Information
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Has the PO been verified to the requisition?
-
Have the packing slips been verified to the PO?
-
Has the back order log been maintained?
-
Have the vendor evaluations been completed?
-
Photograph material handling area
-
Has the QC material checking sheet been used?
-
Photograph lay down area
-
Is the batching log up to date?
-
Photograph quarantine area
-
Is there a material receiving log?
-
Is there an equipment log?
-
Have the approved submittals been verified to the equipment being received?
-
Is there owner supplied equipment on this project?
-
If there is owner supplied equipment, there should be a method of tracking, labeling and storing this equipment.
List the owner supplied equipment here.
Equipment
-
Is there a lay down area?
-
Is there a set method of receiving material?
-
How many times is the material being moved before it reaches the area where it is installed?
-
Is there an effective method for storing and distributing consumables?