Title Page
-
Conducted on
-
Prepared by
-
Add location
-
What type of machine to be installed
- Shop floor fully automatic
- Back of house semi automatic ( in view)
- Back of house semi automatic ( out of sight)
-
Take a photo of the latest GA plan
-
Take multiple photos of the shop floor
-
Take photos of the proposed position of the machine
-
Take measurements of the area for installation with any pinch points.
-
How far away is the fuse board.
-
Take photos of the fuse board.
-
Take photos above the trade counter ceiling if the machine is being installed on the shop floor.
-
Are there any 13amp plug sockets very close to the proposed position that could be used.
-
Take photos of the latest asbestos report if applicable ( age of site)
-
What will be the entrance route for the key cutting machine and are there any pinch points
-
Take photos of the entrance route for the machine.
-
Any further information you think will relate to this installation
-
Area manager for the site
-
Store manager or duty manager on site during the scope
-
Person completing the audit
-
Select date