Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Personnel
Previous Jobsite Safety Survey
-
Was previous survey reviewed?
-
Are there any outstanding items?
Personal Protective Equipment
-
Hard Hat<br>
-
Safety Glasses
-
Gloves
-
High-Visibility Vest
Material Handling & Ergonomics
-
Morning Stretching Completed
-
Spool Handling
-
Material Handling Aids
Electrical
-
LOTO & Electrical Safe Work Practices
-
Live Work Authorization - Review Results
-
Enclosures Entact
-
Temporary Lighting
-
GFCI Inspections Current
-
Proper Support for Cables
-
Temporary Splices Properly Executed
-
Cord & Cable Condition
-
Weather Protection
Walking & Working Surfaces
-
Housekeeping
-
Water-Mud-Snow-Ice Removal
-
Building Egress
-
Other
Ladder Use
-
Stepladders
-
Extension Ladders
Boom and Scissors Lift Operations
-
Safety Chains Used on Lifts
-
Pre-Shift Inspection Performed
-
Tied Off When Required
-
Annual Inpections Current
Fall Protection
-
Guardrails and Warning Lines
-
Holes Covered
-
Personal Fall Arrest System
Fire Protection
-
Fire Extinguishers
-
Combustible Loads Managed
-
Hot Work Procedures
-
Are there live sprinkler heads on this job?
Employee Health
-
Sanitation
-
Dust Control
-
Fireproofing Clean Up
-
Wet Concrete Cutting & Boring
-
Proper Clean Up of Slurry
-
Carbon Monoxide
-
PACM Survey & Procedures
-
Other
Scaffolding
-
Inspected by Competent Person
-
Baseplates & Mudsills
-
Guardrails
-
Working Level Completely Decked
-
Diagonal Brace on Rolling Tower
-
Proper Access (Ladders & Stairs)
-
Miscellaneous (pins, wind clips, anchorage)
Excavations
-
Proper Slope & Shore
-
Spoils Pile Set Back 2 Feet
-
Egress within 25 Feet
-
Ladder Use
-
Daily Inspection by Competent Person
Cranes & Rigging
-
Crews Under Loads
-
Loads Properly Controlled
-
Sling Condition & Storage
Miscellaneous
-
Health & Safety
-
Environmental
-
Other
Short Service Employee - Contacts
-
Name & Comments:
-
Name & Comments:
Employee Safety Contacts
-
Name & Comments:
-
Name & Comments:
-
Name & Comments: