Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
The Back Bar
-
Are all bottles aligned to plan with no gaps
-
Are all bottles clean with speed pourer facing to the right
-
Are the tills clean with working equipment
-
Garnish boards set with non perishables - Welsh Flags - Salt (Covered with day dot)
-
Are all bottles married up?
-
Bottles covered?
Under Stations
-
Have shelves been pulled out?<br>Juices stocked, 6 deep of each
-
Metal work checked
-
Has back wall and floor been scrubbed?
Draught Stations
-
Glass mats washed & dried
-
Draught pumps wiped?<br>Draught nozzles flushed, dried & re attached
-
Have the coolers been pulled out and deck scrubbed?
-
Metal work checked?
Fridges
-
Fridge seals wiped & windows polished
-
Fridge vents cleaned out
-
Fridge edges checked?
-
Fully stocked to plan Top shelf (from left to right) Vedett blond x 0/5 Vedett White x 0/5 Brooklyn x 0/5 Desperado x 1/3 Tiger x 0/10 Budweiser x 0/10 Cubanisto x 0/10 Middle shelf Rek strawberry x 15 Heineken x 1/6 Sol x 1/6 Peroni x 1/6 Bottom shelf Hooch x 18 Bummers cherry x 0/6 Bulmers 0/9 Rek passion 0/6
Station
-
Speed rail married up an set to plan<br>
-
Soda guns wiped<br>Nozzle taken off and cleaned<br>Hose wiped and dried
-
Bar equipment cleaned and back in position - single Jigger - Wine jigger - Boston Tin - Boston Glass - Bar spoon - Strainer - Fine strainer
-
Bar mats washed and dried<br>Bar tidy cleaned & stocked with<br>- Long straws<br>- 11 inch Straws<br>- Jumbo straws<br>- lolly sticks<br>- napkins
-
Metal work checked and and fully dry
Bar check
-
Sticky check under the front bar and around stations?
-
Metal work in bin wells checked Floor scrubbed Back wall wiped
Front bar
-
Front bar wiped and presentable