Stage 1 - Structural integrity

  • Have pull test been undertaken in this area - 10% of all new / renewed fixings

  • Has torque testing been undertaken - all new and renewed fixings

Stage 2 - Remediation of shims & brackets

  • Have all plastic shims been removed and replaced with metal, new brackets introduced where shims exceed 25mm, all box section packers removed and replaced with metal shims

  • Have new intermediate rails been installed in correct position with the correct fixing type as per the construction issue drawings and structural details

  • Have the remedials to the concrete substrate been made good

Stage 3 - Cladding Panel, Coping, Brise Soleil

  • Has making good to existing cladding panel finished been undertaken using the correct material and warranted for 15 years minimum

  • Has the cladding panels been installed at the correct position and free from defects or scratches

  • Has the coping panels been secured as per the correct detail

  • Has the Brise Soleil been been recoated, reinstalled, and defect free

Stage 4 - Handover

  • Has this area been snagged by both LS and Clevetts and all items raised closed down

  • Sectional completion issued

  • Sectional completion certificate

  • Signed for on behalf of Lancer Scott

Photo Evidence

  • Photos

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.