Information

  • Audit Titie

  • Client / Jobsite

  • Hunt Foreman

  • ECSI Foreman

  • Hunt Project Manager

  • ECSI Project Manager

  • General Contractor or Construction Management

  • Prepared by

  • Conducted on

Previous Jobsite Safety Survey

  • Was previous survey reviewed?

  • Are there any outstanding items?

Personal Protective Equipment

  • High-Visibility Vest/Other

  • Gloves/Hard Hat/Safety Glasses

Material Handling & Ergonomics

  • Proper material storage, handling, loading area, Other

  • Tools, Hilti, core drill, bender, ect...

Electrical

  • GFCI Inspections Current

  • Temporary Lighting

  • Enclosures Entact/Doors closed

  • Proper Support for Cables

  • Weather Protection

  • Cord & Cable Condition/ Open Splicing

  • Pulling equipment condition,knockouts, panel condition, misc concerns.

  • Live Work Authorization-Review Results

  • LOTO & Electrical Safe Work Practices

  • Flash Kit complete or in compliance

  • Other electrical issues

Ladders

  • Extension Ladders

  • Stepladders

Walking & Working Surfaces

  • Trip/slip/fall

  • Stairways/Handrails

  • Mud, Water-Snow-Ice Removal

  • Housekeeping

  • Egress

Fall Protection

  • Floor Openings I.e covers, secured and marked

  • Guardrails/Toeboards

  • Roof Flagging

  • Loading area enclosed correctly.

  • Personal Fall Arrest Equipment Condition/Proper Use

Fire Protection

  • Emergency Plan In Place

  • Fire Extinguishers

  • Live Sprinklers?

Employee Health

  • No

  • Yes

  • Site Conditions
  • Add media

  • Dust Control/Dust Masks

  • Proper Clean Up of Slurry

  • Sanitation

  • Air Condition I.e C.O, welding

  • PACM Survey & Procedures

Aerial Lifts and/or a Scaffolding

  • Aerial lifts In use check if yes.

  • Set Up
  • Annual inspection (lifts only).

  • Daily inspection Done

  • Chains/gates closed

  • Weather rated, clean, other

  • Scaffolding In Use check if yes.

  • Set Up
  • Access

  • Proper footing, level, feet, screw jacks ect...

  • Guardrails and decking complete on working level

  • Diagonal brace on rolling scaffold

  • Inspected

  • Set Up
  • Access

  • Proper footing, level, feet, screw jacks ect...

  • Guardrails and decking complete on working level

  • Diagonal brace on rolling scaffold

  • Inspected

Excavations

  • No

  • Yes

  • Overview of Trench or Excavation
  • Add media

  • Proper Slope, Spoil pile back 2', Shore, fracturing, water accumulation, ect...

  • Egress within 25 Feet, ladder usage.

  • Air Concerns with trenches over 4' in depth

Cranes & Rigging

  • No-Hunt not in control.

  • Yes-Hunt is in control.

  • Process overview
  • Add media

  • Loads Properly Controlled

  • Rigging condition

  • Pick plan reviewed by Hunt.

Misc

  • Other safety concerns?

  • Best practices

  • ECSI on site today?

Employee Safety Contacts

  • Name & Comments:

  • Any 1st year or Pre-Apprentices?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.