
-
Initials
-
Date
-
Comments
-
Switches Level
-
Compliant?
-
Quantity
-
Initials
-
Date
-
Comments
-
Locks/seals installed
-
Compliant?
-
Quantity
-
Initials
-
Date
-
Comments
CABLEHEAD POLES
-
Ladder rest installed (If applicable)
-
Compliant?
-
Quantity
-
Initials
-
Date
-
Comments
-
Correct cable guards fitted
-
Compliant?
-
Quantity
-
Initials
-
Date
-
Comments
-
Labels fitted
-
Compliant?
-
Quantity
-
Initials
-
Date
-
Comments
-
Correct Surge Diverters fitted (Voltage)
-
Compliant?
-
Quantity
-
Initials
-
Date
-
Comments
-
Correct Fused Overhead Line Circuit Breaker installed (LV- F.O.L.C.B)
-
Compliant?
-
Quantity
-
Initials
-
Date
-
Comments
-
Correct Fuses/Blades available (LV)
-
Compliant?
-
Quantity
-
Initials
-
Date
-
Comments
-
Neutrals Tagged
-
Compliant?
-
Quantity
-
Initials
-
Date
-
Comments
COMMISSIONING WORK
-
Earthing Results
-
Compliant?
-
Quantity
-
Initials
-
Date
-
Comments
-
LV Cable Test Results
-
Compliant?
-
Quantity
-
Initials
-
Date
-
Comments
-
HV Cable Test Results
-
Compliant?
-
Quantity
-
Initials
-
Date
-
Comments
-
HV Cable Clearance
-
Compliant?
-
Quantity
-
Initials
-
Date
-
Comments
-
LV Cable Clearance
-
Compliant?
-
Quantity
-
Initials
-
Date
-
Comments
-
Substation Clearance
-
Compliant?
-
Quantity
-
Initials
-
Date
-
Comments
-
As Built drawings
-
Compliant?
-
Quantity
-
Initials
-
Date
-
Comments
-
DIS (Asset Sheet)
-
Compliant?
-
Quantity
-
Initials
-
Date
-
Comments
-
“Constructor’s Declaration” form Available for Operator
-
Compliant?
-
Quantity
-
Initials
-
Date
-
Comments
-
NON-COMPLIANCES (Indicate status as follows)
- Yes
- No
- N/A
-
NOTES (Attach extra sheets as required)
-
Photographs
-
Declaration: The above project complies with all relevant Network Technical Standards and is ready for handover. “Constructor’s Declaration” form Available for Operator
-
Network Approved or Staged Worksite Auditor