Information

  • Document No.

  • Job Name

  • Department

  • Foreman

  • Conducted on

  • Audited by

  • Location

Site Safety Audit

Administrative

  • Health and Safety Manual Onsite

  • MSDS Notebook Onsite

  • Claims Packet Onsite

  • Medcor Programmed into all Company Phones. Stickers on Hardhats / Toolbox<br>1-800-775-5866

  • Weekly Toolbox Talk Complete

  • First Aid Kit Onsite

  • Date First Aid Kit Expires

  • Fire Extinguishers Available Onsite

  • Hot Work Permit Completed

  • Daily Huddle completed and documented

  • Aerial Lift / Forklift inspection complete and documented

  • Stretching routine completed before work start

  • Lean Trucks - Are you proud of the appearance of your truck?

PPE

  • Hardhats, Safety Glasses and Work boots worn by all employees

  • Additional PPE Worn / Available

Electrical

  • Electrical cords are in good condition

  • Cords are tested and taped per the assured grounding policy, section 11.2 of the Health and Safety Manual

  • GFCI is used at the electrical source

Fall Protection and Fall Prevention

  • Harnesses & Lanyards stored properly when not in use

  • Anchor Points provided or approved anchor point device in use

  • Holes created by WSFP covered or filled

  • Guardrails in good condition

  • Work performed from aerial lifts is conducted safely

Ladders

  • Ladders are in good condition

  • Ladder stickers (maximum load, OSHA safety stickers) are legible

  • Work performed from ladders is being performed safely

Material Handling & Storage

  • Good Housekeeping in WSFP lay-down area

  • Carts in use

  • Rigging / Slings in good condition

  • Material Stored neatly and in order out of the way of traffic

  • Forklift Operator operates the forklift safely

  • Hand tools are in good condition. No cheater bars or cracked handles.

General Jobsite Comments

Saves / Near Miss Incidents

  • Describe the incident or any lesson learned

  • Date of Save / Near Miss

General Jobsite Comments

  • Comments

Loss Prevention

  • Field knows to NEVER WORK ON A LIVE SYSTEM and TRUST BUT VERIFY

Pre-Job Risk Management

  • Sure Off Tester is Available and Foreman knows how to use them

  • Signed Contract or Agreement in place

  • Pre-authorization Signature signed

  • Control Valve is shut

  • Main Drain is open

  • Trapped Water is drained

  • Owners product in work area is removed or protected

  • Plastic in use

Post-Job Risk Management - reviewed / discussed with the crew Onsite

  • Test with air before introducing water

  • Turn on water in small increments and check work area for leaks

  • Obtain second signature on service work ticket

  • Circle system either in service or out of service

  • If "out of service" notify the owner/ owners representative, use Deactivation Authorization and notify the proper authorities

  • Clean up work area

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.