Information

  • Jobsite

  • General Contractor or Construction Management

  • Conducted on

  • Prepared by

  • General Contractor or Construction Management

  • Foreman

Previous Jobsite Safety Survey

  • Was previous survey reviewed?

  • Are there any outstanding items?

Personal Protective Equipment

  • High-Visibility Vest/Other

  • Gloves

  • Hard Hat<br>

  • Safety Glasses

  • Daily stretching

Material Handling & Ergonomics

  • Proper material storage, handling ect...

  • Tools, Hilti, core drill, bender, ect...

Electrical

    Overview of Our Electrical
  • Proper Support for Cables

  • Enclosures Entact/Doors closed

  • GFCI Inspections Current

  • Weather Protection

  • Spool Handling, tuggers, puller condition

  • LOTO & Electrical Safe Work Practices

  • Cord & Cable Condition/ Open Splicing

  • Temporary Lighting

Walking & Working Surfaces

  • Mud, Water-Snow-Ice Removal

  • Housekeeping

  • Floor Openings I.e covers, secured and marked

Ladders

  • Extension Ladders

  • Stepladders

Fall Protection

  • No

  • Yes, Multi Level or Roof Work Taking Place

  • 6' Or More Fall exposure Assessment
  • Add media

  • Guardrails/Toeboards

  • Roof Flagging

  • Personal Fall Arrest Equipment Condition/Proper Use

  • Loading area enclosed correctly.

Fire Protection

  • Emergency Plan In Place

  • Fire Extinguishers

  • Live Sprinklers?

Employee Health

  • No

  • Yes

  • Site Conditions
  • Add media

  • Dust Control/Dust Masks

  • Proper Clean Up of Slurry

  • Sanitation

  • Air Condition I.e C.O, welding

  • PACM Survey & Procedures

Aerial Lifts and/or a Scaffolding

  • No

  • Annual inspection (lifts only).

  • Chains/gates closed

  • Weather rated, clean, other

  • Scaffolding In Use check if yes.

  • Set Up
  • Access

  • Proper footing, level, feet, screw jacks ect...

  • Guardrails and decking complete on working level

  • Diagonal brace on rolling scaffold

  • Inspected

Excavations

  • No

  • Yes

  • Overview of Trench or Excavation
  • Add media

  • Proper Slope, Spoil pile back 2', Shore, fracturing, water accumulation, ect...

  • Egress within 25 Feet, ladder usage.

  • Air Concerns

Cranes & Rigging

  • No-Hunt not in control.

  • Yes-Hunt is in control.

  • Process overview
  • Add media

  • Loads Properly Controlled

  • Rigging condition

  • Pick plan reviewed by Hunt.

Employee Safety Contacts

  • Name & Comments:

  • Name & Comments:

  • Other

  • ECSI on site today?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.