Information
-
JOB CARD
-
Order Number:
-
Customer name:
-
Conducted on
-
Site Address:
-
Work Ordered:
RISK ASSESSMENT/JSEA
-
Tick the hazards that apply to the job, and refer to appropriate SWMS & Procedures to implement as effective controls.
-
Live Parts
-
Refer to SWMS:
- Asbestos
- Confined Spaces
- Demolition & Dismantling
- Excavation & Dismantling
- Hazardous Substances
- Heights
- Plant
- Working Near Overhead Powerlines
- Working on or Near a Road
- Working on or Near Energized Electrical Equipment
-
Refer to Procedure:
- 3.12 Testing and Tagging
- 3.14 Testing an installation
- 3.15 Accessing a pit or pillar
- 4.12 Manual Handling
- 3.1 Live Work
- 4.11 Using mobile scaffolds
- 3.9 Isolate, Lockout & Test
- 3.10 Working in the vicinity of live parts
- 3.3 Working on Electrical Equipment
- 4.10 Ladders
- 4.4 Excavation and Trenching
- 4.13 Safe working with Asbestos
- 4.8 Heights
- Other
- 3.17 Working in Ceiling, Crawl in space & on conductive roof
-
Procedure number & Title:
-
Powered Tools
-
Refer to SWMS:
- Asbestos
- Confined Spaces
- Demolition & Dismantling
- Excavation & Dismantling
- Hazardous Substances
- Heights
- Plant
- Working Near Overhead Powerlines
- Working on or Near a Road
- Working on or Near Energized Electrical Equipment
-
Refer to Procedure:
- 3.12 Testing and Tagging
- 3.14 Testing an installation
- 3.15 Accessing a pit or pillar
- 4.12 Manual Handling
- 3.1 Live Work
- 4.11 Using mobile scaffolds
- 3.9 Isolate, Lockout & Test
- 3.10 Working in the vicinity of live parts
- 3.3 Working on Electrical Equipment
- 4.10 Ladders
- 4.4 Excavation and Trenching
- 4.13 Safe working with Asbestos
- 4.8 Heights
- Other
- 3.17 Working in Ceiling, Crawl in space & on conductive roof
-
Procedure Number & Title:
-
Ladders
-
Refer to SWMS:
- Asbestos
- Confined Spaces
- Demolition & Dismantling
- Excavation & Dismantling
- Hazardous Substances
- Heights
- Plant
- Working Near Overhead Powerlines
- Working on or Near a Road
- Working on or Near Energized Electrical Equipment
-
Refer to Procedure:
- 3.12 Testing and Tagging
- 3.14 Testing an installation
- 3.15 Accessing a pit or pillar
- 4.12 Manual Handling
- 3.1 Live Work
- 4.11 Using mobile scaffolds
- 3.9 Isolate, Lockout & Test
- 3.10 Working in the vicinity of live parts
- 3.3 Working on Electrical Equipment
- 4.10 Ladders
- 4.4 Excavation and Trenching
- 4.13 Safe working with Asbestos
- 4.8 Heights
- Other
- 3.17 Working in Ceiling, Crawl in space & on conductive roof
-
Procedure Number & Title:
-
Manual Handling
-
Refer to SWMS:
- Asbestos
- Confined Spaces
- Demolition & Dismantling
- Excavation & Dismantling
- Hazardous Substances
- Heights
- Plant
- Working Near Overhead Powerlines
- Working on or Near a Road
- Working on or Near Energized Electrical Equipment
-
Refer to Procedure:
- 3.12 Testing and Tagging
- 3.14 Testing an installation
- 3.15 Accessing a pit or pillar
- 4.12 Manual Handling
- 3.1 Live Work
- 4.11 Using mobile scaffolds
- 3.9 Isolate, Lockout & Test
- 3.10 Working in the vicinity of live parts
- 3.3 Working on Electrical Equipment
- 4.10 Ladders
- 4.4 Excavation and Trenching
- 4.13 Safe working with Asbestos
- 4.8 Heights
- Other
- 3.17 Working in Ceiling, Crawl in space & on conductive roof
-
Procedure Number & Title
-
Working in Ceilings/Crawl in spaces/Conductive Roofs
-
Refer to SWMS:
- Asbestos
- Confined Spaces
- Demolition & Dismantling
- Excavation & Dismantling
- Hazardous Substances
- Heights
- Plant
- Working Near Overhead Powerlines
- Working on or Near a Road
- Working on or Near Energized Electrical Equipment
-
Refer to Procedure:
- 3.12 Testing and Tagging
- 3.14 Testing an installation
- 3.15 Accessing a pit or pillar
- 4.12 Manual Handling
- 3.1 Live Work
- 4.11 Using mobile scaffolds
- 3.9 Isolate, Lockout & Test
- 3.10 Working in the vicinity of live parts
- 3.3 Working on Electrical Equipment
- 4.10 Ladders
- 4.4 Excavation and Trenching
- 4.13 Safe working with Asbestos
- 4.8 Heights
- Other
- 3.17 Working in Ceiling, Crawl in space & on conductive roof
-
Procedure Number & Title:
-
Asbestos
-
Refer to SWMS:
- Asbestos
- Confined Spaces
- Demolition & Dismantling
- Excavation & Dismantling
- Hazardous Substances
- Heights
- Plant
- Working Near Overhead Powerlines
- Working on or Near a Road
- Working on or Near Energized Electrical Equipment
-
Refer to Procedure:
- 3.12 Testing and Tagging
- 3.14 Testing an installation
- 3.15 Accessing a pit or pillar
- 4.12 Manual Handling
- 3.1 Live Work
- 4.11 Using mobile scaffolds
- 3.9 Isolate, Lockout & Test
- 3.10 Working in the vicinity of live parts
- 3.3 Working on Electrical Equipment
- 4.10 Ladders
- 4.4 Excavation and Trenching
- 4.13 Safe working with Asbestos
- 4.8 Heights
- Other
- 3.17 Working in Ceiling, Crawl in space & on conductive roof
-
Procedure Number & Title:
-
Access/Egress
-
Refer to SWMS:
- Asbestos
- Confined Spaces
- Demolition & Dismantling
- Excavation & Dismantling
- Hazardous Substances
- Heights
- Plant
- Working Near Overhead Powerlines
- Working on or Near a Road
- Working on or Near Energized Electrical Equipment
-
Refer to Procedure:
- 3.12 Testing and Tagging
- 3.14 Testing an installation
- 3.15 Accessing a pit or pillar
- 4.12 Manual Handling
- 3.1 Live Work
- 4.11 Using mobile scaffolds
- 3.9 Isolate, Lockout & Test
- 3.10 Working in the vicinity of live parts
- 3.3 Working on Electrical Equipment
- 4.10 Ladders
- 4.4 Excavation and Trenching
- 4.13 Safe working with Asbestos
- 4.8 Heights
- Other
- 3.17 Working in Ceiling, Crawl in space & on conductive roof
-
Procedure Number & Title:
-
Working at Heights
-
Refer to SWMS:
- Asbestos
- Confined Spaces
- Demolition & Dismantling
- Excavation & Dismantling
- Hazardous Substances
- Heights
- Plant
- Working Near Overhead Powerlines
- Working on or Near a Road
- Working on or Near Energized Electrical Equipment
-
Refer to Procedure:
- 3.12 Testing and Tagging
- 3.14 Testing an installation
- 3.15 Accessing a pit or pillar
- 4.12 Manual Handling
- 3.1 Live Work
- 4.11 Using mobile scaffolds
- 3.9 Isolate, Lockout & Test
- 3.10 Working in the vicinity of live parts
- 3.3 Working on Electrical Equipment
- 4.10 Ladders
- 4.4 Excavation and Trenching
- 4.13 Safe working with Asbestos
- 4.8 Heights
- Other
- 3.17 Working in Ceiling, Crawl in space & on conductive roof
-
Procedure Number & Title
SITE SPECIFIC RISK ASSESSMENT
-
Are there any additional Hazards/Risks that have not yet been identified and effective controls implemented?
-
Additional Hazard/Risk:
-
Likelihood of Risk Eventuating:
-
Consequence of Risk Eventuating:
-
Controls to be implemented:
-
Residual Likelihood of Risk:
-
Residual Consequence of Risk:
-
Are there any additional Hazards/Risks that have not yet been identified and effective controls implemented?
-
Additional Hazard/Risk:
-
Likelihood of Risk Eventuating:
-
Consequence of Risk Eventuating:
-
Controls to be implemented:
-
Residual Likelihood of Risk
-
Residual Consequence of Risk:
-
Are there any additional Hazards/Risks that have not yet been identified and effective controls implemented?
-
Additional Hazard/Risk:
-
Likelihood of Risk Eventuating:
-
Consequence of Risk Eventuating:
-
Controls to be implemented:
-
Residual Likelihood of Risk:
-
Residual Consequence of Risk:
-
I certify that the nominated control measures have been implemented:
TEST RESULTS
-
Circuit:
-
Visual Inspection
-
Continuity Test - OHMS
-
Insulation Resistance - MEGOHM
-
Polarity Test
-
Correct Circuit Connection
-
Verification of Fault Loop Impedance
-
RCD Operation
-
Test Date
-
Circuit:
-
Visual Inspection
-
Continuity Test - OHMS
-
Insulation Resistance - MEGOHM
-
Polarity Test
-
Correct Circuit Connection
-
Verification of Fault Loop Impedance
-
RCD Operation
-
Test Date
-
Job Tested/Inspected/Connected by:
-
Licence Number:
JOB DETAILS
-
Work Completed:
-
Add media
-
Time Commenced
-
Time Completed
-
Total Hours:
-
Materials Used
-
Customer's Acknowledgement:
-
I acknowledge that the work detailed above is a true and accurate record of the work performed on my property, and I am satisfied with the job completed.